Group housing at plot no-194, 196, 197, 2170, 2171, 2177, agarsain marg , village- sahawal and surju, muzaffarnagar.
2M HIGH AND 230MM THICK BRICK WORK IN COLUMN AND BEAM. AT THE CENTRE FACE OF THE BOUNDARY WALL THERE WOULD BE A LOGO OF THE PROJECT WHICH GAVE A BEAUTIFULL DESIGN TO BOUNDARY WALL
FROM THE MAIN ENTRANCE GATE WE HAVE 80MM THICK INTERLOCKING BRICK ROAD THROUGH OUT THE PROJECT. WHOSE WIDENESS STARTS FROM 10MTR .ALL ROAD IN THE COMPLEX WILL BE INTERLOCKING.
FROM THE MAIN ENTRANCE GATE WE HAVE 60MM THICK INTERLOCKING BRICK FOOTHPATH THROUGH OUT THE PROJECT .WHOSE WIDENESS STARTS FROM 8MTR . ALL FOOTPATH IN THE COMPLEX WILL BE INTERLOCKING.
WE WILL PROVIDE WATER SUPPLY FOR THE REQUIREMENT OF ALL BLOCKS THROUGH UNDERGROUND TANK WHICH WILL GETWATER SUPPLY FROM WATER SUPPLY LINES GIVEN TO US BY (RCC Tank capacity 12000 x 9= 108000 liture.)
MODULAR SEERAGE SYSTEM SHALL BE PROVIDED. ALL SEWERAGE WATER SHALL BE GO TO THE STP AND OVERFLOW FROM THE STP SHALL BE CONNECT WITH THE MUNICIPAL SEWERAGE SYSTEM. WHEN COME INTO FORCE.
STORM WATER SHALL BE PROVIDED. STORM WATER FROMROADS AND OTHER LANDSCAPE AREA SHALL BE CONNECT TO THE STORM WATER DRAIN CHANNELAND GO TO THE RAIN WATER HARVESTING PIT FOR RECHARGE THE GROUNG WATER AND OVERFLOW SHALL BE CONNECT WITH MUNICIPAL DRAIN LINE . WE PROVIDE RCC DRAIN IN WHOLE PROJECT.
15 PERCENT park with Greenry+ Plantation
WE WILL PROVIDE MANY TYPES OF TREEALL ALONG THE BOUNDARY WALL GREEN AREAS (3 mitr distancing Tree to Tree)
WE WILL DESIGN AND IMPLEMENT THE SYSTEM AS PER LOCAL ELECTRICITY BOAR AND WILL CONSIDERCENTRALIZED TRANSFORMER. HTPANEL, LT PANEL , FEEDER, PILLER AND DG BACKUP FOR COMMON SERVICES LIKE EXTERNAL LIGHTINGH, FOUNTAIN, STP PUMP ROOM ETC. WE PROVID ELECTRICITY SUPPLY THROUGH 11/10.433 KV Transformers and by DG SET Supply for backup
NOT APPLICABLE
MODULAR SEWERAGE SYSTEM SHALL BE PROVIDED. ALL SEWERAGE WATER SHALL BE GO TO THE STP AND OVERFLOW FROM THE STP SHALL BE CONNECT WITH THE MUNICIPLA SEWERAGE SYSTEM, WHEN COMES INTO FORCE
Solid waste to be collected from individual flats and stored in garbage room, Recyclable shall be processed in the compost machine to make
RAIN WATER HARVESTING PITS shall be provided for groundwater recharging and over flow to be discharged in the MUNICIPAL DRAIN TREATMENT SEWAGE
NA
SPRINKER FIRE DOORS YARD HYDRANT SMOKE DETECTERAND FIRE ALARM SYSTEM WILL BE PROVIDED AS APPLICABLE
COMMON SOCIAL INFRASTRUCTURE SHALL BE PROVIDED FOR ALL THE PHASES COMBINED
FIRE STAIRECASES SHALL BE PROVIDED AS PER THE APPROVED FIRE DRAWING FOR EXCAVATION TO OPEN AREAS
NA
Showing 6 blocks with 105 units
Total Carpet Area
41403.84 m²
445666.79 ft²
Total Units
406
2 different types
Blocks & Floors
6
7 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
17355.00 m²
186807.48 ft²