Park Square

Lucknow, Uttar Pradesh
22-10-2019
Launch Date
New
Type
30-06-2024
Completion Date

Overview

Project Area

0.7077 acres

Launch Date

Invalid Date

Completion Date

30-06-2024

RERA ID

UPRERAPRJ451261

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)2864
Project NamePark Square
Registration Fee (in Rs.)19500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)57
DistrictLucknow
Original Start Date-
TehsilLucknow
Proposed Start Date22-10-2019
Sanctioning Competent AuthorityLucknow Development Authority
Project Cost (in Lacs)1246
Proposed Completion Date30-06-2024

Location

Latitude

26.895107

Longitude

26.895107

Bank Details

Account no.201002895384
Name Of Account HolderMJ LIFESPACES LLP
Bank NameINDUSAND BANK
Branch AddressMunshipuliya Branch
Branch NameMUNSHIPULIYA BRANCH
IFSC CodeINDB0000750

Development Works

Demarcation of Plots

FOUNDATION WORK IS UNDER PROCESS

Boundary Wall

BOUNDARY WALL IS ALREADY THERE IN THE PREMISES.

Road Work

Internal roads will be of approx. 20ft. width.

Footpaths

There will be no footpaths.

Water Supply Including Drinking Water Facilities

Proper water supply facility is provided through internal boring. The project is registered with jal kal vibhaag.

Sewer System

Proper sewer system facility is provided through septic tank.

Drain

Proper drain facility is provided through septic tank.

Parks

No Parks faclility is available.

Tree Planting

Lawns and Planting will be done.

Design For Electric Supply Including Street Lighting

Electricity will be supplied through Transformer with capicity of 252 KW and same has been sanctioned by Madhyanchal Vidyut Vitran Nigam Ltd.

Community Buildings

There no provision for the community building in the project.

Treatment and Disposal System of Sewage and Sullage water

There is no facility for the Treatment and Disposal System of Sewage and Sullage water.

Solid Waste Management And Disposal System

There is no facility for the Solid Waste Management And Disposal System

Water Conservation System

For water conservation water recharge pits will be made as per layout plan.

Energy Management System Including Use of Renewable Energy

There is no facility for the Energy Management System Including Use of Renewable Energy

Fire Protection And Fire Safety System

various measures have taken for fire safety system like- 1. 6"/4" Dia suction deliver connection 2. Electric Pump 900 LPM 3. Disel Pump Cap 900 LPM 4. Electric Jocky Pump 180 LPM 5. Under ground and terrace tank for fire fighting 6. Fire extinguisher 7. Auto sprinkler

Social Infrastructure And Other Public Amenities Including Public Health Services

Mini Bsketball Court and toddler swimming pool.

Emergency Evacuation Services

For Emergency Evacuation service separate stair will be provided.

Other Miscellaneous Work

Other Miscellaneous work will be done as per need of the project.

Documents

Registry Document

No: 201900821019170 | Date: 15-03-2019

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 14-11-2019

Commencement Certificate

Uploaded: 13-11-2019

Other Plan(If Any)

Uploaded: 14-12-2019

Proforma of Application Form

Uploaded: 20-11-2019

Proforma of Allotment Letter

Uploaded: 20-11-2019

Proforma of Conveyance Deed

Uploaded: 20-11-2019

Waste Disposal Plan

Uploaded: 20-11-2019

Water Supply Plan

Uploaded: 30-11-2019

Electricity Supply Plan

Uploaded: 30-11-2019

Development Work Plan

Uploaded: 20-11-2019

Affidavit

Uploaded: 14-12-2019

CA CERTIFICATE

Uploaded: 20-11-2019

ARCHITECT CERTIFICATE

Uploaded: 20-11-2019

ENGINEERS CERTIFICATE

Uploaded: 20-11-2019

Permits

Orignal Permit NoMAP-20181008184958653
Orignal Permit Date22-10-2019
Valid Upto10-01-2024
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto10-01-2026
End Date31-12-2023
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Anwarul Haque
Contractor AddressB130, Sec C, Mahanagar Lucknow
Architect NamePragesh Khanna
Architect AddressVastu Srajan, Omaxe Heights, Gomtinagar, Lucknow
Architect Licence NumberCA/2004/34072
Structural Engineer NamePankaj Srivastava
Structural Engineer AddressAnpee Tech Engineers, 3rd Floor, Shriram Tower, Hazratganj, Lucknow
Mobile number(Project Co-ordinator)7236921488

Land Details

AFS

Showing 1 blocks with 12 units

Property Summary

Total Carpet Area

3740.58

40263.23 ft²

Total Units

42

4 different types

Blocks & Floors

1

6 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:89.06
Balconies:52
Parking ratio:0.00 per unit

Block Park Square

12 units

Khasra Details

Total Area

2864.00

30827.81 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No420
Area(In Sq. Mt.)2864

Other Details

Contractor Name (if any)Anwarul Haque
Contractor AddressB130, Sec C, Mahanagar Lucknow
Architect NamePragesh Khanna
Architect AddressVastu Srajan, Omaxe Heights, Gomtinagar, Lucknow
Architect Licence NumberCA/2004/34072
Structural Engineer NamePankaj Srivastava
Structural Engineer AddressAnpee Tech Engineers, 3rd Floor, Shriram Tower, Hazratganj, Lucknow
Mobile number(Project Co-ordinator)7236921488