NewActive

Rishita Mulberry Heights Phase 3

Lucknow, Uttar Pradesh
01-03-2020
Launch Date
New
Type
17-01-2026
Completion Date

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)18314
Project NameRishita Mulberry Heights Phase 3
Registration Fee (in Rs.)97000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)71
DistrictLucknow
Original Start Date-
TehsilSarojini Nagar
Proposed Start Date01-03-2020
Sanctioning Competent AuthorityLucknow Development Authority
Project Cost (in Lacs)18085
Proposed Completion Date17-01-2026

Location

Latitude

26.781081

Longitude

81.009128

Bank Details

Account no.50200048183700
Name Of Account HolderRISHITA DEV P LTD MUL HEI P3 RERA A/C
Bank NameHDFC Bank Ltd
Branch AddressGOMTI NAGAR, LUCKNOW
Branch NameGOMTI NAGAR
IFSC CodeHDFC0001112 

Development Works

Demarcation of Plots

This is single plot of rectangular shape , having total 3 no. of entry gate in which 1 main gate having grand entrance from the 45m wide front road and rest of 2 are secondary gates from 24 m wide road. Site is surronded by other plots on one side and 30m wide road.

Boundary Wall

1.8 - 2.4m high and 200 mm thick Boundary wall designed . Concrete hollow block work and rcc work in column and beam may be used as per design. Entrance gates will be created at the main entrance .Steel Gates will used at secondary entrances

Road Work

Paver/tremix based road will be created for all internal road works with concrete pavers at certain junction points.

Footpaths

All internal roads will have 1.5m wide footpath in 40- 60 mm thick concrete pavers or equivalent finishes

Water Supply Including Drinking Water Facilities

Underground Tank of 830 KL Capacity.

Sewer System

Underground System using uPVC(SN-4) Sewer pipes.

Drain

Underground System using uPVC(SN-4) pipes.

Parks

There is one main central park between the towers with different recretional activities. There are more green parks by the boundary wall on two sides of the complex

Tree Planting

"There are 3 type of trees povided in site which are Bahunia Blackena(12 no.), Phoenix Dactylifera(220 No.), Ficus Benjamina(218 No.)"

Design For Electric Supply Including Street Lighting

Five nos. Transformers of 1600 KVA, 33 / 0.4 KV capacity each shall be used along with necessary switch-gear for distributing electricity at LT voltage. All street / landscape lighting shall be LED based & automatically controlled by astronomical timer and for energy saving, the same shall be selectively controlled by timer as per the time zone

Community Buildings

Community activity area shall be provided at the site in central area which shall be accessed by all residents.

Treatment and Disposal System of Sewage and Sullage water

STP of Capacity 720 KLD shall be provided. Treated water shall be used for Flushing, irrigation, carwash, pathway cleaning & excess water shall be discharged into the Municipal Sewer as per site.

Solid Waste Management And Disposal System

There are a proper garbage collection area provided for the solid waste management.

Water Conservation System

Rain Water Harvesting facilities shall be provided & treated sewage water shall be recycled to the extent feasible.

Energy Management System Including Use of Renewable Energy

Solar panels shall be provided on terrace for renewable energy. Energy purchased from the grid/ power supply company & metering will be done as per electricity supply authority guideline.

Fire Protection And Fire Safety System

Fire Tender path shall be provided as per NBC. Fire Fighting system along with pumps & water storage tanks shall be provided as per NBC & NOC from Fire Department.

Social Infrastructure And Other Public Amenities Including Public Health Services

"Sewerage ,Storm water and water supply system shall be Provided. We have Proposed common Pump Room with Primary filtration, Transfer pumps to fill the domestic overhead tank. Water for domestic use & Flushing go down through gravity from domestic as well as flushing tanks. All Sewgage shall be go to the STP for recycling the water. Storm water for Roof,Roads and other area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain."

Emergency Evacuation Services

Balcony will also be used for evacuation.Assembly points areas will be demarcated for earthquake and other possible disasters

Other Miscellaneous Work

Not Applicable

Documents

Sale Deed

No: 5187 | Date: 19-02-2020

Extract of Khatauni

No: - | Date: -

Proforma of Completion Certificate(Occupancy)

CA CERTIFICATE

Details of Encumbrances

Uploaded: 25-02-2020

Commencement Certificate

Uploaded: 25-02-2020

Other Plan(If Any)

Uploaded: 25-02-2020

Proforma of Application Form

Uploaded: 25-02-2020

Proforma of Allotment Letter

Uploaded: 25-02-2020

Proforma of Conveyance Deed

Uploaded: 25-02-2020

Waste Disposal Plan

Uploaded: 25-02-2020

Water Supply Plan

Uploaded: 25-02-2020

Electricity Supply Plan

Uploaded: 25-02-2020

Development Work Plan

Uploaded: 25-02-2020

Affidavit

Uploaded: 25-02-2020

CA CERTIFICATE

Uploaded: 03-03-2020

ARCHITECT CERTIFICATE

Uploaded: 25-02-2020

ENGINEERS CERTIFICATE

Uploaded: 25-02-2020

Permits

Orignal Permit No42917
Orignal Permit Date23-04-2018
Valid Upto22-04-2023
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto22-04-2026
End Date31-03-2024
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit No42917
Orignal Permit Date18-01-2021
Valid Upto17-01-2026
Revalidated Permit No42917
Revalidated Permit Date18-01-2021
Revalidated Permit Valid Upto01-01-1900
Permit Extendable Upto17-01-2029
End Date30-09-2024
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Rishita Developers Pvt. Ltd.
Contractor Address116/117, Vibhuti Khand, Corronation Anand Tower, Lucknow
Architect NameDesign Forum International
Architect AddressK-47, Kailash Colony, New Delhi
Architect Licence NumberCA/2012/57857
Structural Engineer NameEr. Maqsud-e-Nazar
Structural Engineer AddressP.N. 25, Ground Floor, Pocket-2, Jasola, New Delhi
Mobile number(Project Co-ordinator)7570007505

Land Details

AFS

Showing 3 blocks with 77 units

Property Summary

Total Area

38556.26

415015.73 ft²

Total Units

359

2 different types

Blocks & Floors

3

15 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:107.40
Balconies:293
Parking ratio:0.00 per unit

Block Tower D2

15 units

Block Tower C2

31 units

Block Tower C3

31 units

Khasra Details

Total Area

18313.92

197129.20 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoPart of Group Housing I, Plot no SECTOR C, POCKET 6, Sushant Golf City,Lucknow
Area(In Sq. Mt.)18313.92

Other Details

Contractor Name (if any)Rishita Developers Pvt. Ltd.
Contractor Address116/117, Vibhuti Khand, Corronation Anand Tower, Lucknow
Architect NameDesign Forum International
Architect AddressK-47, Kailash Colony, New Delhi
Architect Licence NumberCA/2012/57857
Structural Engineer NameEr. Maqsud-e-Nazar
Structural Engineer AddressP.N. 25, Ground Floor, Pocket-2, Jasola, New Delhi
Mobile number(Project Co-ordinator)7570007505