Project Area
Launch Date
Completion Date
RERA ID
26.894361
80.873083
Not Applicable
There is no boundary wall is proposed for the project
Road will be constructed as per approved map, 6mt. wide PQC/ CC road and 3mt. interlocking Road is proposed as per IRC and IS code.
Interlocking paver block is proposed for Footpaths.
Water will be supplied by overhead water tank through 15/20/25 MM dia ,HDPE Pipe with all required fittings ISI mark
Underground Sewer will be constructed which will be dispose sewage in STP. Main sewer line dia is 600mm and connecting sewer to main sewer dia is 250 mm.
Drain system will be also constructed as per sanction plan and site requirements.
The parks will be constructed as per relevant GO.
Not Applicable
Electricity will be supply through HT, LT line and transformer from LIGHT points, fanpoints with regulator,6amp plug point 15 amp power plugs.
Not applicable
Sewage will be disposed in STP, Basantkunj Yojna.
After completion of the project infrastructure will be handed over to the local municipal corporation.
Rain Water Harvesting is proposed for water conservation system.
Not. Applicable.
As per Fire department and NBFC norms the houses is less than 30 m of the heights so fire protection and fire safety work is not applicable for the project
Not Applicable
Not Applicable
Not Applicable
Showing 15 blocks with 60 units
Total Carpet Area
17803.44 m²
191634.45 ft²
Total Units
720
1 different types
Blocks & Floors
15
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
15984.00 m²
172050.18 ft²