OngoingActive

THE ROMANO (PHASE-II)

Gautam Buddha Nagar, Uttar Pradesh
29-12-2020Completion
OngoingType
Gautam Buddha NagarDistrict
28120 LCost

Basic Details

Project Type:Ongoing
Project Category:Residential
Total area in round figure (Sq.mt.):39700
Project Name:THE ROMANO (PHASE-II)
Registration Fee (in Rs.):203500
Address:Not specified
Village/Locality/Sector etc.:Not specified
State:Uttar Pradesh
Project Duration (In month):83
District:Gautam Buddha Nagar
Original Start Date:22-02-2014
Tehsil:Gautam Buddha Nagar
Proposed Start Date:22-02-2014
Sanctioning Competent Authority:Noida Authority
Project Cost (in Lacs):28120
Proposed Completion Date:29-12-2020

Location

Latitude

28.583806

Longitude

77.407187

Bank Details

Account no.:510341000674130
Name Of Account Holder:IVR PRIME DEVELOPERS (AVADI) PRIVATE LIMITED
Bank Name:CORPORATION BANK
Branch Address:CORPORATION BANK C-45 SECTOR-62, NOIDA
Branch Name:CORPORATION BANK C-45 SECTOR-62, NOIDA
IFSC Code:CORP0001170

Development Works

Demarcation of Plots

As per approved building plans

Boundary Wall

As per approved building plans

Road Work

As per approved building plans

Footpaths

As per approved building plans

Water Supply Including Drinking Water Facilities

Water shall be provided by Authority & internal distribution shall be done by developer.

Sewer System

STP shall be provided for sewerage system.

Drain

Proper drainage system shall be provided

Parks

As per approved plans

Tree Planting

As per approved plans

Design For Electric Supply Including Street Lighting

As per approval from authority.

Community Buildings

As per approved building plans

Treatment and Disposal System of Sewage and Sullage water

STP shall be provided for sewerage system and treated water shall be used for flushing & irrigation system.

Solid Waste Management And Disposal System

Waste shall be segregated and will be treated by organic waste converter. Manure produced shall be used in green area and surplus effluent shall be disposed to authorized vendors.

Water Conservation System

Adequate nos of recharge pits shall be provided

Energy Management System Including Use of Renewable Energy

In common areas LED lights shall be provided with timer control.

Fire Protection And Fire Safety System

As per fire NOC

Social Infrastructure And Other Public Amenities Including Public Health Services

As per approved building plans

Emergency Evacuation Services

As per fire NOC

Other Miscellaneous Work

As per approved building plans

New Documents

Lease Deed

No: 4696 | Date: 24-10-2013

Uploaded Documents

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 06-07-2018

Commencement Certificate

Uploaded: 06-07-2018

Proforma of Application Form

Uploaded: 06-07-2018

Proforma of Allotment Letter

Uploaded: 06-07-2018

Proforma of Conveyance Deed

Uploaded: 06-07-2018

Waste Disposal Plan

Uploaded: 06-07-2018

Water Supply Plan

Uploaded: 06-07-2018

Electricity Supply Plan

Uploaded: 06-07-2018

Development Work Plan

Uploaded: 06-07-2018

Affidavit

Uploaded: 28-05-2019

CA CERTIFICATE

Uploaded: 28-05-2019

ARCHITECT CERTIFICATE

Uploaded: 06-07-2018

ENGINEERS CERTIFICATE

Uploaded: 06-07-2018

Registry Document In Case of Own Land

Uploaded: 30-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 28-12-2017

Authentic copy of Approval of Project

Uploaded: 28-12-2017

Development Work Plan

Uploaded: 29-12-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 29-12-2017

Authentic copy of Approval of Project

Uploaded: 29-12-2017

Permits

Orignal Permit NoIII-227/710
Orignal Permit Date06-12-2013
Valid Upto06-12-2018
Revalidated Permit NoWILL BE APPLIED
Revalidated Permit Date06-12-2023
Revalidated Permit Valid Upto06-12-2023
Permit Extendable Upto06-12-2023
End Date30-12-2019
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra Detail-
Orignal Permit NoCAP/III-277/1102
Orignal Permit Date15-02-2019
Valid Upto14-02-2024
Revalidated Permit NoCAP/III-277/1102
Revalidated Permit Date15-02-2019
Revalidated Permit Valid Upto01-01-1900
Permit Extendable Upto24-02-2024
End Date30-12-2019
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra Detail-

Project Team

Contractor Name (if any)RISHABH BUILDCON
Contractor AddressSEC 75 NOIDA UP 201301
Architect NameVISHAL MITTAL Space Designer International
Architect AddressB-34 Sec-67 Noida ( UP)
Architect Licence NumberCA/98/23185
Structural Engineer NameV D SHARMA Optimum Design
Structural Engineer Address2C/335, VASUNDHARA GHAZIABAD. PIN 201012
Mobile number(Project Co-ordinator)8588033336

Project Land Details

AFS

Showing 10 blocks with 311 units

Property Summary

Total Area

105714.36

1137898.80 ft²

Total Units

1241

4 different types

Blocks & Floors

10

26 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:85.18
Balconies:1233
Parking ratio:0.00 per unit

Block A1

26 units

Block A2

26 units

Block C2

26 units

Block C1

29 units

Block B3

39 units

Block B4

33 units

Block B7

41 units

Block F1

26 units

Block E1

33 units

Block C3

32 units

Khasra Details

Total Area

142967.00

1538882.49 ft²

1 plot
Plot
Type:Plot
Khasra/Plot No:GH 01
Area(In Sq. Mt.):142967

Other Details

Contractor Name (if any):RISHABH BUILDCON
Contractor Address:SEC 75 NOIDA UP 201301
Architect Name:VISHAL MITTAL Space Designer International
Architect Address:B-34 Sec-67 Noida ( UP)
Architect Licence Number:CA/98/23185
Structural Engineer Name:V D SHARMA Optimum Design
Structural Engineer Address:2C/335, VASUNDHARA GHAZIABAD. PIN 201012
Mobile number(Project Co-ordinator):8588033336