Demarcation of plots will be done as per approved layout . Total number of plots are 14 nos.
The boundary wall will be completed at the initial stage of the project which is upto is 3m in high that is built in 0.23m thick Brick wall.
The width of internal road is 12m in thickness of 200mm, base is of G and B.
The width of footpath is 2.00m wide along the road .
Water supply will be provided by developer through pump room. Providing and Looping of HDPE pipes and suitable for the respecting working pressure with all fittings completed.
S.T.P (Sewer Treatment Plant) is proposed by developer (150-300mm).
Providing and Laying of cast in site RCC Drain. Storm Lines have been provided by developers along the road . The dia of pipes waries from (150-300mm).
Land has been reserved for park .
Landscaping and Tree planting will be done as per planting layout.
Electrical Substation are proposed by developer. Street lightning lines laid along the road . The distance between street lighting will be 15-20m approx .
N/A
STP system is proposed by developer for treatment and disposal system of sewage and sullage water . The sewar lines are around 150-300mm.
Solid waste Management and disposal system is provided by developer. Pipe lines are laid under ground .
Rain water conservation will be done by construction of Rain water Harvesting tank
N/A
N/A
N/A
N/A
N/A
Showing 1 blocks with 1 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
13169.00 m²
141749.80 ft²