28' 38' 17.83' North
77' 20' 48.61' East
Already completed.
Partially completed.
Not Applicable.
Shall be made on completion of the project.
Water supply connection from appropriate authority shall be taken upon completion and occupancy.
Sewer facility of GDA already exists in the area. NOC has been given from concerned department of GDA for sewer connection. The same shall be taken upon completion of the project and occupancy.
To be developed.
Not Applicable.
Shall be done as per requirement of Sanctioned Layout.
Shall be done after determining actual load requirement. However, NOC from Electricity department obtained regarding grant of electric load sanction for all the units sanctioned and planned.
Not Applicable.
Not Applicable.
Not Applicable.
Rain Water Harvesting shall be done as per requirement of sanctioned layouts by the time of completion of the project.
Not Applicable.
Plans prepared, and on the same basis, NOC granted from Fire Department, State of U.P. Core cutting work completed. System shall be installed by the time of completion and offer of occupancy.
Not Applicable.
Emergency exit stair case provided in addition to the main stair case as per requirement of Fire Norms. In addition, 6 meter thorough drive way shall be provided for free movement of fire tender as per requirement of Fire norms.
Provision of gym, community hall etc. is proposed as additional facilities which shall be provided by the time of offer of occupancy.
Showing 1 blocks with 90 units
Total Area
7448.66 m²
80176.63 ft²
Total Units
112
3 different types
Blocks & Floors
1
27 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
2560.00 m²
27555.58 ft²