NewActive

RAJDARBAR SPACES PHASE-3

Agra, Uttar Pradesh
01-12-2023
Launch Date
New
Type
22-04-2028
Completion Date

Overview

Launch Date

01-12-2023

Completion Date

22-04-2028

RERA ID

UPRERAPRJ895548/02/2024

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)32811
Project NameRAJDARBAR SPACES PHASE-3
Registration Fee (in Rs.)169500
AddressKhasra No. 83 Part and 89 Part, Muauja Chauhatna, Tehsil & Distt. Agra
Village/Locality/Sector etc.Chauhtana, Bichpuri
StateUttar Pradesh
Project Duration (In month)53
DistrictAgra
Original Start Date-
TehsilAgra
Proposed Start Date01-12-2023
Sanctioning Competent AuthorityAgra Development Authority
Project Cost (in Lacs)3418
Proposed Completion Date22-04-2028

Location

Latitude

27.179693

Longitude

77.911235

Bank Details

Account Details
Account Number5020083607692
Bank NameHDFC BANK LIMITED
Branch AddressShop No. 3,4, 11, Ground Floor, Block No. 17/2/4, Friends Plaza, Sanjay Place Agra
Branch DistrictAgra
Branch Email Addressnavin.sharma@hdfcbank.com
Branch NameSanjay Place, Agra
Branch StateUttar Pradesh
IFSC CodeHDFC0000121
Name of the AccountRAPL-RAJDARBAR SPACES PH-3 COLLECTION AC
Separate Account Details
Name of the AccountRAPL-RAJDARBAR SPACES PH-3 SEPARATE AC
Account Number50200083607689
Bank NameHDFC BANK LTD
Branch NameSanjay Place, Agra
Branch AddressShop No. 3,4,11 Ground Floor, block No. 17/2/4, Friends Plaza, Sanjay Place, Agra
Branch StateUttar Pradesh
Branch DistrictAgra
IFSC CodeHDFC0000121
Transaction Account Details
Name of the AccountRAPL- RAJDARBAR SPACES PH-3 TRANSACTION AC
Account Number5020009602586
Bank NameHDFC BANK LTD.
Branch NameSanjay Place, Agra
Branch AddressShop No. 3,4, 11 Ground Floor, Block No. 17/2/4, Freinds Plaza, Sanjay Place, Agra
Branch StateUttar Pradesh
Branch DistrictAgra
IFSC CodeHDFC0000121

Development Works

Demarcation of Plots

All the plots and project land as a whole will be demarcated as per the approved layout. The dimensions and orientations of plots , roads parks will be as per approved layout.

Boundary Wall

The 6 to 8 feet high boundary wall. The brick-mortar wall will be erected at project periphery and will be plastered and painted with all weather paint.

Road Work

The project roads will be 7.5 m and 9.0 m wide as a carriageway. The construction will be done as per the provisions and specifications.

Footpaths

The interlocking tiles will be placed for walkways and footpaths. The interlocking paver blocks will be placed over a compacted base and a bed of sand

Water Supply Including Drinking Water Facilities

The ground water will be pumped to the overhead tank and will be supplied to each unit through underground pipe system. The system will be designed for flow under gravity and will be installed with the provisions for inspection

Sewer System

The soil pipe underground system will be installed. The 300mm dia pipe will be connected through bends and inspection chambers . Te sewer will be collected from each unit and will be lead to STP.

Drain

The Covered and open drains will be constructed in trapezoidal shape with top with of 300mm appx to collect the waste water.

Parks

All the parks as per layout and landscape plan will be developed into a lush green piece of land. The park will have the walking and sitting areas along with amenities for kids.

Tree Planting

The trees will be planted at all suitable locations of the project . The trees will be selected in consultation with horticulture expert .

Design For Electric Supply Including Street Lighting

The transformer and the distribution will be installed as per the load allocated for the project by the electricity department. The overhead

Community Buildings

Not Applicable

Treatment and Disposal System of Sewage and Sullage water

State of Art sewage treatment plant will be installed to cater for the domestic effuse if the project. The multi stage mechanism will bring down the effluents within the permissible limit of the municipal corporation before disposal.

Solid Waste Management And Disposal System

The dalab ghars or Garbage collection centers will be constructed in three numbers with each having area of 15 sq.m. Other than this the dustbins will be installed at all suitable location of the project.

Water Conservation System

Three rainwater harvesting pits will be installed. The each will have 50000l capacity. The surface runoff and rainwater will be collected and filtered down through layered filtration process.

Energy Management System Including Use of Renewable Energy

Not Applicable

Fire Protection And Fire Safety System

Not Applicable

Social Infrastructure And Other Public Amenities Including Public Health Services

Not Applicable

Emergency Evacuation Services

Not Applicable

Other Miscellaneous Work

All activities for the improvement in project facilities

Documents

Registry Document

No: 4473 | Date: 25-06-2005

Registry Document

No: 945 | Date: 28-01-2022

Extract of Khatauni

No: 1428-1433 | Date: -

Extract of Khatauni

No: 1428-1433 | Date: -

Details of Encumbrances

Other Plan(If Any)

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Development Work Plan

Other

Proforma of Agreement for Sale

Details of Encumbrances

Uploaded: 04-12-2023

Commencement Certificate

Uploaded: 24-11-2023

Proforma of Application Form

Uploaded: 24-11-2023

Proforma of Allotment Letter

Uploaded: 24-11-2023

Proforma of Conveyance Deed

Uploaded: 08-01-2024

Waste Disposal Plan

Uploaded: 24-11-2023

Water Supply Plan

Uploaded: 24-11-2023

Electricity Supply Plan

Uploaded: 24-11-2023

Development Work Plan

Uploaded: 08-01-2024

Affidavit

Uploaded: 10-01-2024

CA CERTIFICATE

Uploaded: 10-01-2024

ARCHITECT CERTIFICATE

Uploaded: 10-01-2024

ENGINEERS CERTIFICATE

Uploaded: 24-11-2023

Other

Uploaded: 20-01-2024

Proforma of Agreement for Sale

Uploaded: 04-12-2023

Permits

Orignal Permit NoPlotted Resi development/ Plotted Housing/03440/ADA/LD/22-23/0824/13092022
Orignal Permit Date23-04-2023
Valid Upto22-04-2028
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto21-04-2031
End Date22-04-2028
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)Jai Shree Shyam Contractor
Contractor Address104, North Vijay Nagar Clony, Agra 282004
Architect NameRamvir Singh
Architect AddressClock C-12, Shop No. F-12, Near Max Mall, Sanjay place Agra
Architect Licence NumberCA/2018/91290
Structural Engineer NameDaya Shankar Sharma
Structural Engineer Address5, Kaveri Center, Sanjay Place Agra
Mobile number(Project Co-ordinator)7055117557

Khasra Details

Total Area

34575.00

372161.84 ft²

2 plots
Khasra
TypeKhasra
Khasra/Plot No83 part, Mauja Chauhtana
Area(In Sq. Mt.)23050
Khasra
TypeKhasra
Khasra/Plot No89 part, Mauja Chauhtana
Area(In Sq. Mt.)11525

Other Details

Contractor Name (if any)Jai Shree Shyam Contractor
Contractor Address104, North Vijay Nagar Clony, Agra 282004
Architect NameRamvir Singh
Architect AddressClock C-12, Shop No. F-12, Near Max Mall, Sanjay place Agra
Architect Licence NumberCA/2018/91290
Structural Engineer NameDaya Shankar Sharma
Structural Engineer Address5, Kaveri Center, Sanjay Place Agra
Mobile number(Project Co-ordinator)7055117557