Project Area
Launch Date
Completion Date
RERA ID
28 42' 14.60' N
77 25' 19.70' E
Private- Free Hold Land, Demarkation was allready done before starting the project
Wandry wall on RCC Tie, Beam on RCC Footing
Cements Concrete Internal Roads( CC Roads above to Layers of WBM
Interlocking Tile, Pavers, on PCC on compected surface
to Be provided by Ghaziabad Development Athority and stores will be doned underground water tanks
Main Sewer line has been desingn as per norm ands partally led in basment ciling and will finaly conect to sawer line/ STP
Under ground Drain pipe with chaber
Land scape and park has been designed as per athority guide lines
Tree panting has been design as per Athoruty Guide lines
Design has been done as per Up electricity Board Guide lines
Club has been Design as per Athority Norms and facility like party hall gaming zone Entertanment area gym etc.
Sewage will be treted for recycline ( if required ) other wise it wiil be connected to sewar line of Authority which is allready connected to central functional STP of GDA For this locality.
Door to Door Collection and will be treated by waste disposal management.
Recycling of Treted water and rain water harwesting system to be provided.
Solar panel will be provided as per norms as sutaible Places
Fire System is being executed per the norm of department of fire.
Nursary School in the premises
Provision of exit sign and emengency light.
N/A
Total Area
5422.00 m²
58361.87 ft²