28.586880
77.337158
By fixing co-ordinate point with all dimensions and tangents as per given approved drawings.
Brick work wall upto 1.2 mt. high with M.S grill above .
R.C.C Road Finishing (trimix) 6.0 m wide has been Provided.
1.5 m wide path with interlocking tiles finishing has been Provided.
government supply line facilities .From U.G. Tanks treated water to Over Head Tank and from Over Head Tank to individual flats services.
S.T.P System , collection of all sewerage though sewer lines to the S.T.P and treated on different stages, then treated water used for flushing, plantation, and car washing etc.
All rain water collected through collected drains into the disliting chamber and then rain water harvesting fit to maintain water level in the premises.
There are mounds , kids play area, bad-Minton court, sitting benches etc.
Tree planting along with the boundary and parks area.
From UPPCL to Meter Room and line connected to HT Panel Room then Divided in LT Panel for all towers area .
shall be provided in this area which includes gym area, community area, Swimming area etc.
Through S.T.P System and then treated the water in different stages.
Disposal as per norms Premises.
Rain water Harvesting Provided as per requirement.
Solar panels shall be provided .
All Fire equipment using in all towers and all basements.
Not Applicable
All safety norms and related equipment will be provided
AS PER PLAN
Showing 2 blocks with 36 units
Total Area
24408.00 m²
262725.27 ft²
Total Units
144
1 different types
Blocks & Floors
2
18 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
50560.00 m²
544222.78 ft²