25.404936
81.750497
YES - Demarcated on Site of Project
YES - RCC Retaining wall , AAC BLOCK
YES - 6 Mtr Wide VDF Road around the tower
YES - Soiling/ Paver block footpath work
YES - under ground tank and pump house domestic water tank 50 KL
YES - Sewer System having capacity 100 KLD Plant
YES - Laying of DWC 300 mm dia pipe with circular chamber and rainwater harvesting
YES - Park Covered with grass with kids play Asset
YES - Tree plantation is done around primes adjoining of boundary wall
Electric supply shown in services coordination plan through 11KV, 3way RMU (Compact type) and 11KV /415KV corporation, solar Pannel provided on the top of the building.
NA
YES - Primary ,Secondary and Turtle treatment ,Sullage water use in landscape
YES - use in manure and water recycle of STP system
YES - Water Conservation system through rainwater harvesting
YES - Through solar system
YES - through water sprinkler and hydrant system
YES - Basketball Court, Badminton Court, Cricket practice pitch, Skating Court etc.
YES - Fire fighting staircase and alarm system
YES -The expansion of other residential unit, school, Children playground, fountain, Commercial complex with three tier security
Showing 1 blocks with 43 units
Total Area
8514.40 m²
91648.15 ft²
Total Units
100
3 different types
Blocks & Floors
1
13 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
1048.00 m²
11280.57 ft²