Basic Details

Project Type:New
Project Category:Residential
Total area in round figure (Sq.mt.):5000
Project Name:SPORTSHOME PHASE II
Registration Fee (in Rs.):30000
Address:Not specified
Village/Locality/Sector etc.:Not specified
State:Uttar Pradesh
Project Duration (In month):65
District:Gautam Buddha Nagar
Original Start Date:-
Tehsil:Gautam Buddha Nagar
Proposed Start Date:15-02-2019
Sanctioning Competent Authority:Greater Noida Authority
Project Cost (in Lacs):7460000000
Proposed Completion Date:30-06-2024

Location

Latitude

28.583618

Longitude

28.583618

Bank Details

Account Details
Name of the Account:DEVSAI CONSTRUCTION PVT LTD
Account Number:18522000000091
Bank Name:DCB Bank Ltd.
Branch Name:Laxmi Nagar
Branch Address:First Floor, U-158/1A, (Old Number U-158), Plot No. 1, Khasra No. 142, Shakarpur, New Delhi, PIN-110092
Branch State:Delhi
Branch District:East Delhi
IFSC Code:DCBL0000185
Transaction Account Details
Name of the Account:DEVSAI CONSTRUCTION PVT LTD
Account Number:18522700000170
Bank Name:DCB Bank Ltd.
Branch Name:Laxmi Nagar
Branch Address:First Floor, U-158/1A, (Old Number U-158), Plot No. 1, Khasra No. 142, Shakarpur, New Delhi, PIN-110092
Branch State:Delhi
Branch District:East Delhi
IFSC Code:DCBL0000185

Development Works

Demarcation of Plots

as per plan

Boundary Wall

RCC walls with MS railings

Road Work

Trimix / Pavers / Chequard Tiles

Footpaths

Pavers

Water Supply Including Drinking Water Facilities

the water supply / sewer / drain will be provided by GNIDA

Sewer System

the water supply / sewer / drain will be provided by GNIDA

Drain

the water supply / sewer / drain will be provided by GNIDA

Parks

as per sanction plan

Tree Planting

the water supply / sewer / drain will be provided by GNIDA

Design For Electric Supply Including Street Lighting

the electricity supply will be provided by NPCL

Community Buildings

as per sanctioned plans

Treatment and Disposal System of Sewage and Sullage water

STP 150 KLDS 2 nos and discharges from STP will be used

Solid Waste Management And Disposal System

oraganic waste compost plant will be installed

Water Conservation System

as per sanctioned plan and guideline of GREEN buildings

Energy Management System Including Use of Renewable Energy

online solar system of 20 KW capacity will be installed

Fire Protection And Fire Safety System

as per Fire NOC

Social Infrastructure And Other Public Amenities Including Public Health Services

as per sanctioned plan

Emergency Evacuation Services

as per sanctioned plan

Other Miscellaneous Work

as per sanctioned plan

New Documents

Lease Deed

No: 15049 | Date: 06-02-2014

Lease Deed

No: Reschedulement Letter from Greater NOIDA Industrial Development Authority (GNIDA) | Date: 03-04-2019

Uploaded Documents

Commencement Certificate

Other Plan(If Any)

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Waste Disposal Plan

Water Supply Plan

Electricity Supply Plan

Development Work Plan

Affidavit

Other

Details of Encumbrances

Uploaded: 12-06-2019

Commencement Certificate

Uploaded: 19-03-2019

Other Plan(If Any)

Uploaded: 08-04-2019

Proforma of Application Form

Uploaded: 19-01-2019

Proforma of Allotment Letter

Uploaded: 19-03-2019

Proforma of Conveyance Deed

Uploaded: 23-03-2019

Waste Disposal Plan

Uploaded: 19-03-2019

Water Supply Plan

Uploaded: 20-03-2019

Electricity Supply Plan

Uploaded: 20-03-2019

Development Work Plan

Uploaded: 20-03-2019

Affidavit

Uploaded: 23-03-2019

CA CERTIFICATE

Uploaded: 12-03-2022

ARCHITECT CERTIFICATE

Uploaded: 12-03-2022

ENGINEERS CERTIFICATE

Uploaded: 12-03-2022

Permits

Orignal Permit NoBP-3477/FB-3696
Orignal Permit Date30-06-2015
Valid Upto29-06-2020
Permit Extendable Upto29-06-2025
End Date31-12-2023

Project Team

Contractor Name (if any)SUKRITI REALCON PRIVATE LIMITED
Contractor AddressH. NO.74, 3RD FLOOR, BANK ENCLAVE, LAXMI NAGAR, DELHI-110092
Architect NameANDLEYS ASSOCIATES PVT LTD
Architect Address39, HOUSING SOCIETY, SOUTH EXTENSION PART-I, NEW DELHI-110049
Architect Licence NumberCA/99/24866
Structural Engineer NameMr. Paresh
Structural Engineer Address39, HOUSING SOCIETY, SOUTH EXTENSION PART-I, NEW DELHI-110049
Mobile number(Project Co-ordinator)9599782289

Project Land Details

AFS

Showing 2 blocks with 93 units

Property Summary

Total Area

33257.71

357982.66 ft²

Total Units

183

4 different types

Blocks & Floors

2

26 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:181.74
Balconies:370
Parking ratio:0.00 per unit

Block ACE

47 units

Block Austin

46 units

Khasra Details

Total Area

10000.00

107639.00 ft²

1 plot
Plot
Type:Plot
Khasra/Plot No:02
Area(In Sq. Mt.):10000

Other Details

Contractor Name (if any):SUKRITI REALCON PRIVATE LIMITED
Contractor Address:H. NO.74, 3RD FLOOR, BANK ENCLAVE, LAXMI NAGAR, DELHI-110092
Architect Name:ANDLEYS ASSOCIATES PVT LTD
Architect Address:39, HOUSING SOCIETY, SOUTH EXTENSION PART-I, NEW DELHI-110049
Architect Licence Number:CA/99/24866
Structural Engineer Name:Mr. Paresh
Structural Engineer Address:39, HOUSING SOCIETY, SOUTH EXTENSION PART-I, NEW DELHI-110049
Mobile number(Project Co-ordinator):9599782289