25'25'9.6483""
81'45'27.8290""
Through Brickwork
Rcc Structure With Brick and or Railing
RCC Roads would be provided
Not Applicable
By Providing Tubewell for filling overhead tanks which will be supplying to respective units.
RCC HUME PIPE/SWR and STP
Brick Masonry Drain
As per Sanctioned Plan Attached
IT WILL BE DONE ACCORDING TO PDA NORMS AND REQUIREMENTS
AS PER PLAN ATTACHED
NOT APPLICABLE
TREATMENT THROUGH STP AND DISPOSAL THROUGH USE FOR GARDENING AND FOR FLUSHING IN TOILETS
YES AS PER PLAN ATTACHED
AS PER SPECIFICATIONS OF STATE GOVERNMENT BY CREATING RAIN WATER HARVESTING SYSTEM
25 PERCENT OF ROOF TOP WILL BE USED FOR INSTALLING SOLAR PANEL FOR GENERATING POWER FOR COMMON AREAS
YES AS PER NORMS OF UP FIRE DEPARTMENT
WILL BE PROVIDED AS PER NORMS OF PDA IF APPLICABLE TO PROJECT
EMERGENCY EVACUATION WOULD BE PROVIDED AS PER PDA NORMS
AS PER PMAY 2018-21 POLICY
Total Area
8666.51 m²
93285.45 ft²