NewActive

Sri Krishna Vilas

Varanasi, Uttar Pradesh
30-06-2026Completion
NewType
VaranasiDistrict
8001 LCost

Basic Details

Project Type:New
Project Category:Residential
Total area in round figure (Sq.mt.):11341
Project Name:Sri Krishna Vilas
Registration Fee (in Rs.):62000
Address:Not specified
Village/Locality/Sector etc.:Not specified
State:Uttar Pradesh
Project Duration (In month):78
District:Varanasi
Original Start Date:-
Tehsil:Varanasi
Proposed Start Date:06-01-2020
Sanctioning Competent Authority:Varanasi Development Authority
Project Cost (in Lacs):8001
Proposed Completion Date:30-06-2026

Location

Latitude

25.314222

Longitude

82.954444

Bank Details

Account no.:50200045981777
Name Of Account Holder:Shreemaa Infrarealty Pvt. Ltd.
Bank Name:HDFC
Branch Address:HDFC Bank Lanka Branch Varanasi
Branch Name:Lanka Varanasi
IFSC Code:HDFC0001465

Development Works

Demarcation of Plots

This is single plot roughly octagonal shape , having total 1 no. of entry gate and 1no. of exit gate from the 18m wide front road, Site is surronded by other plots on two side

Boundary Wall

1.8 - 2.1m high and 200 mm thick Boundary wall designed . Brick Work of 9inches and rcc work in column and beam may be used as per design. MS Broad entrance and exit gates are developed with boundary.

Road Work

Concerete Road with bituminous Cover/ High quality concrete pavers will be used as per deisgn suggested by the Architect for internal road.

Footpaths

All internal roads will have narrow footpath in 40- 60 mm thick concrete pavers or equivalent finishes

Water Supply Including Drinking Water Facilities

UP JAl Board will provide the water supply to the Plot and Individual, Ground water may also be used, Also end user shall be used their individual RO system as per their requirement. Overhead tanks shall be provided on building terrace for distribution through gravity.

Sewer System

Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system.

Drain

Storm water system shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain line.

Parks

There is one main park on thesouth east part or plot with pool area, play area for childrens and different recretional activities. Facility of Gym/ Spa/ Sauna on chargeable basis will be provided on terrace as per Architect designs. Central park between Block A and Block B.

Tree Planting

"There are 5 type of trees povided in site which are kachnar, gulmauhar, amaltas, kusum and neem."

Design For Electric Supply Including Street Lighting

We have designed the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting,STP,Pump room etc.

Community Buildings

Fully centralised AC Club House is provided on the lower ground floor, and some temporary kiosks on the central atrium with sitting area of each building.

Treatment and Disposal System of Sewage and Sullage water

Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system.

Solid Waste Management And Disposal System

There are a proper garbage collection area provided for the solid waste management.

Water Conservation System

A well designed rain water harvesting system shall be provided for the whole building complex to conserve water.

Energy Management System Including Use of Renewable Energy

We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. 25 % of Terrace is covered with Solar Votaic Panels to provide Renewable source of energy for common areas in building complex.

Fire Protection And Fire Safety System

Since the building is less than 50m in height all the fire norms shall be followed as NBC and approval of fire department

Social Infrastructure And Other Public Amenities Including Public Health Services

Sewerage ,Storm water and water supply system shall be Provided. We have Proposed common Pump Room with Primary filteration, Transfer pumps to fill the domestic overhead tank. Water for domestic use & Flushing go down through gravity from domestic as well as flushing tanks. All Sewgage shall be go to the STP for recycling the water. Storm water for Roof,Roads and other area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain.

Emergency Evacuation Services

Fire Staricase is provided in the central atrium of each building, with fire resistant doors, basements have 7(Seven) accesses to exit in case of emergency

Other Miscellaneous Work

Luxurious entrance lobby with water cascade in each block, convenience store at the entrance gate for day to day small purchasings, lush green shurbs at every vacant space on ground.

New Documents

Extract of Khatauni

No: 1421-1428 | Date: -

Registry Document

No: 1126 | Date: 18-02-2019

Registry Document

No: 3370 | Date: 04-06-2018

Registry Document

No: 3371 | Date: 04-06-2018

Uploaded Documents

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 14-11-2019

Commencement Certificate

Uploaded: 14-11-2019

Other Plan(If Any)

Uploaded: 24-11-2019

Proforma of Application Form

Uploaded: 14-11-2019

Proforma of Allotment Letter

Uploaded: 14-11-2019

Proforma of Conveyance Deed

Uploaded: 14-11-2019

Waste Disposal Plan

Uploaded: 24-11-2019

Water Supply Plan

Uploaded: 24-11-2019

Electricity Supply Plan

Uploaded: 07-12-2019

Development Work Plan

Uploaded: 24-11-2019

Affidavit

Uploaded: 14-11-2019

CA CERTIFICATE

Uploaded: 14-11-2019

ARCHITECT CERTIFICATE

Uploaded: 14-11-2019

ENGINEERS CERTIFICATE

Uploaded: 14-11-2019

Permits

Orignal Permit No60
Orignal Permit Date22-10-2019
Valid Upto21-10-2024
Permit Extendable Upto21-10-2027
End Date31-12-2025

Project Team

Contractor Name (if any)New Morden Buildwell Pvt Ltd
Contractor Address511, Ambadeep Building KG Marg New Delhi
Architect NameAr. Amit Kr. Gupta
Architect AddressD59/235, 9C, Nirala nagar, Shivpurwa, Varanasi
Architect Licence NumberCA/2012/56379
Structural Engineer NameEr. B.M.Thakur
Structural Engineer AddressA-6, Sector-58, Noida
Mobile number(Project Co-ordinator)7881188889

Project Land Details

AFS

Showing 3 blocks with 303 units

Property Summary

Total Area

22709.81

244446.12 ft²

Total Units

349

3 different types

Blocks & Floors

3

17 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:65.07
Balconies:657
Parking ratio:0.00 per unit

Block EWS/LIG

8 units

Block Block A

151 units

Block Block B

144 units

Khasra Details

Total Area

12373.00

133181.73 ft²

3 plots
Khasra
Type:Khasra
Khasra/Plot No:529K
Area(In Sq. Mt.):5470
Khasra
Type:Khasra
Khasra/Plot No:529 Kha
Area(In Sq. Mt.):5323
Khasra
Type:Khasra
Khasra/Plot No:515
Area(In Sq. Mt.):1580

Other Details

Contractor Name (if any):New Morden Buildwell Pvt Ltd
Contractor Address:511, Ambadeep Building KG Marg New Delhi
Architect Name:Ar. Amit Kr. Gupta
Architect Address:D59/235, 9C, Nirala nagar, Shivpurwa, Varanasi
Architect Licence Number:CA/2012/56379
Structural Engineer Name:Er. B.M.Thakur
Structural Engineer Address:A-6, Sector-58, Noida
Mobile number(Project Co-ordinator):7881188889