NewActive

OPULENCE PHASE A

Gautam Buddha Nagar, Uttar Pradesh
01-04-2019Launch Date
NewType
UPRERAPRJ483588RERA ID
29-10-2023Completion Date

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)12510
Project NameOPULENCE PHASE A
Registration Fee (in Rs.)68000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)55
DistrictGautam Buddha Nagar
Original Start Date-
TehsilGautam Buddha Nagar
Proposed Start Date01-04-2019
Sanctioning Competent AuthorityNoida Authority
Project Cost (in Lacs)18100
Proposed Completion Date29-10-2023

Location

Latitude

28.586880

Longitude

77.337158

Bank Details

Account no.0512339698
Name Of Account HolderSaha Estate Developers Private Limited
Bank NameKokat Mahindra Bank
Branch AddressPlot No. 31 & 32, Block – G, Sector 18, Noida – 201301(U. P.)
Branch NameKotak Mahindra Bank
IFSC CodeKKBK0000181

Development Works

Demarcation of Plots

By fixing co-ordinate point with all dimensions and tangents as per given approved drawings.

Boundary Wall

Brick work wall upto 1.2 mt. high with M.S grill above .

Road Work

R.C.C Road Finishing (trimix) 6.0 m wide has been Provided.

Footpaths

1.5 m wide path with interlocking tiles finishing has been Provided.

Water Supply Including Drinking Water Facilities

government supply line facilities .From U.G. Tanks treated water to Over Head Tank and from Over Head Tank to individual flats services.

Sewer System

S.T.P System , collection of all sewerage though sewer lines to the S.T.P and treated on different stages, then treated water used for flushing, plantation, and car washing etc.

Drain

All rain water collected through collected drains into the disliting chamber and then rain water harvesting  fit to maintain water level in the premises.

Parks

There are mounds , kids play area, bad-Minton court, sitting benches etc.

Tree Planting

Tree planting along with the boundary and parks area.

Design For Electric Supply Including Street Lighting

From UPPCL to Meter Room and line connected to HT Panel Room then Divided in LT Panel for all towers area .

Community Buildings

shall be provided in this area which includes gym area, community area, Swimming area etc.

Treatment and Disposal System of Sewage and Sullage water

Through S.T.P System and then treated the water in different stages.

Solid Waste Management And Disposal System

Disposal as per norms Premises.

Water Conservation System

Rain water Harvesting Provided as per requirement.

Energy Management System Including Use of Renewable Energy

Solar panels shall be provided .

Fire Protection And Fire Safety System

All Fire equipment using in all towers and all basements.

Social Infrastructure And Other Public Amenities Including Public Health Services

Not Applicable

Emergency Evacuation Services

All safety norms and related equipment will be provided

Other Miscellaneous Work

AS PER PLAN

Documents

Lease Deed

No: 6486 | Date: 19-12-2014

Lease Deed

No: 7882 | Date: 17-06-2016

Sale Deed

No: 8967 | Date: 25-09-2017

Details of Encumbrances

Commencement Certificate

Other Plan(If Any)

Proforma of Application Form

Proforma of Allotment Letter

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Waste Disposal Plan

Water Supply Plan

Electricity Supply Plan

Development Work Plan

Affidavit

CA CERTIFICATE

ARCHITECT CERTIFICATE

ENGINEERS CERTIFICATE

Details of Encumbrances

Uploaded: 30-01-2019

Commencement Certificate

Uploaded: 30-01-2019

Other Plan(If Any)

Uploaded: 14-03-2019

Proforma of Application Form

Uploaded: 30-01-2019

Proforma of Allotment Letter

Uploaded: 30-01-2019

Waste Disposal Plan

Uploaded: 30-01-2019

Water Supply Plan

Uploaded: 30-01-2019

Electricity Supply Plan

Uploaded: 30-01-2019

Development Work Plan

Uploaded: 30-01-2019

Affidavit

Uploaded: 14-03-2019

CA CERTIFICATE

Uploaded: 30-01-2019

ARCHITECT CERTIFICATE

Uploaded: 30-01-2019

ENGINEERS CERTIFICATE

Uploaded: 30-01-2019

Permits

Orignal Permit NoNOIDA/M.V.N/2017/IV-1504/962
Orignal Permit Date06-03-2017
Valid Upto05-03-2022
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto05-03-2025
End Date30-04-2023
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)In House
Contractor Address6 th Floor, Matrix Tower, B-4,sector 132, Noida-201301
Architect NameSMITA JAIN
Architect Address6 th Floor, Matrix Tower, B-4,sector 132, Noida-201301
Architect Licence NumberCA/2014/62840
Structural Engineer NameSUBRATA SAHA
Structural Engineer AddressA-53, 2 ND FLOOR, EAST OF KAILASH, NEW DELHI-110065
Mobile number(Project Co-ordinator)9999123785

Land Details

AFS

Showing 2 blocks with 36 units

Property Summary

Total Area

24408.00

262725.27 ft²

Total Units

144

1 different types

Blocks & Floors

2

18 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:169.50
Balconies:144
Parking ratio:0.00 per unit

Block TOWER 8

18 units

Block TOWER 9

18 units

Khasra Details

Total Area

50560.00

544222.78 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoSC-02/A8 SECTOR 150, NOIDA
Area(In Sq. Mt.)50560

Other Details

Contractor Name (if any)In House
Contractor Address6 th Floor, Matrix Tower, B-4,sector 132, Noida-201301
Architect NameSMITA JAIN
Architect Address6 th Floor, Matrix Tower, B-4,sector 132, Noida-201301
Architect Licence NumberCA/2014/62840
Structural Engineer NameSUBRATA SAHA
Structural Engineer AddressA-53, 2 ND FLOOR, EAST OF KAILASH, NEW DELHI-110065
Mobile number(Project Co-ordinator)9999123785