Project Area
Launch Date
Completion Date
RERA ID
26 47 3.6 N
80 53 23.08 E
YES
YES
INTERNAL DRIVEWAY IN PROGRESS, WELL CONNECTED TO EXTERNAL TO KANPUR ROAD SCHEME SECTOR-E
IN PROGRESS
WATER SUPPLY FOR RCC TANK FOR TERRACE EACH FLAT
CONNECTED TO EXISTING TRUNK SEWER LINE
TO EXTERNAL DRAIN
YES
YES
YES
NO
CONNECTED TO EXISTING TRUNK SEWER LINE WHICH FINALLY DISPOSED TO S.T.P.
TO PRIVATE VENDOR
YES
NO
YES
NEAR BY DEVELOPED SCHEME
YES
PASSENGER AND CARGO LIFT, TELEPHONE CONDUITING LINE
No: SANCTION COMMITEE NOTE OF PROJECT | Date: 26-04-2016
Showing 4 blocks with 36 units
Total Carpet Area
11241.72 m²
121004.75 ft²
Total Units
126
1 different types
Blocks & Floors
4
9 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
5864.00 m²
63119.51 ft²