26.769079
82.224087
As per Approved Plan.
Not Provided
Road shall be constructed as per specification U.P. Avas Evam Vikas Parishad and U.P. PWD
Footpath will be constructed as per road Cross section approved from competant Authority
It Shall be provided in accordance with U.P. Jalnigam specifications. The Distribution netwrok consist of sectorial water line connected to O.H.T./U.G.R.
The Underground sewer network with mainhols and chambers shall be provided in accordance with U.P. Jalnigam specifications
Drainage Network shall be provided in line with the guidelines of drainage manual of U.P. Jalnigam/ Government of India.
Parks shall be developed as per U.P. Avas Evam Vikas Parishad specifications.
Will be done in parks and along the roads.
Well design Electrical distribution network will be provided as per the load calculation in accordence with UPPCL and National Electricity Code. Streel Light will be provided.
Not applicable
Sewer network will be provided and the effluent will be treated in common STP proposed for the whole scheme.
Will be done in accordence to solid waste management manual/Government Orders.
Not applicable
Not applicable
Integrated fire fighiting system for the entire township. the same shall be contstructed by the pramoter
The Integrated township shall have all kind of land use such as rasidential, commercial, Educational, Institutional, Hospital and Mutts etc. to have a complete socially sustainable township.
The township is part of Distt. Ayodhya Disaster mitigation plan. The Fire Department of Government of U.P. shall look after this. The lay out is opened towards all direction so that easy evacuation take place during urgency/ Emergencty.
Not applicable
Showing 1 blocks with 3 units
Total Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
86286.00 m²
928773.88 ft²