NewActive

The Palm Estate

Kanpur Nagar, Uttar Pradesh
01-04-2025
Launch Date
New
Type
19-02-2030
Completion Date

Overview

Launch Date

01-04-2025

Completion Date

19-02-2030

RERA ID

UPRERAPRJ946144/04/2025

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)16570
Project NameThe Palm Estate
Registration Fee (in Rs.)88000
AddressARAZI NO.1670,1671,1672,1673,1674,1662,1663,1675,1676
Village/Locality/Sector etc.Naubasta
StateUttar Pradesh
Project Duration (In month)59
DistrictKanpur Nagar
Original Start Date-
TehsilKanpur
Proposed Start Date01-04-2025
Sanctioning Competent AuthorityKanpur Development Authority
Project Cost (in Lacs)15350
Proposed Completion Date19-02-2030

Location

Latitude

26.398427

Longitude

80.312686

Bank Details

Account Details
Name of the AccountJasia Infra Collection Account for the Palm Estate
Account Number099805002919
Bank NameICICI BANK
Branch NameSWAROOP NAGAR
Branch AddressBuilding 113/171 Swaroop Nagar, Kanpur
IFSC CodeICIC0000998
Branch DistrictKanpur Nagar
Branch StateSelect
Branch Email Addressmohit.gandhi@icicibank.com
Separate Account Details
Name of the AccountJasia Infra Separate Account for the Palm Estate
Account Number099805002920
Bank NameICICI BANK
Branch NameSWAROOP NAGAR
Branch AddressBuilding 113/171 Swaroop Nagar, Kanpur
Branch StateUttar Pradesh
Branch DistrictKanpur Nagar
IFSC CodeICIC0000998
Transaction Account Details
Name of the AccountJasia Infra Transaction Account for the Palm Estate
Account Number099805002921
Bank NameICICI BANK
Branch NameSWAROOP NAGAR
Branch AddressBuilding 113/171 Swaroop Nagar, Kanpur
Branch StateUttar Pradesh
Branch DistrictKanpur Nagar
IFSC CodeICIC0000998

Development Works

Demarcation of Plots

We have one plot of size 16570 sq. mtr.having 1 main entrance gate from the 30 m wide front road.

Boundary Wall

2 m high and 230 mm thick Brick work and rcc work in column and beam.

Road Work

From the main entrance gate we have 80 mm thick RCC road through out the project which will be minimum 6 mt wide.

Footpaths

We Will not provide any footpath

Water Supply Including Drinking Water Facilities

We will provide Two nos. of pump for the requirement of blocks through underground pipelines.

Sewer System

Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system when come into force.

Drain

Storm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.

Parks

We will provide green area with the different activities and the green area will have gaming facilities for kids.

Tree Planting

We will provide many type of trees all along the boundary wall & green area

Design For Electric Supply Including Street Lighting

We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc.

Community Buildings

One Clubhouse of 1415 sq.mt consisting of 3 floors will be constructed.

Treatment and Disposal System of Sewage and Sullage water

Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force.

Solid Waste Management And Disposal System

There are a proper garbage collection area provided for the solid waste management.

Water Conservation System

We will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.

Energy Management System Including Use of Renewable Energy

We will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.

Fire Protection And Fire Safety System

We will provide Fire Fighting facility in common areas while Individual owner can install their own system as per their and local authorities requirement.

Social Infrastructure And Other Public Amenities Including Public Health Services

N/A

Emergency Evacuation Services

We will have staircases which will be provided with emergency exit doors and emergency exit gates

Other Miscellaneous Work

N/A

Documents

Sale Deed

No: 180 | Date: 07-01-2023

Sale Deed

No: 181 | Date: 07-01-2023

Sale Deed

No: 184 | Date: 07-01-2023

Sale Deed

No: 348 | Date: 13-01-2023

Sale Deed

No: 349 | Date: 13-01-2023

Sale Deed

No: 1981 | Date: 20-02-2008

Sale Deed

No: 5241 | Date: 07-07-2007

Sale Deed

No: 5242 | Date: 07-07-2007

Sale Deed

No: 5243 | Date: 07-07-2007

Sale Deed

No: 5244 | Date: 07-07-2007

Sale Deed

No: 5245 | Date: 07-07-2007

Sale Deed

No: 12116 | Date: 06-08-2022

Extract of Khatauni

No: 1428-1433 | Date: -

Sale Deed

No: 943 | Date: 29-01-2025

Registry Document

No: 59 | Date: 01-03-2025

Extract of Khatauni

No: Land Area Details | Date: -

Sale Deed

No: 1980 | Date: 20-02-2008

Sale Deed

No: 5240 | Date: 07-07-2007

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

CA CERTIFICATE

ARCHITECT CERTIFICATE

ENGINEERS CERTIFICATE

Proforma of Agreement for Sale

Details of Encumbrances

Uploaded: 22-03-2025

Commencement Certificate

Uploaded: 03-03-2025

Proforma of Application Form

Uploaded: 04-03-2025

Proforma of Allotment Letter

Uploaded: 04-03-2025

Proforma of Conveyance Deed

Uploaded: 04-03-2025

Waste Disposal Plan

Uploaded: 22-03-2025

Water Supply Plan

Uploaded: 22-03-2025

Electricity Supply Plan

Uploaded: 22-03-2025

Development Work Plan

Uploaded: 04-03-2025

Affidavit

Uploaded: 03-03-2025

CA CERTIFICATE

Uploaded: 17-03-2025

ARCHITECT CERTIFICATE

Uploaded: 17-03-2025

ENGINEERS CERTIFICATE

Uploaded: 17-03-2025

Other

Uploaded: 03-03-2025

Proforma of Agreement for Sale

Uploaded: 04-03-2025

Permits

Orignal Permit NoGroup Housing/06654/KDA/BP/23-24/0534/27082024
Orignal Permit Date21-02-2025
Valid Upto20-02-2030
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto20-02-2033
End Date19-02-2030
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)Self
Contractor AddressSelf
Architect NameArun Kumar
Architect AddressG-1,112/281,SWAROOP NAGAR,KANPUR
Architect Licence NumberCA/94/17629
Structural Engineer NameMr. Omkar Verma
Structural Engineer Address8/14, Indira Nagar, Lucknow, U.P.
Mobile number(Project Co-ordinator)7235889966

Land Details

AFS

Showing 4 blocks with 284 units

Property Summary

Total Carpet Area

33506.88 m²

360664.71 ft²

Total Units

374

2 different types

Blocks & Floors

4

13 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:89.59 m²
Balconies:849
Parking ratio:0.00 per unit

Block TOWER A

68 units

Block TOWER B

51 units

Block TOWER C

45 units

Block TOWER D

120 units

Khasra Details

Total Area

16570.00 m²

178357.82 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No1670, 1671, 1672, 1673, 1674, 1662, 1663, 1675, 1676
Area(In Sq. Mt.)16570

Other Details

Contractor Name (if any)Self
Contractor AddressSelf
Architect NameArun Kumar
Architect AddressG-1,112/281,SWAROOP NAGAR,KANPUR
Architect Licence NumberCA/94/17629
Structural Engineer NameMr. Omkar Verma
Structural Engineer Address8/14, Indira Nagar, Lucknow, U.P.
Mobile number(Project Co-ordinator)7235889966
The Palm Estate by JASIA INFRAJ.P. REALTOR PVT LTD | ReraTracker