Demarcation of plots has been already completed and construction of individual villas is started. Since project was primarily registered for Row houses, hence wall of each house is connected with others.
6 feet heighted boundry wall will be constructed of brick.
20 Feet RCC Road infront each of house will be constructed and this will be linked with main road.
There is no footpath beside the roads. 2 feet wide footpath will be made beside the main road
a 100000 liter water tank will be constructed and water supply will connected to each house through underground pipeline. This pipe line will be an underground pipe line below the road.
A STP will be made in the project for collection of sewer of each house. The sewer line is situated below the RCC Road.
Drain water is collected throgh pipeline and wil be stored in tank for treatment
There is no park in poject
500 trees wil be planted beside the boundry of project
Electric supply including Street light design is ready and will be uploded in documents section. Electrical supply will be sought from UPPCL. File for connection will be moved after 50 percent completion of project.
There is no provision of comunity building
A soft pit will be costructed in the project for treatment and disposal of Sewage and sullage water. after treatment water will be recycled
Local municipal help will be taken for solid waste management
Rain water harvesting system will be develop for water conservation.
There is no provision of renewable energy.
Fire helpline number wil lbe displayed at various points in the project.
One public toilet including bath room will be constructed.
There will be 2 gates in the colony for safty point of view.
any other development will be prior inform to residents.
Total Area
40471.00 m²
435625.80 ft²