Project Area
Launch Date
Completion Date
RERA ID
28.653395311486186
77.47395326501068
Demarcation is done at site
Boundary wall to be provided as per Bylaws of GDA
Internal road designed considering Fire tender load
4 feet wide footpath / jogging track to be provided in central garden.
4 feet wide footpath / jogging track to be provided in central garden.
Underground System using uPVC(SN-4) Sewer pipes.
Underground System using uPVC(SN-4) pipes.
Central open area over basement slab as per design
As per bylaws of GDA
Transformers (Compact Sub station) shall be used along with necessary switch-gear for distributing electricity at LT voltage. All street / landscape lighting shall be LED based & automatically controlled by astronomical timer and for energy saving, the same shall be selectively controlled by timer as per the time zone
To be provided
STP of adiquated capacity shall be provided. Treated water shall be used for flushing, irrigation, carwash, pathway cleaning & excess water shall be discharged into the Municipal Sewer as per site.
As per requirement
Rain Water Harvesting facilities shall be provided & treated sewage water shall be recycled to the extent feasible.
Solar panels shall be provided on terrace for renewable energy. Single point metering will be there for energy purchased from the grid/ power supply company.
Fire tender path shall be provided as per NBC. Fire fighting system along with pumps & water storage tanks shall be provided as per NBC & NOC from Fire Department.
NA
Fire escape staircase provided in Each tower as per Fire NOC.
As per requirement.
Showing 3 blocks with 83 units
Total Carpet Area
8947.62 m²
96311.29 ft²
Total Units
100
2 different types
Blocks & Floors
3
20 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
5972.00 m²
64282.01 ft²