25.225740
82.534410
Yes, Demarcation of the Plots is Completed with Approved Surveyors along with Total Station etc.
Yes, Boundary Wall with RCC Footings with RCC Column in between Column 230 mm Brickwork and Plaster both the side with Boundary Wall Lights etc.
Yes, Compacted Earth with Consolidated Subgrade along laying of Water Bound Macadam Two Layers with 115 mm Thick Layer along with RCC Flooring 124(Trimix) Along with Minimum Reinforcement with Construction joints filled with polysulphide Thioflex 600 etc.
Yes, Footpath will be constructed using interlocking/ Paver as per Sanctioned Plan.
Yes, As per Prescribed norms WTH Adequate Provision for treatment storage distribution network. The Norm laid down by GOI for providing potable water supply shall be ensured.
Yes, Proper Sewerage System will be constructed using RCC/ UPVC Pipes as per Drawings and will be Treated with STP. STP Treated Water will be used as mentioned above and residual will be disposed off in Government System.
Yes, Draining System will be constructed using RCC/ UPVC Pipes as per drawings. Drainage System Comprise of Internal Drainage System ultimate Disposal.
Yes, Beautiful Landscape with Civil Work. Parks with Children Playing Equipment using Malaysian TIUFC with Sitting Benches etc.
Yes, Planting along with the Boundary wall and the Internal Roads where ever possible to make the Environment Green and Shady.
Yes, Transformers with RMU along with Enerymeters for each Flat, and distribution Board along with Backup power supply using armed cable with necessary Diameters etc. Street Light Single Pole with double light where ever necessary using Led Lights to save the Power Energy along with Seres Connections with main Control.
Yes, Club with All Facilities GYM with all Equipment Indoor Game Rooms etc.
Yes, STP to Treated Sewage Water and after treated to be used for Horticulture and the Flushing System and Solid Waste to be sorted and disposal according to the conditions.
Yes, STP and Garbage Storage yards and Garbage Chuit ect.
Yes, Adequate Number of RWH Pits have been provided.
Yes, Solar Penal and LED Lights shall Extensivily used.
Yes, Public Addressing System, Sprinklers in parking and common areas, Fire Hydrant Externally each typical Floor hosereel cabin with Hydrant along with Addressable smoke detector, duly signage each floor and Fire Escaping Staircases , Fire Main Switch in each Lift along with Fire Brigade in the gate with Fire Man Switch etc.
Yes, Social Gathering places like Club , Park Ampetheaters , Children Care, Small First Aid Rooms etc. in community are being provided.
Fire Escape Staircases Fire Alarms public Addressing Systems.
Proper Security System including Security Guard, CCTV, Cameras and controlled access will be made available.
Showing 2 blocks with 32 units
Total Area
13301.76 m²
143178.81 ft²
Total Units
192
2 different types
Blocks & Floors
2
16 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
5490.00 m²
59093.81 ft²