OngoingActive

SPORTS VILLAGE (PHASE-I)

Gautam Buddha Nagar, Uttar Pradesh
22-06-2016Launch Date
OngoingType
UPRERAPRJ408RERA ID
30-06-2021Completion Date

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)12500
Project NameSPORTS VILLAGE (PHASE-I)
Registration Fee (in Rs.)67500
AddressKhodna Khura
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)61
DistrictGautam Buddha Nagar
Original Start Date22-06-2016
TehsilGautam Buddha Nagar
Proposed Start Date22-06-2016
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)63433
Proposed Completion Date30-06-2021

Location

Latitude

28.541599

Longitude

77.493916

Bank Details

Account no.117001601200031
Name Of Account HolderSupertech Limited
Bank NameCorporation Bank
Branch AddressSector-62, Noida
Branch NameSector-62, Noida
IFSC CodeCORP0001170

Development Works

Demarcation of Plots

As per approved building plans

Boundary Wall

As per approved building plans

Road Work

As per approved building plans

Footpaths

As per approved building plans

Water Supply Including Drinking Water Facilities

Water shall be provided by Authority & internal distribution shall be done by developer.

Sewer System

STP shall be provided for sewerage system.

Drain

Proper drainage system shall be provided

Parks

As per approved plans

Tree Planting

As per approved plans

Design For Electric Supply Including Street Lighting

As per approval from authority.

Community Buildings

As per approved building plans

Treatment and Disposal System of Sewage and Sullage water

STP shall be provided for sewerage system and treated water shall be used for flushing & irrigation system.

Solid Waste Management And Disposal System

Waste shall be segregated and will be treated by organic waste converter. Manure produced shall be used in green area and surplus effluent shall be disposed to authorized vendors.

Water Conservation System

Adequate nos of recharge pits shall be provided

Energy Management System Including Use of Renewable Energy

In common areas LED lights shall be provided with timer control.

Fire Protection And Fire Safety System

As per fire NOC

Social Infrastructure And Other Public Amenities Including Public Health Services

As per approved building plans

Emergency Evacuation Services

As per fire NOC

Other Miscellaneous Work

As per approved building plans

Documents

Lease Deed

No: 16940 | Date: 21-06-2016

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 06-07-2018

Commencement Certificate

Uploaded: 06-07-2018

Proforma of Application Form

Uploaded: 06-07-2018

Proforma of Allotment Letter

Uploaded: 06-07-2018

Proforma of Conveyance Deed

Uploaded: 06-07-2018

Waste Disposal Plan

Uploaded: 06-07-2018

Water Supply Plan

Uploaded: 06-07-2018

Electricity Supply Plan

Uploaded: 06-07-2018

Development Work Plan

Uploaded: 16-07-2018

Affidavit

Uploaded: 28-05-2019

CA CERTIFICATE

Uploaded: 28-05-2019

ARCHITECT CERTIFICATE

Uploaded: 06-07-2018

ENGINEERS CERTIFICATE

Uploaded: 06-07-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 23-03-2018

Authentic copy of Approval of Project

Uploaded: 23-03-2018

Authentic copy of Approval of Project

Uploaded: 23-03-2018

Authentic copy of Approval of Project

Uploaded: 23-03-2018

Registry Document In Case of Own Land

Uploaded: 02-04-2018

Authentic copy of Approval of Project

Uploaded: 02-04-2018

Authentic copy of Approval of Project

Uploaded: 02-04-2018

Authentic copy of Approval of Project

Uploaded: 02-04-2018

Development Work Plan

Uploaded: 02-04-2018

Authentic copy of Approval of Project

Uploaded: 02-04-2018

Authentic copy of Approval of Project

Uploaded: 02-04-2018

Permits

Orignal Permit No3833/7167
Orignal Permit Date30-09-2016
Valid Upto30-09-2021
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto30-09-2021
End Date31-12-2020
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)PERFECT CITY VAKIL
Contractor Address132 village piplaihada gzb UP 201012
Architect NameNIRBHAY SHUKLA Comprehensive Architectural Services
Architect AddressD-150, Sector-40, Noida
Architect Licence Number29612 / 2002
Structural Engineer NameR D CHOUDHARY VMS
Structural Engineer Address83/84, Sakhar Bhawan, 230 Nariman Point, Mumbai-400021
Mobile number(Project Co-ordinator)8588033336

Land Details

AFS

Showing 4 blocks with 161 units

Property Summary

Total Area

51368.96

552930.35 ft²

Total Units

896

3 different types

Blocks & Floors

4

28 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:57.33
Balconies:645
Parking ratio:0.00 per unit

Block A1

52 units

Block A2

53 units

Block B1

28 units

Block B3

28 units

Khasra Details

Total Area

251371.32

2705735.75 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoSC 02D
Area(In Sq. Mt.)251371.32

Other Details

Contractor Name (if any)PERFECT CITY VAKIL
Contractor Address132 village piplaihada gzb UP 201012
Architect NameNIRBHAY SHUKLA Comprehensive Architectural Services
Architect AddressD-150, Sector-40, Noida
Architect Licence Number29612 / 2002
Structural Engineer NameR D CHOUDHARY VMS
Structural Engineer Address83/84, Sakhar Bhawan, 230 Nariman Point, Mumbai-400021
Mobile number(Project Co-ordinator)8588033336