OngoingActive

The Iconic Corenthum

Gautam Buddha Nagar, Uttar Pradesh
07-12-2021Completion
OngoingType
Gautam Buddha NagarDistrict
14500 LCost

Basic Details

Project Type:Ongoing
Project Category:Commercial
Total area in round figure (Sq.mt.):20000
Project Name:The Iconic Corenthum
Registration Fee (in Rs.):210000
Address:Not specified
Village/Locality/Sector etc.:Not specified
State:Uttar Pradesh
Project Duration (In month):72
District:Gautam Buddha Nagar
Original Start Date:10-03-2015
Tehsil:Gautam Buddha Nagar
Proposed Start Date:10-12-2015
Sanctioning Competent Authority:Noida Authority
Project Cost (in Lacs):14500
Proposed Completion Date:07-12-2021

Location

Latitude

28 37 39.9 N

Longitude

77 22 22.8 E

Bank Details

Account no.:0200102000023579
Name Of Account Holder:Beaver International (India) Pvt. Ltd.
Bank Name:IDBI BANK LTD.
Branch Address:IDBI Bank Sector 63 Noida
Branch Name:Sector 63 Noida
IFSC Code:IBKL 000200

Development Works

Demarcation of Plots

Designated plots is demarcated as per the Lease plan issued by the Noida Authority,Plot No.A40, Sector 62,Noida

Boundary Wall

Brick and Masonry Boundary wall of 1.5 meter height from internal road

Road Work

Internal roads of cement concrete (CC)

Footpaths

NA

Water Supply Including Drinking Water Facilities

Municipal water supply.

Sewer System

Covered Sewerage system using RCC Pipes.

Drain

Covered drainage system using RCC Pipes.

Parks

Green Plaza area.

Tree Planting

No. of Trees as per as per approved plan.

Design For Electric Supply Including Street Lighting

Electric supply including street lighting is provided as per the layout plan.

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

Treatment of Sewage and sullage water will be through STP plant and treated water shall be used for irrigation as well as flushing as far as possible.

Solid Waste Management And Disposal System

Solid waste management will be by manual segregation and handling.

Water Conservation System

Treated STP water will be used for irrigation and flushing as far as feasible .Rain water harvesting pits provided

Energy Management System Including Use of Renewable Energy

Energy efficient building with energy efficient glazing , LED lights etc.

Fire Protection And Fire Safety System

Fourth generation system as per NFPA and NBC guidelines.

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

Fire Refuge areas and fire stair cases provided.

Other Miscellaneous Work

Other items like Fountain , Planters shall be provided.

New Documents

Lease Deed

No: 1039 | Date: 31-03-1999

Uploaded Documents

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 14-09-2018

Commencement Certificate

Uploaded: 15-09-2018

Other Plan(If Any)

Uploaded: 14-09-2018

Proforma of Application Form

Uploaded: 14-09-2018

Proforma of Allotment Letter

Uploaded: 14-09-2018

Proforma of Conveyance Deed

Uploaded: 14-09-2018

Waste Disposal Plan

Uploaded: 14-09-2018

Water Supply Plan

Uploaded: 14-09-2018

Electricity Supply Plan

Uploaded: 14-09-2018

Development Work Plan

Uploaded: 14-09-2018

Affidavit

Uploaded: 14-09-2018

CA CERTIFICATE

Uploaded: 14-09-2018

ARCHITECT CERTIFICATE

Uploaded: 14-09-2018

ENGINEERS CERTIFICATE

Uploaded: 14-09-2018

Legal Document of Agreement in Case of other Land

Uploaded: 13-08-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 13-08-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 13-08-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 13-08-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 13-08-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 13-08-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 13-08-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 13-08-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 13-08-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 13-08-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 13-08-2017

Details of Encumbrances

Uploaded: 13-08-2017

Proforma of Allotment Letter

Uploaded: 13-08-2017

Water Supply Plan

Uploaded: 13-08-2017

Proforma of Application Form

Uploaded: 13-08-2017

Waste Disposal Plan

Uploaded: 13-08-2017

Affidavit

Uploaded: 13-08-2017

Permits

Orignal Permit No218/422
Orignal Permit Date09-02-2015
Valid Upto09-02-2020
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto09-02-2025
End Date09-06-2020
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra Detail-

Project Team

Contractor Name (if any)NA
Contractor AddressNA
Architect NameHolistics Urban Innovations Pvt. Ltd.
Architect AddressTerrace floor, Tower A., The Corenthum, A-41, Sector 62 G.B. Nagar U.P. 201301
Architect Licence NumberCA/95/18656
Structural Engineer NameEngineering Solutions
Structural Engineer Address701, Tower A, The-Ithum, A-40, Sector 62 Noida G.B. Nagar U.P. 201301
Mobile number(Project Co-ordinator)7835064348

Project Land Details

AFS

Showing 3 blocks with 430 units

Property Summary

Total Area

20677.21

222567.42 ft²

Total Units

411

1 different types

Blocks & Floors

3

29 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:50.31
Balconies:385
Parking ratio:0.00 per unit

Block 1

11 units

Block 2

15 units

Block 3

404 units

Khasra Details

Total Area

20000.00

215278.00 ft²

1 plot
Plot
Type:Plot
Khasra/Plot No:A-41
Area(In Sq. Mt.):20000

Other Details

Contractor Name (if any):NA
Contractor Address:NA
Architect Name:Holistics Urban Innovations Pvt. Ltd.
Architect Address:Terrace floor, Tower A., The Corenthum, A-41, Sector 62 G.B. Nagar U.P. 201301
Architect Licence Number:CA/95/18656
Structural Engineer Name:Engineering Solutions
Structural Engineer Address:701, Tower A, The-Ithum, A-40, Sector 62 Noida G.B. Nagar U.P. 201301
Mobile number(Project Co-ordinator):7835064348