26.481748
80.334111
The demarcation of plot has already been done and the boundary work has started to demarcate the campus
Complete boundary from all sides and gated residence campus.
6 .0 M wide roads within the campus. Road work to start in the eventual phase of the project
N/a, but will be planned wherever needful.
water supply will be provided through ground water and water tanks. The complete work shall be over by the end of the project.
Sewer system will be installed and functional by the end of the project.
will be installed wherever needed.
500 M approx Lawn Area within the campus.
Tree planting will be done on the landscaping of the project
Complete Lighting Solutions in all the common areas
Not present in the campus.
Will be installed
Shall be present.
Rain water harvesting to be adopted in the project and other if possible.
Solar power lighting solutions in the common areas and wherever possible.
complete fire back up and safety solutions will be present in the building.
Common washrooms and more in provision
Fire escape planning to be provided according to norms
All work to be planned according to the need and demand of the allotee
Showing 1 blocks with 15 units
Total Area
5171.44 m²
55664.86 ft²
Total Units
60
2 different types
Blocks & Floors
1
7 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
3983.62 m²
42879.29 ft²