We have total 152 plots of different sizes, from 68 Sqmtr . to 140 Sqmtr . In this phase of the project.
Boundary wall is proposed in the part of the project.
From the main entrance gate we have proposed metalled road work through out the entire project. whose wideness ranges between 18 mtr to 9 mtr / as approved by LDA.
we will provide footpath both side of the road with adequate width and beautiful pattern.
We will provide sufficient of pump houses as per the requirement of township which shall be connected to every plot through underground pipelines. Also individual can use their own RO as their need.
Sewerage system shall be provided. All Sewerage water shall be connect with the Nearest Municipal Line.
Drains Shall be connect with all units and all links drains shall be connect with a main drain, it shall be connect with Nearest Municipal Drain.
15177.26 Sqm Green Areas are proposed through out the whole project.
We will provide many types of trees in the entire project site.
We will design and implement system as per local electricity Board and will consider centralized Transformer, HT Panel, LT Panel, Feeder Pillar, and DG back for common service like External Lighting, Fountain, STP, Pump Room etc.
Not Proposed in this phase.
Sewerage system shall be provided. All Sewerage water shall be connect with the Nearest Municipal Line.
There are a proper garbage collection area provided for the Solid Waste Management.
We will suggest individuals to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.
We will use LED Lights fitting in external area as well as solar lights. In pump room Also the all the equipment shall have energy efficient motor. And we will suggest to individual also to use LED lights fitting.
For Fire Fitting facility Individual Owner can install their own system as per their need and local authorities requirements .
Sewerage , Drain water and water supply system shall be provided. We Have proposed common Pump Room, Roads and other area shall be connected to the Storm water drain Channel, Ground water and overflow shall be connect with Municipal Drain .
As the project is a plotted development, individual will take care of this at their own level.
NA
Total Area
33363.00 m²
359116.00 ft²