NewActive

SHREE SAI CITY

Varanasi, Uttar Pradesh
01-01-2021
Launch Date
New
Type
31-08-2025
Completion Date

Overview

Project Area

2.1263 acres

Launch Date

01-01-2021

Completion Date

31-08-2025

RERA ID

UPRERAPRJ923469

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)8605
Project NameSHREE SAI CITY
Registration Fee (in Rs.)48500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)56
DistrictVaranasi
Original Start Date-
TehsilPindra **
Proposed Start Date01-01-2021
Sanctioning Competent AuthorityVaranasi Development Authority
Project Cost (in Lacs)7787
Proposed Completion Date31-08-2025

Location

Latitude

25.381097536223212

Longitude

82.89612895434682

Bank Details

Account Details
Name of the AccountShree Sai Baba Infraproject Pvt. Ltd. - Relators Current Account One
Account Number00000040022660838
Bank NameState Bank of India
Branch NameSPL Commercial Branch, Varanasi
Branch AddressState Bank of India, Specialized Commercial Branch, Near Kachahari SBI Main Branch Campus , Varanasi, Uttar Pradesh, PIN-221002
Branch StateUttar Pradesh
Branch DistrictVaranasi
IFSC CodeSBIN0009252
Transaction Account Details
Name of the AccountShree Sai Baba Infraproject Pvt. Ltd. - Relators Current Account Three
Account Number0000004022703884
Bank NameState Bank of India
Branch NameSPL Commercial Branch, Varanasi
Branch AddressState Bank of India, Specialized Commercial Branch, Near Kachahari, SBI Main Branch Campus, Varanasi, Uttar Pradesh, PIN-221002
Branch StateUttar Pradesh
Branch DistrictVaranasi
IFSC CodeSBIN0009252

Development Works

Demarcation of Plots

DEMARCATION OF THE PLOTS IS COMPLETED WITH APPROVED SURVEYORS ALONG WITH TOTAL STATION ETC.,

Boundary Wall

BOUNDARY WALL WITH RCC FOOTINGS WITH RCC COLUMN IN BETWEEN COLUMN 230MM BRICKWORK AND PLASTER BOTH THE SIDE WITH BOUNDARY WALL LIGHTS ETC.,

Road Work

COMPACTED EARTH WITH CONSOLIDATED SUBGRADE ALONG LAYING OF WATER BOUND MACADAM TWO LAYERS WITH 115 MM THICK LAYER ALONG WITH RCC FLOORING 124 (TRIMIX) ALONG WITH MINIMUM RE-INFORCEMENT WITH CONSTRUCTION JOINTS FILLED WITH POLYSULPHIDE THIOFLEX 600 ETC.,

Footpaths

PRECAST CONCRETE KERBS,EDGING ECT. WITH CEMENT MORTER 1/3 ALONG WITH CONCRETE PAVERS FOR FOOTPATH

Water Supply Including Drinking Water Facilities

AS PER PRESCRIBED NORMS WTH ADEQUATE PROVISION FOR TREATMENT STORAGE DISTRIBUTION NETWORK . THE NORM LAID DOWN BY GOI FOR PROVIDING POTABLE WATER SUPPLY SHALL BE ENSURED.

Sewer System

THE PROPOSED SEWER SYSTEM SHALL BE DESIGNED FOR MAXIMUM DISCHARGE TO CATER THE REQUIREMENT ON THE ULTIMATE DEVELOPMENT OF PROJECT . SEWAGE TREATMENT PLANT SHALL BE PROPOSED FOR THE TREATMENT OF SEWAGE.

Drain

DRAINAGE SYSTEM COMPRISE OF INTERNAL DRAINAGE SYSTEM ULTIMATE DISPOSAL

Parks

PARKS WITH CHILDERN PLAYING EQUIPMENTS USING MALAYSIAN TIUFC WITH SITTING BENCHES ETC.,

Tree Planting

PLANTING ALONG WITH THE BOUNDARY WALL AND THE INTERNAL ROADS WHERE EVER POSSIBLE TO MAKE THE ENVOIRENMENT GREEN AND SHADY

Design For Electric Supply Including Street Lighting

TRANSFORMERS WITH RMU ALONWITH ENERYMETERS FOR EACH FLAT , AND DISTRIBUTION BOARD ALONGWITH BACKUP POWER SUPPLY USING ARMED CABLE WITH NECESSARY DIAMETERS ETC., STREET LIGHT SINGLE POLE WITH DOUBLE LIGHT WHERE EVER NECESSARY AND SINGLE POLE WITH SINGLE LIGHT WHEREEVER NECESSARY USING LED LIGHTS TO SAVE THE POWER ENERGY ALONG WITH SERES CONNECTIONS WITH MAIN CONTROL.

Community Buildings

CLUB WITH ALL FACILITIES GYM WITH ALL EQUIPMENTS INDOOR GAME ROOMS ETC.,

Treatment and Disposal System of Sewage and Sullage water

STP TO TREATED SEWAGE WATER AND AFTER TREATED TO BE USED FOR HORTICULTURE AND THE FLUSHING SYSTEM AND SOLID WASTE TO BE SORTED AND DISPOSAL ACCORDING TO THE CONDITIONS

Solid Waste Management And Disposal System

STP AND GARBAGE STORAGE YARDS AND GARBEGE CHUIT ECT.

Water Conservation System

ADEQUATE NUMBER OF RWH PITS HAVE BEEN PROVIDED

Energy Management System Including Use of Renewable Energy

SOLAR PENAL AND LED LIGHTS SHALL EXTENSIVILY USED

Fire Protection And Fire Safety System

PUBLIC ADDRESSING SYSTEM, SPRINKLERS IN PARKING AND THE COMMON AREAS, FIRE HYDRANT EXTERNALLY EACH TYPICAL FLOOR HOSEREEL CABIN WITH HYDRANT ALONGWITH ADDRESSABLE SMOKE DETECTORS , DULY SIGNAGE EACH FLOOR AND FIRE ESCAPING STAIRCASES , FIRE MAIN SWITCH IN EACH LIFT ALONG WITH FIRE BRIGADE IN THE GATE WITH FIRE MAN SWITCH ETC.,

Social Infrastructure And Other Public Amenities Including Public Health Services

CLUB, PARKS AMPETHEATERES , CHILDREN CARE, SMALL FIRST AID ROOMS ECT.

Emergency Evacuation Services

FIRE ESCAPE STAIRCASES FIRE ALARMS PUBLIC ADDRESSING SYSTEMS

Other Miscellaneous Work

GARDENING, LANDSCAPING , MAIN ROAD BUS SHELTERS , ATM , RIKSHA STANDS , KISOK

Documents

Registry Document

No: 3984 | Date: 27-07-2016

Extract of Khatauni

No: 1427-1432 | Date: -

Details of Encumbrances

Details of Encumbrances

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Waste Disposal Plan

Electricity Supply Plan

Electricity Supply Plan

Development Work Plan

CA CERTIFICATE

ARCHITECT CERTIFICATE

ENGINEERS CERTIFICATE

Details of Encumbrances

Uploaded: 13-03-2021

Commencement Certificate

Uploaded: 24-01-2021

Other Plan(If Any)

Uploaded: 09-02-2021

Proforma of Application Form

Uploaded: 24-01-2021

Proforma of Allotment Letter

Uploaded: 24-01-2021

Proforma of Conveyance Deed

Uploaded: 24-01-2021

Waste Disposal Plan

Uploaded: 16-02-2021

Water Supply Plan

Uploaded: 08-03-2021

Electricity Supply Plan

Uploaded: 08-03-2021

Development Work Plan

Uploaded: 16-02-2021

Affidavit

Uploaded: 24-01-2021

CA CERTIFICATE

Uploaded: 13-03-2021

ARCHITECT CERTIFICATE

Uploaded: 08-03-2021

ENGINEERS CERTIFICATE

Uploaded: 08-03-2021

Permits

Orignal Permit No284
Orignal Permit Date02-03-2019
Valid Upto01-03-2024
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto01-03-2026
End Date01-03-2024
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit No284
Orignal Permit Date02-03-2019
Valid Upto01-03-2024
Revalidated Permit No284
Revalidated Permit Date02-03-2019
Revalidated Permit Valid Upto01-03-2027
Permit Extendable Upto01-03-2027
End Date01-03-2024
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)SHREE SAIBABA INFRAPROJECTS PVT LTD
Contractor AddressHIG-5 PHASE-2 ASHOK VIHAR COLONY PAHARIYA VARANASI
Architect NameNISHANT SHEKHAR
Architect AddressM/S DES ARC UGSR-1A ANSAL PLAZA SECTOR-1 VAISHALI GHAZIABAD
Architect Licence NumberCA/2006/39203
Structural Engineer NameDIWAKAR BHAGAT
Structural Engineer AddressSUDHA TECHNICAL CONSULTANTS(P) LTD. F-702 UPPER GROUND FLOOR LADO SARAI NEW DELHI
Mobile number(Project Co-ordinator)9628417784

Land Details

AFS

Showing 2 blocks with 32 units

Property Summary

Total Carpet Area

17802.56

191624.98 ft²

Total Units

272

2 different types

Blocks & Floors

2

16 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:65.45
Balconies:96
Parking ratio:0.00 per unit

Block A

16 units

Block B

16 units

Khasra Details

Total Area

17910.00

192781.45 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No79,80
Area(In Sq. Mt.)17910

Other Details

Contractor Name (if any)SHREE SAIBABA INFRAPROJECTS PVT LTD
Contractor AddressHIG-5 PHASE-2 ASHOK VIHAR COLONY PAHARIYA VARANASI
Architect NameNISHANT SHEKHAR
Architect AddressM/S DES ARC UGSR-1A ANSAL PLAZA SECTOR-1 VAISHALI GHAZIABAD
Architect Licence NumberCA/2006/39203
Structural Engineer NameDIWAKAR BHAGAT
Structural Engineer AddressSUDHA TECHNICAL CONSULTANTS(P) LTD. F-702 UPPER GROUND FLOOR LADO SARAI NEW DELHI
Mobile number(Project Co-ordinator)9628417784