OngoingActive

SUPERTECH ECO VILLAGE-III (PHASE-I)

Gautam Buddha Nagar, Uttar Pradesh
15-10-2011Launch Date
OngoingType
UPRERAPRJ604RERA ID
31-03-2019Completion Date

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)38150
Project NameSUPERTECH ECO VILLAGE-III (PHASE-I)
Registration Fee (in Rs.)196000
AddressRoza Yakubpur
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)90
DistrictGautam Buddha Nagar
Original Start Date15-10-2010
TehsilGautam Buddha Nagar
Proposed Start Date15-10-2011
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)58103
Proposed Completion Date31-03-2019

Location

Latitude

28.607730

Longitude

77.452630

Bank Details

Account no.60216754286
Name Of Account HolderSUPERTECH LIMITED
Bank NameBank of Maharashtra
Branch AddressSector-62, Noida
Branch NameSector-62, Noida
IFSC CodeMAHB0001340

Development Works

Demarcation of Plots

As per approved building plans

Boundary Wall

As per approved building plans

Road Work

As per approved building plans

Footpaths

As per approved building plans

Water Supply Including Drinking Water Facilities

Water shall be provided by Authority & internal distribution shall be done by developer.

Sewer System

STP shall be provided for sewerage system.

Drain

Proper drainage system shall be provided

Parks

As per approved plans

Tree Planting

As per approved plans

Design For Electric Supply Including Street Lighting

As per approval from authority.

Community Buildings

As per approved building plans

Treatment and Disposal System of Sewage and Sullage water

STP shall be provided for sewerage system and treated water shall be used for flushing & irrigation system.

Solid Waste Management And Disposal System

Waste shall be segregated and will be treated by organic waste converter. Manure produced shall be used in green area and surplus effluent shall be disposed to authorized vendors.

Water Conservation System

Adequate nos of recharge pits shall be provided

Energy Management System Including Use of Renewable Energy

In common areas LED lights shall be provided with timer control.

Fire Protection And Fire Safety System

As per fire NOC

Social Infrastructure And Other Public Amenities Including Public Health Services

As per approved building plans

Emergency Evacuation Services

As per fire NOC

Other Miscellaneous Work

As per approved building plans

Documents

Lease Deed

No: 22206 | Date: 13-10-2010

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 06-07-2018

Commencement Certificate

Uploaded: 06-07-2018

Proforma of Application Form

Uploaded: 06-07-2018

Proforma of Allotment Letter

Uploaded: 06-07-2018

Proforma of Conveyance Deed

Uploaded: 06-07-2018

Waste Disposal Plan

Uploaded: 06-07-2018

Water Supply Plan

Uploaded: 06-07-2018

Electricity Supply Plan

Uploaded: 06-07-2018

Development Work Plan

Uploaded: 06-07-2018

Affidavit

Uploaded: 31-07-2018

CA CERTIFICATE

Uploaded: 31-07-2018

ARCHITECT CERTIFICATE

Uploaded: 06-07-2018

ENGINEERS CERTIFICATE

Uploaded: 06-07-2018

Development Work Plan

Uploaded: 03-04-2018

Authentic copy of Approval of Project

Uploaded: 03-04-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 03-04-2018

Authentic copy of Approval of Project

Uploaded: 03-04-2018

Authentic copy of Approval of Project

Uploaded: 03-04-2018

Authentic copy of Approval of Project

Uploaded: 03-04-2018

Authentic copy of Approval of Project

Uploaded: 03-04-2018

Authentic copy of Approval of Project

Uploaded: 03-04-2018

Authentic copy of Approval of Project

Uploaded: 03-04-2018

Authentic copy of Approval of Project

Uploaded: 03-04-2018

Authentic copy of Approval of Project

Uploaded: 03-04-2018

Authentic copy of Approval of Project

Uploaded: 03-04-2018

Authentic copy of Approval of Project

Uploaded: 03-04-2018

Authentic copy of Approval of Project

Uploaded: 03-04-2018

Authentic copy of Approval of Project

Uploaded: 03-04-2018

Authentic copy of Approval of Project

Uploaded: 03-04-2018

Permits

Orignal Permit NoBP2471/GN/CI2786
Orignal Permit Date09-04-2012
Valid Upto08-04-2017
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto08-04-2022
End Date31-03-2019
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Not specified
Contractor AddressNot specified
Architect NameMODARCH
Architect AddressB-99, Sector-63,Noida
Architect Licence NumberCA/98/22706
Structural Engineer NameRAJEEV DUA
Structural Engineer AddressKarampura, Moti Nagar, Delhi
Mobile number(Project Co-ordinator)9310012345

Land Details

AFS

Showing 10 blocks with 270 units

Property Summary

Total Area

97692.14

1051548.43 ft²

Total Units

1352

4 different types

Blocks & Floors

10

27 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:72.26
Balconies:723
Parking ratio:0.00 per unit

Block D16

28 units

Block D4

29 units

Block D7

28 units

Block D14

28 units

Block D12A

28 units

Block B2

24 units

Block B24

25 units

Block A5

25 units

Block A10

26 units

Block A9

29 units

Khasra Details

Total Area

85202.50

917111.19 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoGH-01 Sector 16B
Area(In Sq. Mt.)85202.5

Other Details

Contractor Name (if any)Not specified
Contractor AddressNot specified
Architect NameMODARCH
Architect AddressB-99, Sector-63,Noida
Architect Licence NumberCA/98/22706
Structural Engineer NameRAJEEV DUA
Structural Engineer AddressKarampura, Moti Nagar, Delhi
Mobile number(Project Co-ordinator)9310012345