All the plots and project land as a whole will be demarcated as per the approved layout. The dimensions and orientations of plots , roads parks will be as per approved layout.
The 6 to 8 feet high boundary wall. The brick-mortar wall will be erected at project periphery and will be plastered and painted with all weather paint.
The project roads will be 7.5 m and 9.0 m wide as a carriageway. The construction will be done as per the provisions and specifications.
The interlocking tiles will be placed for walkways and footpaths. The interlocking paver blocks will be placed over a compacted base and a bed of sand
The ground water will be pumped to the overhead tank and will be supplied to each unit through underground pipe system. The system will be designed for flow under gravity and will be installed with the provisions for inspection
The soil pipe underground system will be installed. The 300mm dia pipe will be connected through bends and inspection chambers . Te sewer will be collected from each unit and will be lead to STP.
The Covered and open drains will be constructed in trapezoidal shape with top with of 300mm appx to collect the waste water.
All the parks as per layout and landscape plan will be developed into a lush green piece of land. The park will have the walking and sitting areas along with amenities for kids.
The trees will be planted at all suitable locations of the project . The trees will be selected in consultation with horticulture expert .
The transformer and the distribution will be installed as per the load allocated for the project by the electricity department. The overhead
Not Applicable
State of Art sewage treatment plant will be installed to cater for the domestic effuse if the project. The multi stage mechanism will bring down the effluents within the permissible limit of the municipal corporation before disposal.
The dalab ghars or Garbage collection centers will be constructed in three numbers with each having area of 15 sq.m. Other than this the dustbins will be installed at all suitable location of the project.
Three rainwater harvesting pits will be installed. The each will have 50000l capacity. The surface runoff and rainwater will be collected and filtered down through layered filtration process.
Not Applicable
Not Applicable
Not Applicable
Not Applicable
All activities for the improvement in project facilities
Total Area
34575.00 m²
372161.84 ft²