OngoingActive

SUPERTECH NORTHEYE (PHASE-II)

Gautam Buddha Nagar, Uttar Pradesh
20-07-2011Launch Date
OngoingType
UPRERAPRJ5539RERA ID
29-06-2021Completion Date

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)24685
Project NameSUPERTECH NORTHEYE (PHASE-II)
Registration Fee (in Rs.)128500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)120
DistrictGautam Buddha Nagar
Original Start Date20-07-2011
TehsilGautam Buddha Nagar
Proposed Start Date20-07-2011
Sanctioning Competent AuthorityNoida Authority
Project Cost (in Lacs)56444
Proposed Completion Date29-06-2021

Location

Latitude

28.572374

Longitude

77.387938

Bank Details

Account no.50200026639305
Name Of Account HolderSUPERTECH NORTHEYE (PHASE-II) RERA ACCOUNT
Bank NameHDFC BANK LTD
Branch AddressG2 & 3, Windsor Park, 5 Vaibhav Khand, Indrapuram, Ghaziabad 201014
Branch NameHDFC BANK LTD G2 & 3, Windsor Park, 5 Vaibhav Khand, Indrapuram, Ghaziabad 201014
IFSC CodeHDFC0000590

Development Works

Demarcation of Plots

As per approved building plans

Boundary Wall

As per approved building plans

Road Work

As per approved building plans

Footpaths

As per approved building plans

Water Supply Including Drinking Water Facilities

Water shall be provided by Authority & internal distribution shall be done by developer.

Sewer System

STP shall be provided for sewerage system.

Drain

Proper drainage system shall be provided

Parks

As per approved plans

Tree Planting

As per approved plans

Design For Electric Supply Including Street Lighting

As per approval from authority.

Community Buildings

As per approved building plans

Treatment and Disposal System of Sewage and Sullage water

STP shall be provided for sewerage system and treated water shall be used for flushing & irrigation system.

Solid Waste Management And Disposal System

Waste shall be segregated and will be treated by organic waste converter. Manure produced shall be used in green area and surplus effluent shall be disposed to authorized vendors.

Water Conservation System

Adequate nos of recharge pits shall be provided

Energy Management System Including Use of Renewable Energy

In common areas LED lights shall be provided with timer control.

Fire Protection And Fire Safety System

As per fire NOC

Social Infrastructure And Other Public Amenities Including Public Health Services

As per approved building plans

Emergency Evacuation Services

As per fire NOC

Other Miscellaneous Work

As per approved building plans

Documents

Lease Deed

No: 3988 | Date: 07-10-2010

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 06-07-2018

Commencement Certificate

Uploaded: 06-07-2018

Proforma of Application Form

Uploaded: 06-07-2018

Proforma of Allotment Letter

Uploaded: 06-07-2018

Proforma of Conveyance Deed

Uploaded: 06-07-2018

Waste Disposal Plan

Uploaded: 05-07-2018

Water Supply Plan

Uploaded: 05-07-2018

Electricity Supply Plan

Uploaded: 05-07-2018

Development Work Plan

Uploaded: 05-07-2018

Affidavit

Uploaded: 28-05-2019

CA CERTIFICATE

Uploaded: 28-05-2019

ARCHITECT CERTIFICATE

Uploaded: 06-07-2018

ENGINEERS CERTIFICATE

Uploaded: 06-07-2018

Authentic copy of Approval of Project

Uploaded: 27-12-2017

Authentic copy of Approval of Project

Uploaded: 27-12-2017

Development Work Plan

Uploaded: 27-12-2017

Authentic copy of Approval of Project

Uploaded: 27-12-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 27-12-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 27-12-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 27-12-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 27-12-2017

Authentic copy of Approval of Project

Uploaded: 27-12-2017

Authentic copy of Approval of Project

Uploaded: 27-12-2017

Registry Document In Case of Own Land

Uploaded: 27-12-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 27-12-2017

Permits

Orignal Permit No2014/III-227/757
Orignal Permit Date30-09-2014
Valid Upto30-09-2019
Revalidated Permit NoWILL BE APPLIED
Revalidated Permit Date30-09-2024
Revalidated Permit Valid Upto30-09-2024
Permit Extendable Upto30-09-2024
End Date30-12-2020
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)PP SAHA B E BILLIMORIA
Contractor AddressshakalpuraGhaziabad UP India 201010
Architect NameVISHAL MITTAL Space Designers International
Architect AddressB-34 Sector 67 Noida UP
Architect Licence NumberCA/98/23185
Structural Engineer NameR D CHOUDHARY VMS
Structural Engineer Address83/84, Sakhar Bhavan 230, Nariman Point MUMBAI-400021
Mobile number(Project Co-ordinator)8588033336

Land Details

AFS

Showing 4 blocks with 179 units

Property Summary

Total Area

74447.82

801348.89 ft²

Total Units

2241

5 different types

Blocks & Floors

4

54 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:33.22
Balconies:223
Parking ratio:0.00 per unit

Block EAST WING

23 units

Block WEST WING

23 units

Block CENTRAL

85 units

Block NORTH WING

48 units

Khasra Details

Total Area

209271.47

2252577.18 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoGH-01/A
Area(In Sq. Mt.)209271.47

Other Details

Contractor Name (if any)PP SAHA B E BILLIMORIA
Contractor AddressshakalpuraGhaziabad UP India 201010
Architect NameVISHAL MITTAL Space Designers International
Architect AddressB-34 Sector 67 Noida UP
Architect Licence NumberCA/98/23185
Structural Engineer NameR D CHOUDHARY VMS
Structural Engineer Address83/84, Sakhar Bhavan 230, Nariman Point MUMBAI-400021
Mobile number(Project Co-ordinator)8588033336