NEWActive

PROPEX CITY 2

PALWAL, PALWAL
22-04-2025
RERA Received Date
NEW
Type
2030-02-28
Completion Date

Overview

RERA Received Date

22-04-2025

Completion Date

2030-02-28

RERA ID

RERA-PKL-1672-2025

Basic Details

Project NamePROPEX CITY 2
Project IDRERA-PKL-1672-2025
Project TypeNEW
Applicant TypeFirm
Submission Date22-04-2025 10:28:38 AM
Builder NameCBG REALTECH LLP
CINNot specified
PANAASFC8072C
WebsiteNot specified
Phone (Mobile)9711802285
Phone (Landline)Not specified
Registered AddressS-338, UPPAL SOUTHEND, SECTOR-49, GURGAON, HARYANA-122018
Project AddressSECTOR-8, SOHNA ROAD, PALWAL
DistrictPALWAL
TehsilPALWAL

Bank Details

Bank NameHDFC BANK
Account Number50200108252699
IFSC CodeHDFC0000622
MICR Code110240111
Branch Code622

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)KAPIL KUMAR R/o S 338 UPPAL SOUTHEND SECTOR-49 GURUGRAM HARYANA-122018
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Attached

Development Details

Land Area5.00 (Acre)
Proposed FAR200
Permissible FAR200
Total Licensed Land5.00 (Acre)

Land Usage

PLOTS TO BE SOLD2.5732
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0
CONSTRUCTION OF ROADS1.5319
PAVEMENTS0
PARKS AND PLAYGROUNDS0.3885
GREEN BELTS0
VEHICLE PARKINGS0
ELECTRICITY SUB-STATION0.0062
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0.5002
ANY OTHER0
Total5

Cost Details

Land Cost1022.76 Lakhs
Other Cost316.64 Lakhs
Estimated Project Cost1887.06 Lakhs
Estimated Infrastructure Cost547.66 Lakhs
Estimated Apartment Construction Cost0 Lakhs

Documents

ZONING PLAN

Uploaded on: 16-04-2025

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 11-04-2025

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 11-04-2025

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 11-04-2025

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 11-04-2025

DEMARCATION PLAN

Uploaded on: 16-04-2025

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 22-04-2025

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 22-04-2025

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 22-04-2025

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 22-04-2025

Statutory Approvals

LICENSE NO 34 OF 2025Date: 24-03-2025Status: ALREADY BEEN OBTAINED
DEMARCATION CUM ZONING PLAN OF AFFORDABLE PLOTTING VIDE DRG. NO. DTCP 11006Date: 15-04-2025Status: ALREADY BEEN OBTAINED
DEMARCATION CUM ZONING PLAN OF COMMERCIAL VIDE DRG. NO. DTCP 11007Date: 15-04-2025Status: ALREADY BEEN OBTAINED
LAYOUT PLAN DRAWING NO. 10953 DATED 25.03.25Date: 25-03-2025Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: No
Site PlanApproved: No
Floor PlanApproved: No
Apartment PlansApproved: No
Elevation SectionApproved: No
Detail of Permissible FARApproved: No
Detail of covered area achieved FARApproved: No

Facilities

INTERNAL ROADS AND PAVEMENTSYET TO BE PREPARED
WATER SUPPLY SYSTEMYET TO BE PREPARED
STORM WATER DRAINAGEYET TO BE PREPARED
ELECTRICITY SUPPLY SYSTEMYET TO BE PREPARED
SEWAGE TREATMENT & GARBAGE DISPOSALYET TO BE PREPARED
STREET LIGHTINGYET TO BE PREPARED
SECURITY AND FIRE FIGHTINGYET TO BE PREPARED
PLAYGROUNDS AND PARKSYET TO BE PREPARED
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERYET TO BE PREPARED

NOC

ROADSProvider: HSVPApproval Status: Pending
WATER SUPPLYProvider: HSVPApproval Status: Pending
ELECTRICITYProvider: DHBVNApproval Status: Pending
SEWAGE DISPOSALProvider: HSVPApproval Status: Pending
STORM WATER DRAINAGEProvider: HSVPApproval Status: Pending

Project Team

Authorized Representative

RAJESH KUSHWAHA
Name
RAJESH KUSHWAHA
PAN
XXXX744B
Mobile
9717939043
Landline
N/A
Address
L158-59 MOHAN GARDEN NEAR HARRY MODEL SCHOOL UTTAM NAGAR MOHAN GARDEN WEST DELHI-110059

Contact Details

Project ContactEmail: [email protected]Mobile: 9711802285Landline: N/A
Project Contact PersonName: MANISH GOELEmail: [email protected]Mobile: 9711802285Landline: N/A

Land Details

Land Area5.00 (Acre)
Proposed FAR200
Permissible FAR200
Total Licensed Land5.00 (Acre)

Land Usage

Land Cost1022.76 Lakhs
Other Cost316.64 Lakhs
Estimated Project Cost1887.06 Lakhs
Estimated Infrastructure Cost547.66 Lakhs
Estimated Apartment Construction Cost0 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2025 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres-000
Electricity Supply System-000
Other-111
Parks and Playgrounds-000
Roads & Pavements-666
Sewerage treatment & garbage disposal-333
Shopping area-000
Storm Water Drainage-222
Water Supply System-555
2026 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System1111
Other1111
Parks and Playgrounds0000
Roads & Pavements6666
Sewerage treatment & garbage disposal4444
Shopping area0000
Storm Water Drainage3333
Water Supply System7777
2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System1222
Other1122
Parks and Playgrounds1111
Roads & Pavements6666
Sewerage treatment & garbage disposal4444
Shopping area0000
Storm Water Drainage4444
Water Supply System7888
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System3333
Other2222
Parks and Playgrounds1111
Roads & Pavements7777
Sewerage treatment & garbage disposal4555
Shopping area0000
Storm Water Drainage5555
Water Supply System9999
2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System3333
Other2222
Parks and Playgrounds1111
Roads & Pavements8888
Sewerage treatment & garbage disposal6666
Shopping area0000
Storm Water Drainage6666
Water Supply System9999
2030 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0---
Electricity Supply System3.52---
Other1---
Parks and Playgrounds1.59---
Roads & Pavements8.16---
Sewerage treatment & garbage disposal9.85---
Shopping area0---
Storm Water Drainage8.35---
Water Supply System5.19---

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSENA
WALL FINISHING DETAILSNA
KITCHEN DETAILSNA
BATHROOM FITTINGSNA
WOOD WORK ETCNA
DOORS AND WINDOS FRAMESNA
GLASS WORKNA
ELECTRIC FITTINGSNA
CONDUCTING AND WIRING DETAILSNA
CUPBOARD DETAILSNA
WATER STORAGENA
LIFT DETAILSNA
EXTERNAL GLAZINGSNA
WINDOWS/GLAZINGSNA
DOORSNA
MAIN DOORSNA
INTERNAL DOORSNA
AIR CONDITIONINGNA
ELECTRICAL FITTINGSNA
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMENA
INTERNAL FINISHINGNA

Unit-wise Specifications

TOILET
FLOORNA
WALLSNA
CEILINGNA
COUNTERSNA
SANITARY WARE/CP FITTINGSNA
FIXTURESNA
KITCHEN
FLOORNA
WALLSNA
CEILINGNA
COUNTERSNA
FIXTURESNA
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORNA
WALLS & CEILINGNA
RAILINGSNA
FIXTURESNA
BED ROOMS
FLOORNA
WALLSNA
CEILINGNA
WARDROBESNA
MASTER TOILET
FLOORNA
WALLSNA
CEILINGNA
COUNTERSNA
SANITARY WARE/CP FITTINGSNA
FITTING/FIXTURESNA
MASTER BEDROOM/DRESSROOM
FLOORNA
WALLSNA
CEILINGNA
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORNA
WALLSNA
CEILINGNA
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORNA
WALLS & CEILINGNA
TOILETNA
BALCONYNA

Fee Details

Payment 1
amount:112500
cheque no:605
draft date:05-04-2025
payable to:HRERA Panchkula
payee bank:HDFC BANK