OngoingActive

SHALIMAR CITY PHASE-1

Ghaziabad, Uttar Pradesh
09-09-2018Completion
OngoingType
GhaziabadDistrict
3000 LCost

Basic Details

Project Type:Ongoing
Project Category:Residential
Total area in round figure (Sq.mt.):4239
Project Name:SHALIMAR CITY PHASE-1
Registration Fee (in Rs.):26500
Address:Not specified
Village/Locality/Sector etc.:Not specified
State:Uttar Pradesh
Project Duration (In month):91
District:Ghaziabad
Original Start Date:01-03-2011
Tehsil:Modinagar
Proposed Start Date:01-03-2011
Sanctioning Competent Authority:Ghaziabad Development Authority
Project Cost (in Lacs):3000
Proposed Completion Date:09-09-2018

Location

Latitude

28 43' 7.29' N

Longitude

77 44' 57' 46' E

Bank Details

Account no.:910020040288600
Name Of Account Holder:MR PROVIEW REALTECH PVT. LTD.
Bank Name:AXIS BANK LTD.
Branch Address:3-N-30, AMBEDKAR ROAD, NEHRU NAGAR, GHAZIABAD
Branch Name:NEHRU NAGAR, GHAZIABAD
IFSC Code:UTIB0000095

Development Works

Demarcation of Plots

Private- Free Hold Land, Demarcation was already done before starting the project

Boundary Wall

Boundary wall on RCC Tie, Beam on RCC Footing

Road Work

Cements Concrete Internal Roads( CC Roads above two Layers of WBM

Footpaths

Interlocking Tile, on PCC on competed surface

Water Supply Including Drinking Water Facilities

To Be provided by Ghazvanid Development Authority and stores will be done underground water tanks

Sewer System

Main Sewer line has been design as per norm and partially led in basement ceiling and will finally connect to sewer line/ STP

Drain

Under ground Drain pipe with chamber

Parks

Landscape and park has been designed as per authority guide lines

Tree Planting

Tree panting has been design as per Authority Guide lines

Design For Electric Supply Including Street Lighting

Design has been done as per Up electricity Board Guide lines

Community Buildings

Club has been Design as per Authority Norms and facility like party hall gaming zone Entertainment area gym etc.

Treatment and Disposal System of Sewage and Sullage water

Sewage will be treated for recycling ( if required ) other wise it will be connected to sewage line of Authority which is already connected to central functional STP of GDA For this locality.

Solid Waste Management And Disposal System

Door to Door Collection and will be treated by waste disposal management.

Water Conservation System

Recycling of Treated water and rain water harvesting system to be provided.

Energy Management System Including Use of Renewable Energy

Solar panel will be provided as per norms as suitable Places

Fire Protection And Fire Safety System

Fire System is being executed per the norm of department of fire.

Social Infrastructure And Other Public Amenities Including Public Health Services

Nursery School in the premises

Emergency Evacuation Services

Provision of exit sign and emergency light.

Other Miscellaneous Work

N/A

Uploaded Documents

Details of Encumbrances

Commencement Certificate

Other Plan(If Any)

Affidavit

Proforma of Application Form

Uploaded: 31-07-2018

Proforma of Allotment Letter

Uploaded: 31-07-2018

Proforma of Conveyance Deed

Uploaded: 31-07-2018

Proforma of Completion Certificate(Occupancy)

Uploaded: 31-07-2018

Waste Disposal Plan

Uploaded: 31-07-2018

Water Supply Plan

Uploaded: 31-07-2018

Development Work Plan

Uploaded: 31-07-2018

CA CERTIFICATE

Uploaded: 31-07-2018

ARCHITECT CERTIFICATE

Uploaded: 31-07-2018

ENGINEERS CERTIFICATE

Uploaded: 29-07-2018

Affidavit

Uploaded: 30-07-2017

Affidavit

Uploaded: 30-07-2017

Other Plan(If Any)

Uploaded: 26-10-2017

Registry Document In Case of Own Land

Uploaded: 26-10-2017

Other Plan(If Any)

Uploaded: 26-10-2017

Other Plan(If Any)

Uploaded: 26-10-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 26-10-2017

Other Plan(If Any)

Uploaded: 26-10-2017

Permits

Orignal Permit No660/THA/GH/2015
Orignal Permit Date16-07-2015
Valid Upto09-09-2018
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto09-09-2018
End Date09-09-2018
Uploaded Approve Layout-
Uploaded Sanctioned Letter-
Uploaded Approved Map-
Uploaded Floor Plan Of All Types-
Uploaded Project Specifications-
Uploaded Sajra Detail-

Project Team

Contractor Name (if any)N/A
Contractor AddressN/A
Architect NameANUJ AGARWAL
Architect AddressA-244, KAUSHAMBI, GHAZIABAD
Architect Licence NumberCA/96/19503
Structural Engineer NameSADANAND OJHA
Structural Engineer Address503, Sachdeva Corporate Tower, Plot No-8, Sector-8, Rohini, Delhi
Mobile number(Project Co-ordinator)9999537765

Project Land Details

AFS

Showing 1 blocks with 60 units

Property Summary

Total Area

11484.72

123620.38 ft²

Total Units

168

2 different types

Blocks & Floors

1

12 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:68.36
Balconies:192
Parking ratio:0.00 per unit

Block Silverbell

60 units

Other Details

Contractor Name (if any):N/A
Contractor Address:N/A
Architect Name:ANUJ AGARWAL
Architect Address:A-244, KAUSHAMBI, GHAZIABAD
Architect Licence Number:CA/96/19503
Structural Engineer Name:SADANAND OJHA
Structural Engineer Address:503, Sachdeva Corporate Tower, Plot No-8, Sector-8, Rohini, Delhi
Mobile number(Project Co-ordinator):9999537765