Project Area
Launch Date
Completion Date
RERA ID
26.49931
81.0131
We have one plot of size 4991.85 sq. mtr.having 1 main entrance gate from the 30 m wide front road.
2 m high and 230 mm thick Brick work and rcc work in column and beam. At the center face of boundary wall there would be a Logo of the project which give a beautiful iconic design to boundary wall.
From the main entrance gate we have 80 mm thick interlocking brick /RCC road through out the project. Whose wideness starts from 10 mtr.
We would not provide any footpath
We will provide Two nos. of pump including standby arrangement for the requirement of blocks through underground pipelines and in shaft.
Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.when come into force.
Storm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.
We will provide green area with the different activities and the green area will have gaming facilities for kids.
We will providemany type of trees all along the boundary wall & green area
We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and 100% DG backup for common service like External lighting, Fountain, STP, Pump room etc.along with 50% DG backup for individual dwelling units. Electrical design will be safe with provision of earthing and lighting protection system.
Community Facilities are providing at Ground floor level.
Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force.
There are a proper garbage collection area provided for the solid waste management and compost plant for bio-degradable waste.
We will suggest to individual to use low flow fixtures as well dual flush cistern and rain water harvesting system to reduce the water & irrigation consumption and improve the ground water level.Flushing water demand shall be fulfill by STP Treated water.
We will use LED lights fitting in all areas, stand alone solar lights will be used in electrical lightning as far as possible. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.
This project is falls under residential project high rise building. Firefighting facility i.e. sprinkler, hydrant, extinguisher, fire suppression system etc. shall be provided by NBC-2016 & IS-15105: 2021.
NA
We will have staircases which will be provided with emergency exit doors and emergency exit gates with exit signages.
NA
Showing 1 blocks with 41 units
Total Carpet Area
16522.40 m²
177845.46 ft²
Total Units
38
2 different types
Blocks & Floors
1
41 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
4991.85 m²
53731.77 ft²