NewActive

Valencia County East GH-18

Lucknow, Uttar Pradesh
20-10-2026Completion
NewType
LucknowDistrict
15783 LCost

Basic Details

Project Type:New
Project Category:Residential
Total area in round figure (Sq.mt.):44812
Project Name:Valencia County East GH-18
Registration Fee (in Rs.):229500
Address:Not specified
Village/Locality/Sector etc.:Not specified
State:Uttar Pradesh
Project Duration (In month):49
District:Lucknow
Original Start Date:-
Tehsil:Lucknow
Proposed Start Date:20-10-2022
Sanctioning Competent Authority:Lucknow Development Authority
Project Cost (in Lacs):15783
Proposed Completion Date:20-10-2026

Location

Latitude

26.828155

Longitude

81.025789

Bank Details

Account Details
Name of the Account:M/S ANS DPL COL AC VALENCIA COUNTY EAST GH-18
Account Number:50200068128280
Bank Name:HDFC Bank
Branch Name:VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW
Branch Address:VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW
Branch State:Uttar Pradesh
Branch District:Lucknow
IFSC Code:HDFC0004805
Separate Account Details
Name of the Account:M/S ANS DPL SEP AC VALENCIA COUNTY EAST GH-18
Account Number:50200068128110
Bank Name:HDFC Bank
Branch Name:VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW
Branch Address:VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW
Branch State:Uttar Pradesh
Branch District:Lucknow
IFSC Code:HDFC0004805
Transaction Account Details
Name of the Account:M/S ANS DPL TRANS AC VALENCIA COUNTY EAST GH-18
Account Number:50200068158576
Bank Name:HDFC Bank
Branch Name:VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW
Branch Address:VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW
Branch State:Uttar Pradesh
Branch District:Lucknow
IFSC Code:HDFC0004805

Development Works

Demarcation of Plots

This is single plot polygon shaped , having total 1 no. of entry gate/ exit gate from the 30m wide front road. Site is surrounded by other plots of developers from one side from two sided with 45 mtr & 30 mtr roads respectively and one side by others plot.

Boundary Wall

1.8 - 2.1m high and 200 mm thick Boundary wall designed . Brick Work of 9inches and rcc work in column and beam may be used as per design. Entrance and exit gates are developed with boundary.

Road Work

Trimix finish/ bitumen will be used as per design suggested by the Architect for internal road.

Footpaths

All internal roads will have narrow footpath with matt finish tiles pavers or equivalent finishes.

Water Supply Including Drinking Water Facilities

Ground water may also be used, Als users can used their individual RO system as per their requirement. Overhead tanks shall be provided on building terrace for distribution through gravity.

Sewer System

Centralized Sewerage system shall be Provided. All Sewerage water shall go to the central STP for treatment. After treatment ,water shall be recycled and it will be used in gardening, flush tanks.Oveflow from the central STP shall be connected with the Municipal sewerage system.

Drain

Storm water system shall be Provided. Storm water from Roads and other landscape area shall be connected to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connected with Municiple drain line.

Parks

There are many green/ landscape area in front/ beside of Villas including green parks, play areas for children and different recreational activities.

Tree Planting

There are different type of tree plantation is proposed at site in order to maintatin greenary and natural view.

Design For Electric Supply Including Street Lighting

We have designed the system as per local electricity board and considered centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting, STP, Pump room etc.

Community Buildings

NA (Community building already exist in township.)

Treatment and Disposal System of Sewage and Sullage water

Centralized Sewerage system shall be Provided. All Sewerage water shall go to the central STP for treatement, after treatement ,water shall be recycled and it will be used in gardening, flush tanks. Oveflow from the STP shall be connected with the Municiple sewarage system.

Solid Waste Management And Disposal System

There are proper garbage collection area provided for the solid waste management.

Water Conservation System

A well designed rain water harvesting system shall be provided for the whole building/villa complex to conserve water.

Energy Management System Including Use of Renewable Energy

We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor.

Fire Protection And Fire Safety System

All the fire norms shall be followed as NBC and approval of fire department

Social Infrastructure And Other Public Amenities Including Public Health Services

Green/ landscape area in front/ beside of Villas including green parks, play areas for children and different recreational activities.

Emergency Evacuation Services

NA

Other Miscellaneous Work

Lush green shrubs at every vacant space on ground.

New Documents

Registry Document

No: 4251 | Date: 01-04-2015

Registry Document

No: 4798 | Date: 09-04-2015

Registry Document

No: 5396 | Date: 18-04-2015

Lease Deed

No: 9652 | Date: 24-06-2015

Extract of Khatauni

No: Khatauni extracts | Date: -

Extract of Khatauni

No: Khatauni extracts for Khasra 147, 149, 251 | Date: -

Sale Deed

No: 8785 | Date: 06-07-2011

Sale Deed

No: 8785 | Date: 06-07-2011

Sale Deed

No: 8785 | Date: 06-07-2011

Registry Document

No: 2587 | Date: 18-02-2016

Sale Deed

No: 9011 | Date: 05-06-2014

Extract of Khatauni

No: Land Acquisition Letter u/s 4 for Khasra 147, 149, 251 | Date: -

Sale Deed

No: 9010 | Date: 05-06-2014

Sale Deed

No: 17453 | Date: 20-10-2014

Extract of Khatauni

No: Land Area Chart | Date: -

Extract of Khatauni

No: Electricity Plan_Valencia County East GH-18 | Date: -

Extract of Khatauni

No: Water Supply and Waste Disposal Plan_Valencia County East GH-18 | Date: -

Extract of Khatauni

No: Reply to query letter no. 13460/UPRERA/Tech Cell/2022-23 dated 18.11.2022 | Date: -

Extract of Khatauni

No: Reply to query letter no. 13742/UPRERA/Project Reg/2022-23 dated 29.11.2022 | Date: -

Extract of Khatauni

No: Revised Affidavit submission against query letter no. 13742/UPRERA/Project Reg/2022-23 dated 29.11. | Date: -

Uploaded Documents

Proforma of Completion Certificate(Occupancy)

CA CERTIFICATE

Details of Encumbrances

Uploaded: 21-07-2022

Commencement Certificate

Uploaded: 21-07-2022

Other Plan(If Any)

Uploaded: 21-07-2022

Proforma of Application Form

Uploaded: 21-07-2022

Proforma of Allotment Letter

Uploaded: 22-11-2022

Proforma of Conveyance Deed

Uploaded: 22-11-2022

Waste Disposal Plan

Uploaded: 02-11-2022

Water Supply Plan

Uploaded: 02-11-2022

Electricity Supply Plan

Uploaded: 02-11-2022

Development Work Plan

Uploaded: 02-11-2022

Affidavit

Uploaded: 21-07-2022

CA CERTIFICATE

Uploaded: 02-11-2022

ARCHITECT CERTIFICATE

Uploaded: 28-10-2022

ENGINEERS CERTIFICATE

Uploaded: 28-10-2022

Other

Uploaded: 21-07-2022

Permits

Orignal Permit NoGroup Housing/05115/LDA/BP/21-22/1761/20052022
Orignal Permit Date17-06-2022
Valid Upto16-06-2027
Permit Extendable Upto16-06-2030
End Date20-10-2026

Project Team

Contractor Name (if any)Mr. Tejpal Singh
Contractor Address"Vill.-E222,Govindpuri,Modinagar Ghaziabad, U.P-201204"
Architect NameShivam Srivastava
Architect Address11th floor, Shalimar Titanium Vibhuti Khand Gomti Nagar Lucknow-226010 UP India
Architect Licence NumberCA/2010/50742
Structural Engineer NameRucha Watve
Structural Engineer Address"Sai Radhe, Office No 201, 2nd floor 100 Kennedy Road, Behind Hotel Sheraton Grand,regista Pune 411001"
Mobile number(Project Co-ordinator)9891042472

Project Land Details

AFS

Showing 51 blocks with 204 units

Property Summary

Total Area

7270.57

78259.69 ft²

Total Units

51

1 different types

Blocks & Floors

51

4 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:142.56
Balconies:240
Parking ratio:0.00 per unit

Block 1

4 units

Block 2

4 units

Block 3

4 units

Block 4

4 units

Block 5

4 units

Block 6

4 units

Block 7

4 units

Block 8

4 units

Block 9

4 units

Block 10

4 units

Block 11

4 units

Block 12

4 units

Block 14

4 units

Block 15

4 units

Block 16

4 units

Block 17

4 units

Block 18

4 units

Block 19

4 units

Block 20

4 units

Block 21

4 units

Block 22

4 units

Block 23

4 units

Block 24

4 units

Block 25

4 units

Block 26

4 units

Block 27

4 units

Block 28

4 units

Block 29

4 units

Block 30

4 units

Block 31

4 units

Block 32

4 units

Block 33

4 units

Block 34

4 units

Block 35

4 units

Block 36

4 units

Block 37

4 units

Block 64

4 units

Block 65

4 units

Block 66

4 units

Block 67

4 units

Block 68

4 units

Block 69

4 units

Block 70

4 units

Block 71

4 units

Block 72

4 units

Block 73

4 units

Block 74

4 units

Block 75

4 units

Block 76

4 units

Block 77

4 units

Block 78

4 units

Khasra Details

Total Area

44812.00

482351.89 ft²

1 plot
Khasra
Type:Khasra
Khasra/Plot No:134, 135, 138 Ka, 138Kha, 138 Ga, 140, 143 Ka, 143 Kha, 144, 145, 146, 147, 148, 149, 150 Ka, 150 Kha, 150 Ga, 150 Da, 150 Gha, 151, 152, 153, 154, 155, 156Ka, 156 Kha, 157, 158, 159, 160, 161, 162, 163 Part, 164, 165, 166, 167, 168, 169, 170, 171, 172, 173, 174, 175, 177, 180, 181, 182, 183, 184, 244, 245, 246, 248, 249, 250, 251
Area(In Sq. Mt.):44812

Other Details

Contractor Name (if any):Mr. Tejpal Singh
Contractor Address:"Vill.-E222,Govindpuri,Modinagar Ghaziabad, U.P-201204"
Architect Name:Shivam Srivastava
Architect Address:11th floor, Shalimar Titanium Vibhuti Khand Gomti Nagar Lucknow-226010 UP India
Architect Licence Number:CA/2010/50742
Structural Engineer Name:Rucha Watve
Structural Engineer Address:"Sai Radhe, Office No 201, 2nd floor 100 Kennedy Road, Behind Hotel Sheraton Grand,regista Pune 411001"
Mobile number(Project Co-ordinator):9891042472