Divided in four phases, PH-1, has been already completed.
Boundary wall already constructed with RCC Frame structure, Plaster over the brick work.
RCC road provided
Footpath with Interlocking tiles
Water supply provided through municipal water as well as underground bore well.
FULL STP is working.
Surface drainage system provided.
Parks developed in open area with swings & sittings.
Tree planting across the boundary wall.
Single point supply & street lights across the boundary wall.
To be constructed in PH-4.
Full STP working.
Through the outside housekeeping contractor.
Rainwater harvesting system provided.
None
Fire alarms, PA systems & Fire pumps are provided.
Open Park, Gym, Club & swimming pool, tennis soprt
Fire alarms, Exit/direction signs are provided.
None.
Showing 2 blocks with 30 units
Total Area
97663.32 m²
1051238.21 ft²
Total Units
120
2 different types
Blocks & Floors
2
15 floors across all blocks
Parking
0
0 garages, 0 open