28.624281
77.436244
EAST SIDE - 73.86M, WEST SIDE - 68.05M, NORTH SIDE - 43.80M, SOUTH SIDE - 30.6M
RCC COLUMN AND BEAM STR. WITH BRICK WORK MS RAILING (150 MM RCC OR 230 MM BRICK WORK)
CEMENT CONCRETE/ CONCRETE PAVERS WITH AVERAGE THICKNESS OF 100MM
CEMENT CONCRETE/ANY OTHER MATERIAL/ CONCRETE PAVERS WITH 60 - 80 MM THICKNESS
UNDERGROUND AND OVERHEAD WATER TANKS ARE PROVIDED AND CONNECTION TO EACH AND EVERY TOILET AND KITCHEN
WELL - LAID INTERCONNECTED SEWER LINES WILL BE PROVIDED WHICH ARE FURTHER CONNECTED TO THE SEWER LINE LAID BY THE CROSSING REPUBLIK FURTHER TREATMENT IN THE STP LOCATED IN CROSSING REPUBLIK GHAZIABAD
DRAINAGE SYSTEM WILL BE PROVIDED ON THE BASIS OF COMPLIANCE OF NBC WITH CALCULATION OF DISCHARGE
NA
TREE PLANTATIONS WITH EVERGREEN AND SEASONAL CATEGORY
ELECTRICAL SUPPLY SYSTEM WILL BE PROVIDED ACCORDING TO THE ELECTRICAL LOAD CALCULATION ON THE DATA PROVIDED BY THE SUB METERING SYSTEM WHERE THE CONNECTION SHOULD BE PROVIDED BY THE COMPANY TO THE FLAT OWNER AT THE TIME OF COMPLETION.
NA
SEWAGE AND SULLAGE SHALL BE DISCHARGED TO THE STP PROVIDED BY CROSSING REPUBLIK IN CROSSING REPUBLIK
CROSSING REPUBLIC WILL PROVIDE THE MANAGEMENT AND WASTE DISPOSAL
LOW FLOW WATER FIXTURE ARE USED AND RAIN WATER HARVESTING
NA
FIRE FIGHTING SYSTEM AND PROTECTION SYSTEM WILL BE PROVIDED AS PER NBC AND NOC FROM UP FIRE SERVICE. INSTALLATION OF SPRINKLES SHALL BE DONE IN BASEMENTS ONLY.
NA
FIRE TENDER ROAD AND FIRE ESCAPE STAIRCASE WILL BE PROVIDED
NA
Showing 2 blocks with 28 units
Total Area
7752.36 m²
83445.63 ft²
Total Units
84
1 different types
Blocks & Floors
2
14 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
2850.00 m²
30677.11 ft²