As per sanction plan this is irregular plot. Having total 1 no. of entry gate and 1no. of exit gate from the 45m wide road. Site has 9m internal road. Site is surronded by other plots on one side and one side by promotors plot.
1.8 - 2.3m high and 290 mm thick Boundary wall designed . Brick Work of 9inches and rcc work in column and beam may be used as per design. MS Broad entrance and exit gates are developed with boundary.
Trimix / asphalt road will be used as per deisgn suggested by the Architect for internal road.
All internal roads will have narrow footpath with pavers or equivalent finishes as per landscape design.
The potable water supply of desired quality & purity shall be ensured.
Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for treatement.Proper provision of sewer lines has been provided
Storm water system shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connected with Municiple drain line.
There are significant green area including green parks, play areas for childrens and different recretional activities.
The trees of category ornamental ,shady and native species shall be planted in the entire project as per the species recommende in the landscape in order to maintatin greenary and natural view.
All the workings shall confer to Bureau Of Indian Standards , Indian Electricity Rules & Indian Electricity Acts.
NA
Centralized Sewerage system fo all plots shall be connected to STP . All Sewerage water shall go to the STP for treatment after treatement ,water shall be recycle and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system.
Project shall have waste segregation area. The solid waste shall be encouraged for segregation. Dustbins shall be provided for segregated waste in the common areas within the campus and other waste shall be handed over to the government vendors for further disposal.
A well designed rain water harvesting system/ water storage tank shall be provided for the whole complex to conserve water.
We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. Also timer controlled panels shall be used for efficient energy management.
All Fire norms shall be followed as per NBC Part 4 code and approval of fire department. fire sprinklers,FHC with pumps are provided as per norms.
Proper provision fo social infra and public amenities provided.
NA
NA
Showing 1 blocks with 1 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
7.00 m²
75.35 ft²