Plot is already well demarcated and the construction of proposed project already started.
Brick made boundary wall combination of RCC is proposed around the project.
Concrete road wit bituminous cover with high quality concrete pavers.
Footpath will bi buile through inter-locking tiles.
Overhead water tanks shall be provided on the building terrace for distribution through gravity.
A centralized sewerage system shall be provided which will be connected to the municipal sewerage.
The storm water system shall be provided which will connected to the municipal drain line.
Not Applicable.
There are several provisions for tree planting as per approved area of the whole project.
We have designed the system as per Local Electricity Bard and consider Centralized transformer, HT panel, LT panel, Feeder Pillar and DG backup for common services like external lighting
There is no community buildings in our project.
A centralized sewerage system shall be provided which be connected to the municipal sewerage system.
There is proper garbage collection are for solid waste management.
A well designed rainwater harvesting system shall be provided.
We will use LED lights as well as solar lights in external areas.
All the fire norm shall be followed as per NBC and approval of the fire department.
N. A.
The staircase will be provided with emergency exit doors in each Tower/ Blocks.
N.A.
Showing 1 blocks with 26 units
Total Area
7091.73 m²
76334.67 ft²
Total Units
48
3 different types
Blocks & Floors
1
10 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
6038.65 m²
64999.39 ft²