Project Area
Launch Date
Completion Date
RERA ID
26.894222
80.872806
Not Applicable
There is no boundary wall is proposed for the project
Roads of width 9.0 or more has to be constructed with base concrete having carriage way width 3.75m. Space between drain and both eadges of road will remain kachcha and flower-trees like amaltash or kusum will be planted on one side of road. Roads having width less than 9.0 m( i.e 6. 0m and 7.50m) has to be constructed with base concrete having 3.50 m wide carriage way. Space between drain and both eadges of road will remain kachcha. Road having width less than 4.50 m has to be constructed with 80 mm thick rubber molded tile with concrete base. CC roads of scheme have to be constructed with Ready Mix Concrete as per provisions of IRC: SP: 62 – 2014. The passage between building block and road will be made with 80 mm thick rubber moulded tile with base of concrete.
Interlocking paver block is proposed for footpaths.
All water supply line from out let of pump house has to be laid of HDPE pipe of required size as per design.
has to be laid as per the design and standards with DWC-HDPE pipe.
Drain system also will be constructed as per sanctioned plan and site requirements.
the parks boundary will be made with grill-wall with RCC Column upto 90cm height from ground level. And RCC plinth level will remain 45 cm maximum. No path-way or jogging track will be made within park and only grass will be planted. 80 mm thick interlocking tile with sand base has to laid round the building blocks between the building blocks. Parking space for each house has to be provided as per building-bye-laws, with 80mm thick interlocking paver blocks with concrete base. All work has to carried out with required specifications of PMAY-(U) Guidelines, UPPWD, Building Bylaws and NBC Guidelines.
Not Applicable.
for residential blocks, work as per the design. Electrification work includes connection fron LT line to meter panel in staircase of building block and from meter panel through MCB and bus bar to each house has to be done.
Not Applicable.
Sewage will be dispose in STP in Basantkunj Youjna
After completion of the project infrastructure will be handed over to the local municipal corporation.
Rain Water Harvesting is proposed for water conservation system.
Not Applicable.
As per Fire department and NBFC norms the houses is less than 30m of the heights so fire protection and fire safety works is not applicable for the project
Not Applicable.
Not Applicable.
Not Applicable.
Showing 15 blocks with 60 units
Total Carpet Area
17800.92 m²
191607.32 ft²
Total Units
720
1 different types
Blocks & Floors
15
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
15982.00 m²
172028.65 ft²