NewActive

RISE RETAILIA

Gautam Buddha Nagar, Uttar Pradesh
15-06-2021
Launch Date
New
Type
03-11-2025
Completion Date

Overview

Project Area

1.3653 acres

Launch Date

Invalid Date

Completion Date

03-11-2025

RERA ID

UPRERAPRJ394572

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)5525
Project NameRISE RETAILIA
Registration Fee (in Rs.)43000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)53
DistrictGautam Buddha Nagar
Original Start Date-
TehsilDadri
Proposed Start Date15-06-2021
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)1000
Proposed Completion Date03-11-2025

Location

Latitude

28.581156237783098

Longitude

77.42812598508434

Bank Details

Account no.0200102000033424
Name Of Account HolderRise projects pvt ltd
Bank NameIDBI bank ltd
Branch AddressH1A/30, sector 63
Branch Namesector 63 branch
IFSC CodeIBKL0000200

Development Works

Demarcation of Plots

Site is located at plot no SC01. Total site area is 352036 sqmt but the portion of land used for development is 3225 sqmt.

Boundary Wall

Low ht boundary wall as per design / requirement

Road Work

Combination of interlocking blocks / Bitumin road.

Footpaths

Combination of interlocking block / Natural stone

Water Supply Including Drinking Water Facilities

Water supply by Greater noida development authority

Sewer System

System using uPVC(SN4) sewer pipes.

Drain

System using uPVC(SN4) pipes.

Parks

it will be part of overall development

Tree Planting

As per GNIDA norms.

Design For Electric Supply Including Street Lighting

Transformers (Compact substation) shall be used along with necessary switch gear for distribution of electricity at LT voltage.

Community Buildings

It will be part of overall development

Treatment and Disposal System of Sewage and Sullage water

STP shall be provided, treated water from STP shall be used in irrigation, car wash and pathway cleaning.

Solid Waste Management And Disposal System

solid waste collection bins to be provided at regular intervals.

Water Conservation System

Rainwater harvesting facility shall be provided. Treated water from STP shall be used to the extant feasible.

Energy Management System Including Use of Renewable Energy

as per GNIDA

Fire Protection And Fire Safety System

Fire tended path shall be provided as per NBC, Fire fighting system along with pumps and water tanks shall be provided at overall project development.

Social Infrastructure And Other Public Amenities Including Public Health Services

Toilet blocks shall be located at the complex for the visitors.

Emergency Evacuation Services

to be provided as per NBC.

Other Miscellaneous Work

As per requirement

Documents

Lease Deed

No: 020252273285070 | Date: 25-04-2016

Registry Document

No: 1234567 | Date: 27-07-2021

Allotment Letter issued by Competent Authority

No: Bank_letter | Date: 27-07-2021

Details of Encumbrances

Uploaded: 23-06-2021

Commencement Certificate

Uploaded: 23-06-2021

Other Plan(If Any)

Uploaded: 23-06-2021

Proforma of Application Form

Uploaded: 23-06-2021

Proforma of Allotment Letter

Uploaded: 23-06-2021

Proforma of Conveyance Deed

Uploaded: 23-06-2021

Proforma of Completion Certificate(Occupancy)

Uploaded: 23-06-2021

Waste Disposal Plan

Uploaded: 23-06-2021

Water Supply Plan

Uploaded: 23-06-2021

Electricity Supply Plan

Uploaded: 23-06-2021

Development Work Plan

Uploaded: 23-06-2021

Affidavit

Uploaded: 26-07-2021

CA CERTIFICATE

Uploaded: 23-06-2021

ARCHITECT CERTIFICATE

Uploaded: 23-06-2021

ENGINEERS CERTIFICATE

Uploaded: 23-06-2021

Permits

Orignal Permit NoPLG(BP)3724/66
Orignal Permit Date04-11-2016
Valid Upto04-11-2016
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto03-11-2021
End Date03-11-2025
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)prakartee akshay
Contractor Address128, govind khand, vishwash nagar, delhi
Architect Namerachit sharma
Architect Addressram vihar, delhi
Architect Licence NumberCA/2002/30415
Structural Engineer NameMr. Manish Gupta
Structural Engineer AddressF90, Southcity 2, Gurugram
Mobile number(Project Co-ordinator)9560014166

Land Details

AFS

Showing 2 blocks with 40 units

Property Summary

Total Carpet Area

4361.98

46951.92 ft²

Total Units

296

1 different types

Blocks & Floors

2

6 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:14.74
Balconies:0
Parking ratio:0.00 per unit

Block Retailia 1

20 units

Block Retailia 2

20 units

Khasra Details

Total Area

352036.00

3789280.30 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoSC-01
Area(In Sq. Mt.)352036

Other Details

Contractor Name (if any)prakartee akshay
Contractor Address128, govind khand, vishwash nagar, delhi
Architect Namerachit sharma
Architect Addressram vihar, delhi
Architect Licence NumberCA/2002/30415
Structural Engineer NameMr. Manish Gupta
Structural Engineer AddressF90, Southcity 2, Gurugram
Mobile number(Project Co-ordinator)9560014166