Project Area
Launch Date
Completion Date
RERA ID
26.336674
80.33234332
Plot is already well demarcated and all the development and construction work done under the boundary wall
Bricks made boundary wall combination of RCC is proposed around the project.
6 Mt. wide drive way is proposed which connected to the 45 mt. wide main road.
Footpath will be built through inter-locking tiles.
Over head water tanks shall be provided on the building terrace for distribution through gravity.
A Centralised sewer system is provided, under ground sewer line is constructed which will linked with main dumping point If required STP ETP plant will be installed as per requirment for recycling of waste material.
Storm water system will be provided which will be connected to the muncipal drain line as per specified plan.
There is no park but green area is proposed as per sanctioned plan.
There is several provisions for tree planting as per the approved area for the whole project.
We have designed the system as per local Electrisity Board and consider centralized transformer, HT panel, LT panel, Feeder Pillar and DG backup for common services like external lighting.
There is no community building is proposed in our project.
A centralized sewerage system shall be provided which will be connected to the muncipal sewerage.
There is proper garbage collection area for solid waste management.
A well designed rainwater harvesting system shall be provided.
We will use LED lights as well as solar lights in external areas.
Since the building is less than 50 meter in height all the fire norms shall be followed as per NBC and approval of the fire department.
Not Applicable
Staircase will be provided with emergency exit doors in each floor.
Luxurious entrance lobby shall be provided.
Showing 2 blocks with 30 units
Total Carpet Area
7793.10 m²
83884.15 ft²
Total Units
120
2 different types
Blocks & Floors
2
10 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
5178.24 m²
55738.06 ft²