25.382602838489387
82.89051675670673
AS PER APPROVED DESIGN IN DPR
AS PER APPROVED DESIGN IN DPR
AS PER APPROVED DESIGN IN DPR
AS PER APPROVED DESIGN IN DPR
AS PER PRESCRIBED NORMS WITH ADEQUATE PROVISION FOR TREATMENT,STORAGE DISTRIBUTION NETWORK. THE NORMS LAID DOWN BY GOI FOR PROVIDING POTABLE WATER SUPPLY SHALL BE ENSURED
THE PROPOSED SEWER SYSTEM SHALL BE DESIGNED FOR MAXIMUM DISCHARGE TO CATER THE REQUIREMENT ON THE ULTIMATE DEVELOPMENT OF PROJECT. SEWAGE TREATMENT PLANT SHALL BE PROPOSED FOR THE TREATMENT OF SEWAGE.
DRAINAGE SYSTEM COMPRISE OF INTERNAL DRAINAGE SYSTEM ULTIMATE DISPOSAL .
PROVIDED AS PER LOCAL BUILDING BY LAWS
PROVIDED AS PER LOCAL BUILDING BY LAWS
AS PER APPROVED DESIGN IN DPR
NOT APPLICABLE
TREATED WATER TO BE USED FOR HORTICULTURE AND WASTE TO BE CONVERTED INTO UREA
AS PER APPROVED DESIGN IN DPR
ADEQUATE NUMBER OF RWH PITS HAS BEEN PROVIDED
SOLAR PENALS AND LED LIGHTS SHALL EXTENSIVLY USED
PROVIDED AS PER NBC NORMS
AS PER APPROVED DESIGN IN DPR
PROVIDED
AS PER APPROVED DESIGN IN DPR
Showing 6 blocks with 25 units
Total Area
16865.92 m²
181543.08 ft²
Total Units
608
1 different types
Blocks & Floors
6
5 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
29630.00 m²
318934.36 ft²