26.879641
80.569820
There are372 plots in the scheme inclusive of residential and 5 percent commercial plots .
Boundary wall covering whole project will be built.
Roads have been provided to cater all the plots. The width of the road is in conformity with LIDA guidelines. The roads will be constructed after consolidation of natural earth, thereafter laying of 150 mm thick sub base followed by 75mm thick WBM followed by 25mm thick SDBC
No seperate space for foothpaths have been kept..
The provision of one over Head Water Tank has been made to cater the needs of residents. The capacity of the tank will be 300 KL. The water supply will be provided through 110 dia PVC pipes
The disposal of sewage is through digester of appropriate capacity. All plots are connected to manhole of required size followed by connection to main sewer through 200 dia and 300 dia hume pipes. At present, the discharge which will be connected to main sewer of LIDA. The waste water shall be use For gardening where as manure shall be disposed off as per standard practice or Govt. norms.
The drainage shall be through K.C. drains.
6 parks have been provided at various location. The area of the park has been left in conformity with the LIDA norms and guidelines. The park shall be provided with seasonal/ deciduous trees.
1200 trees shall be planted as per proposed layout plan. Apart from trees, the park shall be provided with regional shrubs, plants, swings for children
There is provision of three phase overhead electrical supply lines. The pole shall be placed as per drawings however, pole to pole distance will not be more than 30 meters or at every turn. The street lights shall be provided on every pole. The connection to every dweller shall be provided as per power corporation norms. The transformer of appropriate capacity shall be installed.
No Community Buildings are planned in the project yet.
The disposal of sewage is through digester of appropriate capacity. All plots are connected to manhole of required size followed by connection to main sewer through 200 dia and 300 dia hume pipes. At present, the discharge which will be connected to main sewer of LIDA. The waste water shall be use For gardening where as manure shall be disposed off as per standard practice or Govt. norms. The drainage shall be through K.C. drains.
Not required for now as it IS a plotting project.
No such measures havebeen taken but in future they can plan same
No Measures for now has been taken But Rain Water Harvesting Facility is there for use of Water
Not required for now as it a plotting project.
No such Social Infrastructure is planned .It can be planned later on the discretion of owners buying plots.
As for now it is a plotting project only , so emergency evacuation system will be made on the discretion of owners.
Under process
Showing 1 blocks with 6 units
Total Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
161120.00 m²
1734279.57 ft²