28.6821454
77.3781705
Divided in four phases, PH-1, has been already completed.
Boundary wall already constructed with RCC Frame structure, Plaster over the brick work.
RCC road to be provided
Footpath with Interlocking tile to be provided
Water supply to be provided through municipal water as well as underground bore well.
FULL STP is working.
Surface drainage system provided to be provided
Parks to be developed in open area with swings & sittings.
Tree planting across the boundary wall.
single point supply system is installed ,Street ligting provided across boundry wall
To be constructed
Full STP working.
to be dispose of through the outside housekeeping contractor.
Rainwater harvesting system to be provided.
None
Fire alarms, PA systems to be provided.
Open Park, Gym, Club & swimming pool, tennis soprt to be provided
Fire alarms, Exit/direction signs to be provided.
None
Showing 4 blocks with 164 units
Total Area
24496.62 m²
263679.17 ft²
Total Units
311
4 different types
Blocks & Floors
4
15 floors across all blocks
Parking
0
0 garages, 0 open