NewActive

Valencia Tower GH-17

Lucknow, Uttar Pradesh
15-10-2028Completion
NewType
LucknowDistrict
1000 LCost

Basic Details

Project Type:New
Project Category:Residential
Total area in round figure (Sq.mt.):11148
Project Name:Valencia Tower GH-17
Registration Fee (in Rs.):61000
Address:Not specified
Village/Locality/Sector etc.:Not specified
State:Uttar Pradesh
Project Duration (In month):61
District:Lucknow
Original Start Date:-
Tehsil:Lucknow
Proposed Start Date:15-10-2023
Sanctioning Competent Authority:Lucknow Development Authority
Project Cost (in Lacs):1000
Proposed Completion Date:15-10-2028

Location

Latitude

26.828307

Longitude

26.828608

Bank Details

Account no.:50200068635437
Name Of Account Holder:M/S. ANS DPL SEP RERA AC VALENCIA TOWER GH-17
Bank Name:HDFC Bank
Branch Address:TC-V-13-2/A, Vibhuti Khand, Gomti Nagar, Lucknow-226010
Branch Name:VIBHUTI KHAND
IFSC Code:HDFC0004805

Development Works

Demarcation of Plots

This is one plot polygon shaped abutting internal road from South side. Site has one entrance and one exit. Site is surrounded by other plots from North, Green area from South, Valencia County villas from East and Future expansion plot from West.

Boundary Wall

1.8 - 2.1m high and 200 mm thick Boundary wall designed. Brick Work of 9inches and rcc work in column and beam may be used as per design. Entrance and exit gates are developed with boundary.

Road Work

Trimix finish/ bitumen will be used as per design suggested by the Architect for internal road.

Footpaths

All internal roads will have narrow footpath with matt finish tiles pavers or equivalent finishes.

Water Supply Including Drinking Water Facilities

All apartments shall be provided with domestic water for household activities and STP treated water for flushing. Clear water may also be used and user can have their individual RO system as per their requirement. The STP treated water shall also be supplied for irrigation purposes. For the same water tanks are getting created in underground and on terrace. Separate tanks are provided for fire water.

Sewer System

Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for treatment. after treatment ,water shall be recycled and it will use in gardening, flush tanks and vehicle washing, overflow from the STP shall be connect with the Municipal sewerage system.

Drain

Storm water system shall be Provided. Storm water from Roads and other landscape area shall be connected to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.

Parks

There are significant green area including green parks,Tree Boulevard, Green Mounds, play areas for childrens and different recreational activities.

Tree Planting

The trees of category ornamental ,shady and native species shall be planted in the entire project as per the species recommended in the landscape in order to maintain greenery and natural view.

Design For Electric Supply Including Street Lighting

We have designed the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting with timer control,STP,Pump room etc.

Community Buildings

A multipurpose hall connected through towers at ground floor with the amenities viz. Jacuzzi,gynasium,spa,beauty salon, indor games etc shall be provided.

Treatment and Disposal System of Sewage and Sullage water

Centralized Sewerage system for entire project and all towers shall be connected to STP . All Sewerage water shall go to the STP for treatment after treatment ,water shall be recycle and it will use in gardening, flush tanks and vehicle washing, overflow from the STP shall be connect with the Municipal sewerage system.

Solid Waste Management And Disposal System

Project shall have  waste segregation area. The solid waste shall be encouraged for segregation. Dustbins shall be provided for segregated waste in the common areas within the campus and other waste shall be handed over to the government vendors for further disposal.

Water Conservation System

A well designed rain water harvesting system shall be provided for the whole building complex to conserve water by ensuring adequate nos. of recharge pits

Energy Management System Including Use of Renewable Energy

We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. Also timer controlled panels shall be used for efficient energy management.

Fire Protection And Fire Safety System

All Fire norms shall be followed as per NBC Part 4 code and approval of fire department. fire sprinklers,FHC with pumps are provided as per norms.

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

Fire Staircase is provided in the each building, basements have access and exit in case of emergency. Dedicated assembly areas defined in the campus. Adequate signage is also provided.

Other Miscellaneous Work

Other amenities viz. Swimming pool for Adults and kids,Change rooms, Meeting Rooms,Pergola With Seating,Lush Green,Kids play area,MuGA Court,Fountain,Private seating zone,Jogging track,Pet Park,Deck area with seating,Tree Boulevard,Tennis Court,Outdoor GYM,Green Mounds and many more also propvided for recreational activities.

New Documents

Extract of Khatauni

No: 1428-1433 (01.07.2020 to 30.06.2026) | Date: -

Sale Deed

No: 6758 | Date: 27-05-2011

Sale Deed

No: 5396 | Date: 18-04-2015

Extract of Khatauni

No: Reply to objection letter dated 21.04.2023 | Date: -

Extract of Khatauni

No: Consent Letter from LDA with respect to owner name of map being ANS Developers | Date: -

Uploaded Documents

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 18-04-2023

Commencement Certificate

Uploaded: 19-04-2023

Proforma of Application Form

Uploaded: 19-04-2023

Proforma of Allotment Letter

Uploaded: 19-04-2023

Proforma of Conveyance Deed

Uploaded: 19-04-2023

Waste Disposal Plan

Uploaded: 18-04-2023

Water Supply Plan

Uploaded: 18-04-2023

Electricity Supply Plan

Uploaded: 18-04-2023

Development Work Plan

Uploaded: 18-04-2023

Affidavit

Uploaded: 18-04-2023

CA CERTIFICATE

Uploaded: 18-04-2023

ARCHITECT CERTIFICATE

Uploaded: 18-04-2023

ENGINEERS CERTIFICATE

Uploaded: 18-04-2023

Other

Uploaded: 18-04-2023

Permits

Orignal Permit NoGroup Housing/07429/LDA/BP/22-23/2933/01032023
Orignal Permit Date17-04-2023
Valid Upto16-04-2028
Permit Extendable Upto16-04-2031
End Date15-10-2028

Project Team

Contractor Name (if any)Mr. Nirmal Jain (Modern Construction Company Indian)
Contractor Address902, Akash Deep Building, 26A, Barakhamba Road, New Delhi-110001
Architect NameShivam Srivastava
Architect AddressVibhut Khand, Gomti Nagar
Architect Licence NumberCA/2010/50742
Structural Engineer NameMr. Pankish Goel (TPC Technical Projects Consultants Pvt. Ltd.)
Structural Engineer AddressB-74, Sector-57, Noida-201301
Mobile number(Project Co-ordinator)8810779340

Project Land Details

AFS

Showing 3 blocks with 102 units

Property Summary

Total Area

42758.10

460243.91 ft²

Total Units

198

2 different types

Blocks & Floors

3

34 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:215.95
Balconies:396
Parking ratio:0.00 per unit

Block Tower A

34 units

Block Tower B

34 units

Block Tower C

34 units

Khasra Details

Total Area

16660.00

179326.57 ft²

1 plot
Khasra
Type:Khasra
Khasra/Plot No:78, 79
Area(In Sq. Mt.):16660

Other Details

Contractor Name (if any):Mr. Nirmal Jain (Modern Construction Company Indian)
Contractor Address:902, Akash Deep Building, 26A, Barakhamba Road, New Delhi-110001
Architect Name:Shivam Srivastava
Architect Address:Vibhut Khand, Gomti Nagar
Architect Licence Number:CA/2010/50742
Structural Engineer Name:Mr. Pankish Goel (TPC Technical Projects Consultants Pvt. Ltd.)
Structural Engineer Address:B-74, Sector-57, Noida-201301
Mobile number(Project Co-ordinator):8810779340