OngoingActive

Raj Hans Residency (Phase-1)

Gautam Buddha Nagar, Uttar Pradesh
31-12-2013
Launch Date
Ongoing
Type
30-09-2021
Completion Date

Overview

Project Area

1.9768 acres

Launch Date

Invalid Date

Completion Date

30-09-2021

RERA ID

UPRERAPRJ6440

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)8000
Project NameRaj Hans Residency (Phase-1)
Registration Fee (in Rs.)45000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)93
DistrictGautam Buddha Nagar
Original Start Date31-12-2013
TehsilGautam Buddha Nagar
Proposed Start Date31-12-2013
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)16285
Proposed Completion Date30-09-2021

Location

Latitude

283330

Longitude

772758

Bank Details

Account no.03691010000270
Name Of Account Holderraj hans infratech Pvt. Ltd.
Bank NameOriental BANK OF commerce
Branch Address43-sco bashant vihar New DELHI-57
Branch Name43-sco bashant vihar New DELHI-57
IFSC Codeorbc0100407

Development Works

Demarcation of Plots

Total Plot Area-20034.80 sq.mtrs.(Area to be developed in this phase is 8000 sq.mtrs.) Total 10 Towers are to be constructed-4 in Phase -1 & 6 in Phase -2. Total Green Area and Gross coverage is devided on pro rata basis ie 8000:12000. Green Area for Phase-1 is worked out as 5925.00 sq.mtrs. 6 mtr.wide internal & Fire Tender movement road. Road leading to Project is 24 meters. Total trees in side the project in Phase-1 are 64.

Boundary Wall

Yes, Masonary Pucca and Railing Boundary wall.

Road Work

Yes, RCC Trimix Road with Kerb Stone on side. Stone Paving infront of Towers.

Footpaths

Yes,Cement Concrete , stone and Grass Pavers

Water Supply Including Drinking Water Facilities

Yes, Authority water supply system collected in Under Ground Water reservoirs at two locations . Terrace Tanks, filled with Hydro Pneumatic pumps.

Sewer System

Yes, RCC hume pipe with Manhole ,Chambers and Collection chamber and connections with Authority sewer System.

Drain

Yes, AC Drain Water line will be use on project.

Parks

Yes, Beautiful landscape with civil work with masonary and stone, horticulture work and various types of plantation, shrubs.

Tree Planting

Yes, Tree planting all along road in the project.

Design For Electric Supply Including Street Lighting

As per approved layout plan

Community Buildings

As per approved layout plan

Treatment and Disposal System of Sewage and Sullage water

S.T.P. and through Authority Sewerage System

Solid Waste Management And Disposal System

Yes, Organic Waste Convertor, Collection Bins and Segregation Table.

Water Conservation System

As per approved layout plan

Energy Management System Including Use of Renewable Energy

As per approved layout plan

Fire Protection And Fire Safety System

Diesel Pump- 1 no. 2850 Ipm and 180 Ipm head Electrical Pump for Hydrant -1 no. 2850 Ipm and 180 m head

Social Infrastructure And Other Public Amenities Including Public Health Services

Proper Water supply and Sanitary facilities on Ground Floor of every Tower

Emergency Evacuation Services

Yes, Refuse Area provided at Every Towers in addition to Main and Fire Staircase

Other Miscellaneous Work

Yes, Guard Room, Entrance and exit gates maintenance room, commercial facilities.

Documents

Lease Deed

No: Lease Deed no. 8610 | Date: 27-05-2011

Lease Deed

No: 16269 | Date: 01-07-2013

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 30-01-2019

Commencement Certificate

Uploaded: 30-01-2019

Other Plan(If Any)

Uploaded: 21-06-2019

Proforma of Application Form

Uploaded: 30-01-2019

Proforma of Allotment Letter

Uploaded: 30-01-2019

Waste Disposal Plan

Uploaded: 30-01-2019

Water Supply Plan

Uploaded: 30-01-2019

Electricity Supply Plan

Uploaded: 30-01-2019

Development Work Plan

Uploaded: 30-01-2019

Affidavit

Uploaded: 30-01-2019

CA CERTIFICATE

Uploaded: 21-05-2021

ARCHITECT CERTIFICATE

Uploaded: 21-05-2021

ENGINEERS CERTIFICATE

Uploaded: 21-05-2021

Authentic copy of Approval of Project

Uploaded: 31-07-2017

Authentic copy of Approval of Project

Uploaded: 31-07-2017

Authentic copy of Approval of Project

Uploaded: 31-07-2017

Authentic copy of Approval of Project

Uploaded: 31-07-2017

Authentic copy of Approval of Project

Uploaded: 31-07-2017

Authentic copy of Approval of Project

Uploaded: 31-07-2017

Authentic copy of Approval of Project

Uploaded: 31-07-2017

Authentic copy of Approval of Project

Uploaded: 31-07-2017

Authentic copy of Approval of Project

Uploaded: 31-07-2017

Registry Document In Case of Own Land

Uploaded: 31-07-2017

Registry Document In Case of Own Land

Uploaded: 31-07-2017

Registry Document In Case of Own Land

Uploaded: 31-07-2017

Floor plans of all types

Uploaded: 31-07-2017

Permits

Orignal Permit NoPLG/BP-3183/44/8357
Orignal Permit Date31-12-2013
Valid Upto30-12-2018
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto30-12-2023
End Date30-12-2020
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit NoPLG/BP-3183/44/8357
Orignal Permit Date31-12-2013
Valid Upto30-12-2018
Revalidated Permit NoPLG/BP-3183/44/8357
Revalidated Permit Date31-12-2013
Revalidated Permit Valid Upto28-08-2023
Permit Extendable Upto28-08-2026
End Date30-12-2020
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit NoPLG/BP-3183/44/8357
Orignal Permit Date31-12-2013
Valid Upto30-12-2018
Revalidated Permit NoPLG/BP-3183/44/8357
Revalidated Permit Date31-12-2013
Revalidated Permit Valid Upto28-08-2023
Permit Extendable Upto28-08-2026
End Date30-12-2020
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Kvs Construction
Contractor Address3-B, brij puri Ext. PARWANA ROAD
Architect NameChander Mohan
Architect AddressW-139, Greater Kailash Part-1, New Delhi-110048
Architect Licence NumberCA/86/9680
Structural Engineer NameSkeleton Consultants Pvt.Ltd.
Structural Engineer AddressA-75, Lind.Floor, Sector-5, Noida-201301
Mobile number(Project Co-ordinator)9811032286

Land Details

AFS

Showing 5 blocks with 162 units

Property Summary

Total Carpet Area

47257.64 m²

508676.51 ft²

Total Units

374

3 different types

Blocks & Floors

5

22 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:126.36 m²
Balconies:493
Parking ratio:0.00 per unit

Block G

38 units

Block H

38 units

Block I

43 units

Block J

19 units

Block Commercial

24 units

Khasra Details

Total Area

20034.80 m²

215652.58 ft²

2 plots
Plot
TypePlot
Khasra/Plot NoGH- 6B
Area(In Sq. Mt.)17728.40
Plot
TypePlot
Khasra/Plot NoGH- 6B
Area(In Sq. Mt.)2306.40

Other Details

Contractor Name (if any)Kvs Construction
Contractor Address3-B, brij puri Ext. PARWANA ROAD
Architect NameChander Mohan
Architect AddressW-139, Greater Kailash Part-1, New Delhi-110048
Architect Licence NumberCA/86/9680
Structural Engineer NameSkeleton Consultants Pvt.Ltd.
Structural Engineer AddressA-75, Lind.Floor, Sector-5, Noida-201301
Mobile number(Project Co-ordinator)9811032286