Project Area
Launch Date
Completion Date
RERA ID
26.92
80.97
This project is Multi Storied Project.
80% work has been completed.
10% work has been completed.
Work has not been Started.
20% work has been completed.
25% work has been completed.
Work has not been started.
Work has not been started.
Not Started
Design is finalized. 10% works has been completed.
10% of the work has been completed.
Disposal through Nagar Nigam Sewer line.
Disposal through Nagar Nigam.
Provision of Rain Water Harvesting is porposed.
Solar Water heating system.
Fire Fighting system installed in the project.
No provision in the project.
Provided in the project.
NIL
Showing 5 blocks with 252 units
Total Carpet Area
38689.42 m²
416449.05 ft²
Total Units
490
4 different types
Blocks & Floors
5
21 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
14554.50 m²
156663.18 ft²