NewActive

SHAGUN CITY CENTER

Gautam Buddha Nagar, Uttar Pradesh
01-07-2024Launch Date
NewType
UPRERAPRJ351670/07/2024RERA ID
11-04-2029Completion Date

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)4374
Project NameSHAGUN CITY CENTER
Registration Fee (in Rs.)54000
AddressPlot No. C-02, Sector-PI-1, Greater Noida, Gautam Buddh Nagar, U.P.-201310
Village/Locality/Sector etc.Sector-PI-1
StateUttar Pradesh
Project Duration (In month)58
DistrictGautam Buddha Nagar
Original Start Date-
TehsilDadri
Proposed Start Date01-07-2024
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)9501
Proposed Completion Date11-04-2029

Location

Latitude

28.46192

Longitude

77.53700

Bank Details

Account Details
Name of the AccountSHAGUN MART LLP-COLLECTION A/C FOR SHAGUN CITY CENTER
Account Number4849939583
Bank NameKOTAK MAHINDRA BANK
Branch NameGreater Noida
Branch AddressHarsha Mall Alpha-1
IFSC CodeKKBK0005028
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
Branch Email Address05028greaternoidarefrral@kotak.com
Separate Account Details
Name of the AccountSHAGUN MART LLP-SEPARATE BANK A/C FOR SHAGUN CITY CENTER
Account Number4849939552
Bank NameKOTAK MAHINDRA BANK
Branch NameGreater Noida
Branch AddressHarsha Mall Alpha-1
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeKKBK0005028
Transaction Account Details
Name of the AccountSHAGUN MART LLP-RERA TRANSACTION A/C FOR SHAGUN CITY CENTER
Account Number4849939576
Bank NameKOTAK MAHINDRA BANK
Branch NameGreater Noida
Branch AddressHarsha Mall Alpha-1
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeKKBK0005028

Development Works

Demarcation of Plots

Enclosed Boundary Wall R.C.C./ Brick having 230 mm width and height 1.8 M

Boundary Wall

Combination of R.C.C. column with brick work, plaster/paint.

Road Work

Road pattern is provided in such a way that approach to all the towers is motorable and section consists of Subgrade preparation with 1 layer GSB and 1 layer Cement Concrete pavement/pavers as per design of Developers Consultant.

Footpaths

Combination of kerb Stone/pavers/cement concrete as per design of Developers Consultant.

Water Supply Including Drinking Water Facilities

System for water is ground water and provided thru undergroun/overhead water tank with individual ROs to be installed by Allottee.

Sewer System

Shop Hold Sewerge is collected through sewage lines upto the STP established for the project and after treatment the sludge and treated water obtained shall be used in green areas like green landscapes and also for flushing lines.

Drain

Rain Water collection shall be done from terrace thru storm water lines/covered drains at ground level and connected to rain harvesting pits.

Parks

Provision of green area as per Design of Developers Architect.

Tree Planting

Planned trees are 25 Nos. in open area and along the boundary wall different types of trees shall be provided.

Design For Electric Supply Including Street Lighting

Electrical connection for the apartment from PVVNL of its licensee/sub-lacensee and connection will be provided to to customers thru prepaid meter and proportionate electricity infrastructure cost including feeder construction expenses, substations/panels/transformers/other equipment / expenses, cabling expenses, system loading charges, security charges etc as per applicable shall be borne by the customers and further subject to regular payments of fixed electricity charges, usage/consumption charges and energy losses/line distribution losses and payment of taxes/cess/duties/lavy as applicable and demanded from time to time as per guidelines laid down by power supply company/goverment.

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

Shall be connected to STP provided for treating household sewerage and the treated sludge/water is being used for green area and flushing system.

Solid Waste Management And Disposal System

House to House collection system has been planned with a arrangement of seprate collection of decomposable and non decomposable waste in separate bags and a treatment arrangement for the same.

Water Conservation System

2 nos. underground recharge pits with perforated filter media used for rain water harvesting provided.

Energy Management System Including Use of Renewable Energy

NA

Fire Protection And Fire Safety System

Vertical risers with FHC shaft/sprinklers and connected to pump room with a provision of jockey/Main/diesel pump as per NBC.

Social Infrastructure And Other Public Amenities Including Public Health Services

Nil

Emergency Evacuation Services

Fire Staircase provided as per NBC.

Other Miscellaneous Work

NA

Documents

Lease Deed

No: 43530 | Date: 27-09-2023

Allotment Letter issued by Competent Authority

No: GNIDA/COM/CPS-XII/2022-23//3094 | Date: 17-03-2023

Commencement Certificate

Proforma of Completion Certificate(Occupancy)

Other

Details of Encumbrances

Uploaded: 08-05-2024

Commencement Certificate

Uploaded: 04-05-2024

Other Plan(If Any)

Uploaded: 04-05-2024

Proforma of Application Form

Uploaded: 03-05-2024

Proforma of Allotment Letter

Uploaded: 29-05-2024

Proforma of Conveyance Deed

Uploaded: 29-05-2024

Waste Disposal Plan

Uploaded: 03-05-2024

Water Supply Plan

Uploaded: 03-05-2024

Electricity Supply Plan

Uploaded: 03-05-2024

Development Work Plan

Uploaded: 29-05-2024

Affidavit

Uploaded: 04-05-2024

CA CERTIFICATE

Uploaded: 29-05-2024

ARCHITECT CERTIFICATE

Uploaded: 29-05-2024

ENGINEERS CERTIFICATE

Uploaded: 29-05-2024

Other

Uploaded: 04-06-2024

Proforma of Agreement for Sale

Uploaded: 08-05-2024

Permits

Orignal Permit NoSM-02-Jan-2024 20034
Orignal Permit Date12-04-2024
Valid Upto11-04-2029
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto11-04-2029
End Date11-04-2029
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)SHAGUN MART LLP
Contractor AddressPLOT NO. C-02, SECTOR-PI-1, GREATER NOIDA, U.P.-201310
Architect NameMr. SHIV KUMAR
Architect AddressPlot No. B-99, First Floor, Sector-63, Noida-201301
Architect Licence NumberCA/17/88101
Structural Engineer NameROSHAN ALI
Structural Engineer Address147, SECOND FLOOR, TAIMOOR NAGAR, NEW DELHI-110025
Mobile number(Project Co-ordinator)9319990019

Land Details

AFS

Showing 1 blocks with 415 units

Property Summary

Total Area

12373.93

133191.75 ft²

Total Units

414

2 different types

Blocks & Floors

1

14 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:29.89
Balconies:0
Parking ratio:0.00 per unit

Block SHAGUN CITY CENTER

415 units

Khasra Details

Total Area

4374.00

47081.30 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoC-02
Area(In Sq. Mt.)4374

Other Details

Contractor Name (if any)SHAGUN MART LLP
Contractor AddressPLOT NO. C-02, SECTOR-PI-1, GREATER NOIDA, U.P.-201310
Architect NameMr. SHIV KUMAR
Architect AddressPlot No. B-99, First Floor, Sector-63, Noida-201301
Architect Licence NumberCA/17/88101
Structural Engineer NameROSHAN ALI
Structural Engineer Address147, SECOND FLOOR, TAIMOOR NAGAR, NEW DELHI-110025
Mobile number(Project Co-ordinator)9319990019