NewActive

Pinnacle GH-13

Lucknow, Uttar Pradesh
31-12-2028Completion
NewType
LucknowDistrict
26497 LCost

Basic Details

Project Type:New
Project Category:Residential
Total area in round figure (Sq.mt.):16196
Project Name:Pinnacle GH-13
Registration Fee (in Rs.):86000
Address:325 Part, 326 Part, 328 Part, 348 Part, 349 Part, 350 Part, 351 Part, 352 Part, 353 Part, 354 Part, 355 Part, Village Baghamau
Village/Locality/Sector etc.:Baghamau
State:Uttar Pradesh
Project Duration (In month):60
District:Lucknow
Original Start Date:-
Tehsil:Lucknow
Proposed Start Date:15-01-2024
Sanctioning Competent Authority:Lucknow Development Authority
Project Cost (in Lacs):26497
Proposed Completion Date:31-12-2028

Location

Latitude

26.824834

Longitude

81.022285

Bank Details

Account Details
Name of the Account:ANS DPL COL AC PINNACLE GH-13
Account Number:42417395776
Bank Name:State Bank of India
Branch Name:Commercial Branch Lucknow
Branch Address:6A, Way Road, Gokhle Marg, Lucknow
Branch State:Uttar Pradesh
Branch District:Lucknow
IFSC Code:SBIN0004166
Branch Email Address:sbi.04166@sbi.co.in
Separate Account Details
Name of the Account:ANS DPL SEP AC PINNACLE GH-13
Account Number:42417396688
Bank Name:State Bank of India
Branch Name:Commercial Branch, Lucknow
Branch Address:6A, Way Road, Gokhle Marg, Lucknow
Branch State:Uttar Pradesh
Branch District:Lucknow
IFSC Code:SBIN0004166
Transaction Account Details
Name of the Account:ANS DPL TRANSACTION AC PINNACLE GH-13
Account Number:42417396779
Bank Name:State Bank of India
Branch Name:Commercial Branch, Lucknow
Branch Address:6A, Way Road, Gokhle Marg, Lucknow
Branch State:Uttar Pradesh
Branch District:Lucknow
IFSC Code:SBIN0004166

Development Works

Demarcation of Plots

As per approved sanction plan.This is single plot Polygon shaped , having total 1 no. of entry gate and 1no. of exit gate from the 24 mtr wide front road and 24 mtr internal road. Site is surronded by 45 mtr road along with green from North & East Sides and from West side with developers plot.

Boundary Wall

1.8 - 2.1m high and 200 mm thick Boundary wall designed or with MS Railing as per approved design. Brick Work of 9inches and rcc work in column and beam may be used as per design. Entrance and exit gates may of of MS Steel steel structure as per approved design are developed with boundary.

Road Work

Trimix / asphalt road will be used as per deisgn suggested by the Architect for internal road.

Footpaths

All internal roads will have narrow footpath with tiles pavers or equivalent finishes as per landscape design.

Water Supply Including Drinking Water Facilities

All apartments shall be provided with domestic water for household activities and STP treated water for flushing. Ground water may also be used and user can have their individual RO system as per their requirement.The STP treated water shall also be supplied for irrigation purposes. For the same water tanks are getting created in underground and on terrace. Separate tanks are provided for fire water.

Sewer System

Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for treatement. after treatement ,water shall be recycled and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system.

Drain

Storm water system shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain line.

Parks

There is a significant green area beside building including green parks, play areas for childrens and different recretional activities.

Tree Planting

The trees of category ornamental ,shady and native species shall be planted in the entire project as per the species recommende in the landscape in order to maintatin greenary and natural view.

Design For Electric Supply Including Street Lighting

We have designed the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting with timer control,Pump room etc.

Community Buildings

Fully centralised AC Club House/community center is proposed in the towers, swimming pool and some temporary kiosks on the central atrium with sitting area of each building. Club comprises multiple facility indoor playing areas etc.

Treatment and Disposal System of Sewage and Sullage water

Centralized Sewerage system for entire project and all towers shall be connected to STP . All Sewerage water shall go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system.

Solid Waste Management And Disposal System

Project shall have  waste segregation area. The solid waste shall be encouraged for segregation with in all apartments. The dustbins shall be provided for segregated waste in the common areas and other waste shall be handed over to the government vendors for further disposal.

Water Conservation System

A well designed rain water harvesting system shall be provided for the whole building complex to conserve water by ensuring adequate nos. of  recharge pits

Energy Management System Including Use of Renewable Energy

We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. 25 % of Terrace is covered with Solar Voltaic Panels to provide Renewable source of energy for common areas in building complex. Also timer control panels shall be used for efficient energy management.

Fire Protection And Fire Safety System

All Fire norms shall be followed as per NBC code and approval of fire department. fire sprinklers,smoke detectors,FHC with pumps are provided as per norms.

Social Infrastructure And Other Public Amenities Including Public Health Services

The Social infrastructure shall be provided with domestic water supply with tanks,STP treted water for flushing with tanks and irrigation ,storm /rain water drainage system,sewer drainage system,waste water drainage system,firefighting system including sprinklers ,FHC detectors ,fire water tank ,authority main power supply ,DG power backup for essential common supply,lifts.

Emergency Evacuation Services

Fire Staricase is provided in the each building, with fire resistant doors, basements have 1 (one) access and exit in case of emergency. Dedicated assembly areas are also defined in the campus.Adequate signage is also provided.

Other Miscellaneous Work

Not applicable

New Documents

Registry Document

No: 4798 | Date: 09-04-2015

Registry Document

No: 5396 | Date: 18-04-2015

Sale Deed

No: 8785 | Date: 06-07-2011

Sale Deed

No: 7344 | Date: 08-05-2014

Lease Deed

No: 9652 | Date: 24-06-2015

Extract of Khatauni

No: 1428-1433 | Date: -

Extract of Khatauni

No: 1428-1433 | Date: -

Extract of Khatauni

No: 1428-1433 | Date: -

Extract of Khatauni

No: 1428-1433 | Date: -

Extract of Khatauni

No: 1428-1433 | Date: -

Extract of Khatauni

No: 1428-1433 | Date: -

Extract of Khatauni

No: 1428-1433 | Date: -

Extract of Khatauni

No: 1428-1433 | Date: -

Extract of Khatauni

No: 1428-1433 | Date: -

Extract of Khatauni

No: Land Area Chart | Date: -

Extract of Khatauni

No: AddressProof_Directors | Date: -

Extract of Khatauni

No: 1428-1433 | Date: -

Extract of Khatauni

No: Affidavit | Date: -

Extract of Khatauni

No: Map and Revised Affidavit for Leasehold Land | Date: -

Extract of Khatauni

No: Affidavit | Date: -

Uploaded Documents

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 21-11-2023

Commencement Certificate

Uploaded: 21-11-2023

Proforma of Application Form

Uploaded: 21-11-2023

Proforma of Allotment Letter

Uploaded: 21-11-2023

Proforma of Conveyance Deed

Uploaded: 21-11-2023

Waste Disposal Plan

Uploaded: 21-11-2023

Water Supply Plan

Uploaded: 21-11-2023

Electricity Supply Plan

Uploaded: 21-11-2023

Development Work Plan

Uploaded: 21-11-2023

Affidavit

Uploaded: 02-12-2023

CA CERTIFICATE

Uploaded: 21-11-2023

ARCHITECT CERTIFICATE

Uploaded: 21-11-2023

ENGINEERS CERTIFICATE

Uploaded: 21-11-2023

Other

Uploaded: 21-11-2023

Proforma of Agreement for Sale

Uploaded: 21-11-2023

Permits

Orignal Permit NoGroup Housing/08385/LDA/BP/22-23/4013/05062023
Orignal Permit Date01-09-2023
Valid Upto31-08-2028
Permit Extendable Upto31-08-2031
End Date31-12-2028

Project Team

Contractor Name (if any)Mr. Satinder Sawhney
Contractor Address129-C, Gobind Nagar, Race Course, Dehradun-248001
Architect NameMr. Rudraksha Charan
Architect AddressD-102 Chhatarpur, New Delhi-110074
Architect Licence NumberCA/2011/53000
Structural Engineer NameMr. Pankish Goel
Structural Engineer AddressB-74, Sector-57, Noida-201301
Mobile number(Project Co-ordinator)9236026342

Project Land Details

AFS

Showing 2 blocks with 139 units

Property Summary

Total Area

38544.09

414884.73 ft²

Total Units

135

3 different types

Blocks & Floors

2

37 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:285.51
Balconies:772
Parking ratio:0.00 per unit

Block Tower-1

67 units

Block Tower-2

72 units

Khasra Details

Total Area

34746.00

374002.47 ft²

1 plot
Khasra
Type:Khasra
Khasra/Plot No:325 Part, 326 Part, 328 Part, 348 Part, 349 Part, 350 Part, 351 Part, 352 Part, 353 Part, 354 Part, 355 Part
Area(In Sq. Mt.):34746

Other Details

Contractor Name (if any):Mr. Satinder Sawhney
Contractor Address:129-C, Gobind Nagar, Race Course, Dehradun-248001
Architect Name:Mr. Rudraksha Charan
Architect Address:D-102 Chhatarpur, New Delhi-110074
Architect Licence Number:CA/2011/53000
Structural Engineer Name:Mr. Pankish Goel
Structural Engineer Address:B-74, Sector-57, Noida-201301
Mobile number(Project Co-ordinator):9236026342