For Demarcation of Plots Total Nos. of RCC Tee Post -1104 Nos. Total RCC Demarcation Board-60 Nos.
Not applicabler
12 Mtr wide Road- Length- 2200 Mtr Width-5.5 mtr (carriageway) Thickness of carriageway-layer wise details as follows (a)1st layer (90mm-45mm stone blast)-10cm (b) 2nd layer (63 mm-45mm stone blast)-7.5cm (c) 3rd layer (53mm-22.4mm stone blast) 7.5cm (d) Top Bituminus layer- mixed seal surface-2.5cm Total thickness-27.5cm 18 mtre Road- Lenght 414 mtr Width-7.00mtr (Carriageway) Thickness of carriageway-Layer wise details as following- (a) 1st layer (63mm-45mm stone blast) 10cm (b) 2nd layer (63mm-45mm stone blast) 7.5cm (c) 3rd layer (63mm-45mm stone blast) 7.5cm (d)4rth layer (53mm-22.5mm stone blast) 7.5cm (e) Top Bituminus layer -Mix seal surface -2.5cm Total Thickness-35cm 24 mtr wide road Length-488 mtr Width-7.00mter (carriageway) Thickness of carriageway-Layer wise details as follows (a)1st layer (90mm-45mm stone blast) 10cm (b) 2nd layer (63mm-45mm stone blast) 7.5cm (c)3rd layer )63mm-45mm stone blast) 7.5mm (d) 4rth layer (53mm-22.5mm stone blast) 7.5 cm (e)Top Bituminus layer -Mix seal surface -2.5cm Total thickness-35cm (d)
Not applicable
Water Supply Line- (a) 550mtr length in 250mm dia pipe DI (Rising main) (b) 1200 mtr in 160mm dia PVC Pipe (c) 1700 mtr length in 110mm dia PVC Pipe
Sewer Line- (a) 2515 mtr length in NP-2, 250mm dia (Hume Pipe) (b) 348 mter length in NP-3 , 350mm dia (Hume pipe) (c) 552 mtr length in NP-3 150mm dia (Hume Pipe) Sewer Main Hole Details- (a) MH-900mm dia -108 nos (b) MH- 1200mm Dia -15 Nos. (c) MH-1500mm dia -15 nos. (d) Chamber- 276 Nos.
RCC Drain (a) 600 mter length- 1200mm wide 1800mm debth (b) 1000 mtr- 900mmwide 1500mm debth (c) 1100 mter length-600mm wide 1000mm debth (d)3504 mtr lenght-450mm wide 650mm debth
Total area of grassing in park -13000 sqm Total nos. of tree planting in parks-500 nos. Total nos. of shrubs planting in park-1000 nos.
1164 Nos. Tree planting on road side
2 Nos. of 11/0.415 KV Sub Station 4 Nos. 360 KVA transformer 100 Nos. Street Light Fitting Poles 70 Nos. Main Feeder Pillars Sub Feeder Pillars 14000 mtr LT HT Cable
Not applicable
Sewer line will be laid under this project which will be connected to the main line which connect to the STP location at Sector 24A
Not Applicable
After handover plots to the allottee, water harvesting system will be construct by individual allottee of all plots as per YEIDA building Bye laws
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Showing 1 blocks with 1 units
Total Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
105869.55 m²
1139569.25 ft²