NewActive

SAWASDEE CENTRE

Ghaziabad, Uttar Pradesh
01-12-2020
Launch Date
New
Type
08-06-2025
Completion Date

Overview

Project Area

0.9511 acres

Launch Date

01-12-2020

Completion Date

08-06-2025

RERA ID

UPRERAPRJ778592

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)3849
Project NameSAWASDEE CENTRE
Registration Fee (in Rs.)49000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)55
DistrictGhaziabad
Original Start Date-
TehsilGhaziabad
Proposed Start Date01-12-2020
Sanctioning Competent AuthorityU.P. Awas Evam Vikas Parishad
Project Cost (in Lacs)6082
Proposed Completion Date08-06-2025

Location

Latitude

28.4011

Longitude

77.2240

Bank Details

Account no.3711002100025534
Name Of Account HolderASTEROID SHELTERS HOMES PVT. LTD.
Bank NamePUNJAB NATIONAL BANK
Branch AddressBRIJ VIHAR, GHAZIABAD, U.P. 201011
Branch NameBRIJ VIHAR GHAZIABAD
IFSC CodePUNB0371100

Development Works

Demarcation of Plots

PLOT NO-INS-5, SECTOR 2B, VASUNDHARA , GHAZIABAD, UTTAR PRADESH

Boundary Wall

AS PER THE CONSTRUCTION WE WILL DO 2 SIDES ADJOINING BOUNDRY WALL WITH OTHER OCCUPANT

Road Work

AS PER THE AUTHORITY GUIDLILNE WE WILL DO CEMENT CONCREAT INTERNAL ROAD WORK

Footpaths

AS PER THE AUTHORITY GUIDLINE WE WILL DO INTERLOCKING PAVER

Water Supply Including Drinking Water Facilities

MUNICIPAL WATER SUPPLY WILL BE USED AND STORAGE WILL BE DONE UNDERGROUND WATER TANK

Sewer System

AS PER AUTHORITY NORMS WE WILL DO THE MAIN SEWER LINE DESIGNS WILL BE INSTALLED

Drain

AS PER AUTHORITY MAP GUIDLINE UNDERGROUND PIPE DRAIN WITH CHAMBER WILL BE INSTALLED

Parks

DESIGNED AS PER SACCTIONED MAP AND AUTHORITY GUIDELINES

Tree Planting

TREE PLANTING HAS BEEN DESIGNED AS PER AUTHORITY GUIDELINES AND WILL BE INSTALLED

Design For Electric Supply Including Street Lighting

AS PER THE UTTAR PRADESH POWER CORPORATION LIMITED GUIDLINES DESIGN FOR ELECTRIC SUPPLY INCLUDING STREET LIGHTING WILL BE INSTALLED

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

AS PER THE AUTHORITY GUIDLINES PROVIDE FOR THE TREATMENT AND DISPOSAL SYSTEM SEWAGE AND SULLAGE WATER WE WILL HAVE THE INSTALLATION OF STP 80 KLD

Solid Waste Management And Disposal System

DOOR TO DOOR COLLECTION OF THE SOLID WASTE WILL BE MADE

Water Conservation System

RECYELING OF TREATED WATER AND ARRANGEMENT WILL BE MADE FOR RAIN WATER SYSTEM

Energy Management System Including Use of Renewable Energy

LED LIGHT WILL BE PROVIDED AS PER SUITABLE PLACE

Fire Protection And Fire Safety System

AS PER FIRE DEPARTMENT GUIDELINES DESIGN AND DEVELOPMENT OF FIRE PROTECTION AND FIRE SAFETY SYSTEM WILL BE INSTALLED

Social Infrastructure And Other Public Amenities Including Public Health Services

AS PER AUTHORITY GUIDELINES SOCIAL INFRASTRUCTURE AND OHER PUBLIC AMENITIES INCLUDING PUBLIC HEALTH SERVICES.

Emergency Evacuation Services

NECESSARY ARRAGEMENT WILL BE MADE AS PER SANCTIONED PLAN AND THE GUIDLINE PROVIDED BY THE AUTHORITY WE WILL HAVE EMERGENCY EVACUATION SERVICES

Other Miscellaneous Work

NA

Documents

Sale Deed

No: REGISTRATION NO 7749-VOLUME NO 1, JILD NO 39426 ON PAGES 265 TO 312 | Date: 28-10-2020

Registry Document

No: REGISTRATION NO 171-BAHI NO 4/JIND NO 2025 ON PAGES 173 TO 192 | Date: 21-01-2021

Allotment Letter issued by Competent Authority

No: SCREENSHOT OF EMAIL AND LETTER SENT TO UP AVAS & VIKAS PARISHAD LUCKNOW | Date: 29-01-2021

Proforma of Completion Certificate(Occupancy)

CA CERTIFICATE

ARCHITECT CERTIFICATE

Details of Encumbrances

Uploaded: 15-02-2022

Commencement Certificate

Uploaded: 06-01-2021

Other Plan(If Any)

Uploaded: 29-01-2021

Proforma of Application Form

Uploaded: 06-01-2021

Proforma of Allotment Letter

Uploaded: 06-01-2021

Proforma of Conveyance Deed

Uploaded: 06-01-2021

Waste Disposal Plan

Uploaded: 06-01-2021

Water Supply Plan

Uploaded: 06-01-2021

Electricity Supply Plan

Uploaded: 06-01-2021

Development Work Plan

Uploaded: 06-01-2021

Affidavit

Uploaded: 06-01-2021

CA CERTIFICATE

Uploaded: 29-01-2021

ARCHITECT CERTIFICATE

Uploaded: 30-01-2021

ENGINEERS CERTIFICATE

Uploaded: 30-01-2021

Permits

Orignal Permit No1218/Va-Ni-5/online/2020
Orignal Permit Date09-06-2020
Valid Upto08-06-2025
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto08-06-2025
End Date30-06-2024
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)ASTEROID SHELTERS HOMES PVT. LTD.
Contractor AddressH-175 SECTOR 63 NOIDA
Architect NameMODARCHINDIA
Architect AddressB 99 SECTOR 63 NOIDA
Architect Licence NumberCA/98/22706
Structural Engineer NameNNC DESIGN INTERNATIONAL
Structural Engineer AddressG-70 SECOND FLOOR , JASWANT PLAZA NEAR KALINDI KUNJ , OKHLA , NEW DELHI 110025
Mobile number(Project Co-ordinator)9643326973

Land Details

AFS

Showing 1 blocks with 85 units

Property Summary

Total Carpet Area

3370.30

36277.57 ft²

Total Units

82

3 different types

Blocks & Floors

1

9 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:41.10
Balconies:0
Parking ratio:0.00 per unit

Block A

85 units

Khasra Details

Total Area

3848.88

41428.96 ft²

1 plot
Plot
TypePlot
Khasra/Plot No2B/INS-5 SECTOR 2B, VASUNDHARA , GHAZIABAD
Area(In Sq. Mt.)3848.88

Other Details

Contractor Name (if any)ASTEROID SHELTERS HOMES PVT. LTD.
Contractor AddressH-175 SECTOR 63 NOIDA
Architect NameMODARCHINDIA
Architect AddressB 99 SECTOR 63 NOIDA
Architect Licence NumberCA/98/22706
Structural Engineer NameNNC DESIGN INTERNATIONAL
Structural Engineer AddressG-70 SECOND FLOOR , JASWANT PLAZA NEAR KALINDI KUNJ , OKHLA , NEW DELHI 110025
Mobile number(Project Co-ordinator)9643326973