NewActive

PMAY Sector I Basantkunj, Part D

Lucknow, Uttar Pradesh
01-01-2022
Launch Date
New
Type
20-08-2026
Completion Date

Overview

Project Area

3.5894 acres

Launch Date

01-01-2022

Completion Date

20-08-2026

RERA ID

UPRERAPRJ360874

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)14526
Project NamePMAY Sector I Basantkunj, Part D
Registration Fee (in Rs.)78000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)56
DistrictLucknow
Original Start Date-
TehsilLucknow
Proposed Start Date01-01-2022
Sanctioning Competent AuthorityLucknow Development Authority
Project Cost (in Lacs)5000
Proposed Completion Date20-08-2026

Location

Latitude

26.893250

Longitude

80.870694

Bank Details

Account Details
Name of the AccountSECRETARY LDA LKO PMAY SEC I PART D
Account Number50100148826552
Bank NameHDFC BANK LTD
Branch NameLUCKNOW-ALIGANJ
Branch AddressA-1/21, SECTOR -B, Opp. NEHRU BAL VATIKA, ALIGANJ LUCKNOW-226024
IFSC CodeHDFC0000412
Branch DistrictLucknow
Separate Account Details
Name of the AccountSECRETARY LDA LKO PMAY SEC I PART D
Account Number50100148826246
Bank NameHDFC BANK LTD.
Branch NameLUCKNOW-ALIGANJ
Branch AddressA-1/21, SECTOR-B, Opp. Nehru Bal Vatika, Aliganj, Lucknow-226024
IFSC CodeHDFC0000412
Branch DistrictLucknow
Transaction Account Details
Name of the AccountSECRETARY LDA LKO PMAY BASANT KUNJ SEC I
Account Number50100477267380
Bank NameHDFC BANK LTD.
Branch NameLUCKNOW-ALIGANJ
Branch AddressA-1/21, SECTOR-B Opp. NEHRU BAL VATIKA, ALIGANJ, LUCKNOW
IFSC CodeHDFC0000412
Branch DistrictLucknow

Development Works

Demarcation of Plots

Not Applicable.

Boundary Wall

There is no boundary wall is propose for the project.

Road Work

Road of width 9.0 Or more has to be constructed with base concrete having way width 3.75m. Space between drain and both edges of toad will remain kachcha and flower-trees like Amaltash or Kusum will be planted on one side of road. Roads having width less than 9.0 m (I.e. 6.0 m and 7.50 m ) has to be constructed with base concrete having 3.50 m wide carriage way. Space between drain and both edges of road will remain kachcha. Road having width less than 4.50 m has to be constructed with 80 mm thick rubber molded tile with concrete base. CC roads of scheme have to be constructed with Ready Mix Concrete as per provisions of IRC-SP-62-2014. The passage between building block and road will be made with 80 mm thick rubber moulded tile with base of concrete.

Footpaths

Interlocking paver block is proposed for footpaths.

Water Supply Including Drinking Water Facilities

All water supply line from out let of pump house has to be laid of HDPE pipe of required size as per design.

Sewer System

Has to be laid as per the design and standards with DWC-HDPE pipe.

Drain

Drain system also will be constructed as per sanctioned plan and site requirements.

Parks

The parks boundary will be made with grill-wall with RCC Column upto 90cm height from ground level and RCC plinth level will remain 45cm maximum. No path-way or jogging track will be made within park and only grass will be planted. 80 mm thick interlocking tile with sand base has to laid round the building blocks. Parking space for each house has to be provided as per building-bye-laws, with 8- mm thick interlocking paver blocks with concrete base. All works has to carried out with required specification of PMAY-(U) Guidelines, UPPWD, Building Bylaws and NBC Guidelines.

Tree Planting

Not Applicable.

Design For Electric Supply Including Street Lighting

For residential blocks, work, work as per the design. Electrification work includes connection from LT line to meter panel in staircase of building block and from meter panel through MCB and bus bar to each house has to be done.

Community Buildings

Not Applicable.

Treatment and Disposal System of Sewage and Sullage water

Sewage will be disposed in STP in Basantkunj Youjna.

Solid Waste Management And Disposal System

After completion of the project infrastructure It will be handed over to the local municipal corporation for solid waste management and disposal system

Water Conservation System

Rain water Harvesting is proposed for water conservation system.

Energy Management System Including Use of Renewable Energy

Not Applicable.

Fire Protection And Fire Safety System

As per Fire Department and NBFC norms the building is less than 30m of the heights so fire protection and fire safety works is not applicable for the project.

Social Infrastructure And Other Public Amenities Including Public Health Services

Not Applicable

Emergency Evacuation Services

Not Applicable

Other Miscellaneous Work

Not Applicable.

Documents

Extract of Khatauni

No: 0 | Date: -

Extract of Khatauni

No: 1428-1433 | Date: -

Extract of Khatauni

No: 1425-1430 | Date: -

Details of Encumbrances

Commencement Certificate

Other Plan(If Any)

Details of Encumbrances

Uploaded: 24-11-2021

Commencement Certificate

Uploaded: 30-12-2021

Other Plan(If Any)

Uploaded: 29-12-2021

Proforma of Application Form

Uploaded: 23-11-2021

Proforma of Allotment Letter

Uploaded: 23-11-2021

Proforma of Conveyance Deed

Uploaded: 23-11-2021

Proforma of Completion Certificate(Occupancy)

Uploaded: 23-11-2021

Waste Disposal Plan

Uploaded: 30-12-2021

Water Supply Plan

Uploaded: 30-12-2021

Electricity Supply Plan

Uploaded: 30-12-2021

Development Work Plan

Uploaded: 29-12-2021

Affidavit

Uploaded: 26-12-2021

CA CERTIFICATE

Uploaded: 23-11-2021

ARCHITECT CERTIFICATE

Uploaded: 30-12-2021

ENGINEERS CERTIFICATE

Uploaded: 23-11-2021

Permits

Orignal Permit NoFile No. 821/Dated-21-08-2021
Orignal Permit Date21-08-2021
Valid Upto20-08-2026
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto20-08-2029
End Date20-08-2026
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Lucknow Development Authority
Contractor AddressPradhikaran Bhawan Vipinkhand, Gomtinagar Lucknow
Architect NameChief Town Planer LDA Shri Nitin Mittal
Architect AddressPradhikaran Bhawan vipinkhand, Gomtinagar Lucknow
Architect Licence NumberLDA
Structural Engineer NamePratap Shankar Mishra Executive Engineer
Structural Engineer AddressPradhikaran Bhawan Vipinkhand Gomtinagar Lucknow.
Mobile number(Project Co-ordinator)9918001644

Land Details

AFS

Showing 16 blocks with 65 units

Property Summary

Total Carpet Area

19281.72

207546.51 ft²

Total Units

780

1 different types

Blocks & Floors

16

4 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:24.72
Balconies:65
Parking ratio:0.00 per unit

Block Block 42

4 units

Block Block 43

4 units

Block Block 48

4 units

Block Block 49

4 units

Block Block 50

4 units

Block Block 51

4 units

Block Block 52

4 units

Block Block 53

4 units

Block Block 54

4 units

Block Block 55

4 units

Block Block 56

4 units

Block Block 57

4 units

Block Block 61

5 units

Block Block 63

4 units

Block Block 64

4 units

Block Block 65

4 units

Khasra Details

Total Area

14525.74

156353.61 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No165, 529,530,531,532, 533, 534, 535
Area(In Sq. Mt.)14525.74

Other Details

Contractor Name (if any)Lucknow Development Authority
Contractor AddressPradhikaran Bhawan Vipinkhand, Gomtinagar Lucknow
Architect NameChief Town Planer LDA Shri Nitin Mittal
Architect AddressPradhikaran Bhawan vipinkhand, Gomtinagar Lucknow
Architect Licence NumberLDA
Structural Engineer NamePratap Shankar Mishra Executive Engineer
Structural Engineer AddressPradhikaran Bhawan Vipinkhand Gomtinagar Lucknow.
Mobile number(Project Co-ordinator)9918001644