26.820604
83.384630
AREA HAS BEEN DEMARCATED
THERE IS NO PROVISION OF BOUNDARY WALL IN THE PROJECT
BITUMINOUS/CEMENT CONCRETE ROADS HAVE BEEN PROVIDED AND CONSTRUCT OVER GSB OR /AND WMM
PROVIDE AS NECESSARY IN APPROVED LAYOUT PLAN. FOOTPATH WILL BE MADE WITH PAVER BLOCKS.
DRINKABLE WATER SHALL BE SUPPLIED THROUGH BORED WELL AND UGT SUPPLIED THROUGH 80, 100 AND 150 MM PIPE LINES
SEWERAGE NETWORK SHALL BE DESIGN AS PER SETUP SEWERAGE COLLECTION WILL BE THROUGH MAN HOLE AND LINE WILL BE LAID 150 MM AND 200 MM AND TO BE DISPOSED IN PROPOSED STP
DRAINS AS PER DESIGN SHALL BE CONSTRUCTED. INTERNAL DRAINS WILL BE RCC 450/450 MM AND 600/600 MM INTERNAL SIZE
PARKS SHALL BE DEVELOPED IN THE SCHEME. AS PER DESIGN
TREES SHALL BE PLANTED WITHIN OPEN SPACES AND PARKS
ELECTRICAL LOAD AS PER SANCTIONED UPPCL DRAWING SHALL BE PROVIDED
N/A
SEWERAGE COLLECTION WILL BE THROUGH MAN HOLE AND LINE WILL BE LAID 150 MM AND 200 MM AND TO BE DISPOSED IN PROPOSED STP
GARBAGE COLLECTION CENTER HAVE BEEN PROVIDED IN THE SCHEME
N/A
N/A
AS NECESSARY (TAKEN)
N/A
N/A
OTHER MISCELLANEOUS WORK WILL BE PROPOSED AS PER REQUIREMENT OF THE SCHEME
Showing 15 blocks with 60 units
Total Area
13068.00 m²
140662.65 ft²
Total Units
240
1 different types
Blocks & Floors
15
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
20473.14 m²
220370.83 ft²